Reliability Assessment of Safety-Critical Network Communication in a Digitalized Nuclear Power Plant

In analog instrumentation and control (I and C) systems for nuclear power plants (NPPs), most connections are comprised of hardwired point-to-point types. Since they are based on analog technologies, they are fragile to noise and require analog-to-digital conversion time. Therefore, many NPPs have adopted communication network for the exchange of safety-critical data between programmable logic controllers (PLCs) in digital I and C systems to effectively accommodate a huge number of field controllers. However, the primary issue of digital network communication in a safety-critical system involves potential hazards, such as partial or total loss of communication between PLCs, which may result in a failure of safety critical signal generation when it is needed. Therefore, the probability that a safety-critical system in digitalized NPP becomes unsafe due to a network failure must be evaluated to quantify the risk of digital I and C system. In Korea, the Engineered Safety Feature-Component Control System (ESF-CCS) was developed as one of the digital safety-critical system in Advanced Power Reactor- 1400 (APR-1400). The function of a digital engineered safety feature (ESF) actuation system and field actuator controllers of conventional NPPs are performed by the ESF-CCS. In this system, safety-critical network, High Reliable- Safety Data Network (HR-SDN), was employed for the safety-critical data transmission from group controllers (GCs) to loop controllers (LCs). In this study, a framework for assessing the reliability of a HR-SDN network communication between GCs and LCs in the ESF-CCS in addition to a fault-tree model for ESF components considering network failure between GCs and LCs were developed to assess the plant risk effect of a newly developed digitalized ESF-CCS. Based on the case studies and cut set analysis, the risk effect of network failure on plant risk and the important risk contributors of network failure were quantitatively addressed. A framework for identifying the potential hazardous states of network communication in the ESFCCS was proposed. In addition, a fault-tree model for network communication failure was developed to estimate the risk effects of network failure between the GCs and LCs on ESF-CCS signal failure. The developed fault-tree model was then applied to several case studies. The fault-tree model of ESF-CCS signal failure for ESF components required for various mitigation actions regarding NPP DBAs was designed by considering the identified hazardous states of network failure that would result in a failure to provide input signals to the corresponding LC. As a sensitivity study, three case studies were performed based on the periodic test methods for hardware components in HR-SDN module and their test intervals in this study. The quantitative results for three case studies demonstrated that the probability of overall network communication failure, which was calculated as the sum of the failure probability associated with each failure cause, contributed up to 1.58% on the Small-LOCA CD frequency. The results also revealed the important basic events related to network failure in the case studies which included CCF of hardware and software in HR-SDN module. This study is expected to provide insight into the development of the fault-tree model for the network failure in digital I and C system and into the quantification of the risk effect of network failure for safety-critical data transmission in NPPs. As a further study, the risk effects of network failure in the ESF-CCS on the plant risk can be estimated in a more detailed manner by analyzing the failure modes and causes in a sub-component level and the fault detection coverage of the fault tolerance techniques for network failure implemented in ESF-CCS after the detailed configuration of ESF-CCS is decided. In terms of the failure of manual ESF actuation, the relationship among the human action failures must be investigated to consider multiple human error condition since ESF-CCS provides multiple manual actuation to assure the diversity of the system. Since the conventional HEP method cannot accommodate the multiple conditions in a fault tree, condition-based human reliability assessment (CBHRA) method or the dynamic human reliability modeling approach can be applied to include a complex relationship among the automated safety signal generation and the human operator's manual actuation, avoiding the optimistic estimation of HEP of the human action failure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mining data in a dynamic PRA framework

Computational (also known as Dynamic) Probabilistic Risk Assessment (PRA) methods employs system simulation codes coupled with stochastic analysis tools in order to determine probabilities of certain outcomes such as system failure. In contrast to classical PRA methods (i.e., Event-Tree and Fault-Tree) in which timing and sequencing of events is set by the analyst, accident progression is dictated by the system control logic and its interaction with system temporal evolution. Due to the nature of the problem, Simulation-Based PRA methods require large amount of computationally expensive simulation runs. In addition, these methods usually generate a large number of simulation runs (database storage may be on the order of gigabytes or higher). In this paper we investigate and apply several methods and algorithms to analyze these large amounts of time-dependent data. Furthermore, the scope of this article is to present a broad overview of methods and algorithms that can be used to improve data quality and to analyze and extract information from large data sets containing time dependent data. In this context, “extracting information” means constructing input-output correlations, finding commonalities, and identifying outliers.

97 MATHEMATICS AND COMPUTING↗

TH-EF-BRC-00: TG-100 Workshop

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-01: Process Mapping

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-02: FMEA

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-03: Fault Tree Analysis

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-04: Quality Management Program

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

Safety Risk Reliability Model Library

SR2ML is a software package which contains a set of safety and reliability models designed to be interfaced with the INL developed RAVEN code. These models can be employed to perform both static and dynamic system risk analysis and determine risk importance of specific elements of the considered system. Two classes of reliability models have been developed; the first class includes all classical reliability models (Fault-Trees, Event-Trees, Markov models and Reliability Block Diagrams) which have been extended to deal not only with Boolean logic values but also time dependent values. The second class includes several components aging models. Models of these two classes are designed to be included in a RAVEN ensemble model to perform time dependent system reliability analysis (dynamic analysis). Similarly, these models can be interfaced with system analysis codes to determine failure time of systems and evaluate accident progression (static analysis).

Wang, Congjian↗

Improved Sampling Algorithms in the Risk-Informed Safety Margin Characterization Toolkit

The RISMC approach is developing advanced set of methodologies and algorithms in order to perform Probabilistic Risk Analyses (PRAs). In contrast to classical PRA methods, which are based on Event-Tree and Fault-Tree methods, the RISMC approach largely employs system simulator codes applied to stochastic analysis tools. The basic idea is to randomly perturb (by employing sampling algorithms) timing and sequencing of events and internal parameters of the system codes (i.e., uncertain parameters) in order to estimate stochastic parameters such as core damage probability. This approach applied to complex systems such as nuclear power plants requires to perform a series of computationally expensive simulation runs given a large set of uncertain parameters. These types of analysis are affected by two issues. Firstly, the space of the possible solutions (a.k.a., the issue space or the response surface) can be sampled only very sparsely, and this precludes the ability to fully analyze the impact of uncertainties on the system dynamics. Secondly, large amounts of data are generated and tools to generate knowledge from such data sets are not yet available. This report focuses on the first issue and in particular employs novel methods that optimize the information generated by the sampling process by sampling unexplored and risk-significant regions of the issue space: adaptive (smart) sampling algorithms. They infer system response from surrogate models constructed from existing samples and predict the most relevant location of the next sample. It is therefore possible to understand features of the issue space with a small number of carefully selected samples. In this report, we will present how it is possible to perform adaptive sampling using the RISMC toolkit and highlight the advantages compared to more classical sampling approaches such Monte-Carlo. We will employ RAVEN to perform such statistical analyses using both analytical cases but also another RISMC code: RELAP-7.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Causal Approach to Integrate Component Health Data into System Reliability Models

Two of the challenges of current plant reliability approaches are the ability to integrate plant health data, and to support decision making. Condition based data and diagnostic/prognostic information are in fact not considered into plant reliability models to inform system engineers on the most critical components. Currently, the propagation of quantitative health data from the component to the system level is a challenge given the diverse nature/structure of the data. On the other hand, plant reliability methods (which are typically based on fault-trees or reliability block diagrams) can effectively propagate data from the component to the system level, but values of failure rates or failure probabilities are an approximated integral representation of the past industry-wide operational experience, and it neglects the present component health status (e.g., diagnostic and condition-based data) and health projection (when available from prognostic data). Our first claim is that system reliability models should propagate health information from the component to the system/plant level in order to provide a quantitative snapshot of system/plant health and identify the most critical components. Our second claim is that component health should be informed solely by that specific component current and historical performance data and should not be an approximated integral representation of the past industry-wide operational experience. This paper is directly supporting these two claims by proposing a different approach to perform reliability modeling which relies on available component diagnostic, prognostic and condition-based data to measure component health, and it propagates this information through fault tree models. The propagation of health data from the component to the system level is performed not in terms of probability, but in terms of margins where margin is defined as the “distance” between the present actual status and an undesired event (e.g., failure or unacceptable performance). Through a cause-effect lens, while classical reliability models target the effect associated to a component performance, a margin-based approach focuses on the cause of an undesired component performance (i.e., component health). Hence, thinking of reliability in terms of margins implies decision making based on causal reasoning. We will show how fault tree models can be solved using a margin language and how this process can effectively assist system engineers to identify the most critical components.

97 MATHEMATICS AND COMPUTING↗

Adaptive Sampling using Support Vector Machines

Reliability/safety analysis of stochastic dynamic systems (e.g., nuclear power plants, airplanes, chemical plants) is currently performed through a combination of Event-Tress and Fault-Trees. However, these conventional methods suffer from certain drawbacks: • Timing of events is not explicitly modeled • Ordering of events is preset by the analyst • The modeling of complex accident scenarios is driven by expert-judgment For these reasons, there is currently an increasing interest into the development of dynamic PRA methodologies since they can be used to address the deficiencies of conventional methods listed above.

99 GENERAL AND MISCELLANEOUS↗

New Methods and Tools to Perform Safety Analysis within RISMC

The Risk Informed Safety Margins Characterization (RISMC) Pathway uses a systematic approach developed to characterize and quantify safety margins of nuclear power plant structures, systems and components. What differentiates the RISMC approach from traditional probabilistic risk assessment (PRA) is the concept of safety margin. In PRA, a safety metric such as core damage frequency (CDF) is generally estimated using static fault-tree and event-tree models. However, it is not possible to estimate how close we are to physical safety limits (say peak clad temperature) for most accident sequences described in the PRA. In the RISMC approach, what we want to understand is not just the frequency of an event like core damage, but how close we are (or not) to this event and how we might increase our safety margin through margin management strategies in a Dynamic PRA (DPRA) fashion. This paper gives an overview of methods that are currently under development at the Idaho National Laboratory (INL) with the scope of advance the current state of the art of dynamic PRA.

97 MATHEMATICS AND COMPUTING↗

DYNAMIC AND CLASSICAL PRA: A BWR SBO CASE COMPARISON

As part of the Light-Water Sustainability Program (LWRS), the purpose of the Risk Informed Safety Margin Characterization (RISMC) Pathway research and development is to support plant decisions for risk-informed margin management with the aim to improve economics, reliability, and sustain the safety of current NPPs. In this paper, we describe the RISMC analysis process illustrating how mechanistic (i.e., dynamic system simulators) and probabilistic (stochastic sampling strategies) approaches are combined in a dynamic PRA fashion in order to estimate safety margins. We use the scenario of a “station blackout” (SBO) wherein offsite power and onsite power are lost, thereby causing a challenge to plant safety systems. We describe the RISMC approach, illustrate the station blackout modeling, and compare this with traditional risk analysis modeling for this type of accident scenario. In the RISMC approach the dataset obtained consists of set of simulation runs (performed by using codes such as RELAP5/3D) where timing and ordering of events is changed accordingly to the stochastic sampling strategy adopted. On the other side, classical PRA methods, which are based on event-tree (FT) and fault-tree (FT) structures, generate minimal cut sets and probability values associated to each ET branch. The comparison of the classical and RISMC approaches is performed not only in terms of overall core damage probability but also considering statistical differences in the actual sequence of events. The outcome of this comparison analysis shows similarities and dissimilarities between the approaches but also highlights the greater amount of information that can be generated by using the RISMC approach.

97 MATHEMATICS AND COMPUTING↗

The RISMC Approach to Perform Advanced PRA Analyses

The existing fleet of nuclear power plants is in the process of extending its lifetime and increasing the power generated from these plants via power uprates. In order to evaluate the impact of these two factors on the safety of the plant, the RISMC Pathway aims to develop simulation-based tools and methods to assess risks for existing nuclear power plants in order to optimize safety. This pathway, by developing new methods, is extending the state-of-the-practice methods that have been traditionally based on logic structures such as Event-Trees and Fault-Trees. These static types of models mimic system response in an inductive and deductive way respectively, yet are restrictive in the ways they can represent spatial and temporal constructs. RISMC analyses are performed by using a combination of thermal-hydraulic codes and a stochastic analysis tool currently under development at the Idaho National Laboratory, i.e. RAVEN. This paper presents a case study in order to show the capabilities of the RISMC methodology to assess impact of power uprate of a boiling water reactor system during a station blackout accident scenario. We employ the system simulator code, RELAP5-3D, coupled with RAVEN which perform the stochastic analysis. Our analysis is in fact performed by: 1) sampling values of a set of parameters from the uncertainty space of interest, 2) simulating the system behavior for that specific set of parameter values and 3) analyzing the set of simulation runs. Results obtained give a detailed investigation of the issues associated with a plant power uprate including the effects of station blackout accident scenarios. We are able to quantify how the timing of specific events was impacted by a higher nominal reactor core power. Such safety insights can provide useful information to the decision makers to perform risk informed margins management.

97 MATHEMATICS AND COMPUTING↗

DYNAMIC PRA OF A MULTI-UNIT PLANT

Dynamic Probabilistic Risk Analysis (PRA) methods couple stochastic methods (e.g., RAVEN, ADAPT, ADS, MCDET) with safety analysis codes (RELAP5-3D, MELCOR, MAAP) to determine risk associated to complex systems such as nuclear plants. Compared to classical PRA methods, which are based on static logic structures (e.g., Event-Trees, Fault-Trees), they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. Recently, special attention has been given to nuclear plants which consist of multiple units and, in particular, on the safety impact of system dependencies, shared systems and common resources on core damage frequencies. In the literature, while classical PRA methods have been employed to model multi-unit plants, Dynamic PRA methods have never been applied to analyze a full multi-unit model. This paper presents a PRA analysis of a multi-unit plant using Dynamic PRA methods. We employ RAVEN as stochastic method coupled with RELAP5-3D. The plant under consideration consists of the three units and their associated spent fuel pools (SFPs). The studied initiating event is a seismic induced station blackout event. We will describe in detail how the multi-unit plant has been constructed and, in particular, how unit dependencies and shared resources are modeled.

97 MATHEMATICS AND COMPUTING↗

RISK MONITORING CAPABILITES FROM DYNAMIC PRA DATA

Risk Monitors (RMs) are software tools that are employed in nuclear power plants to monitor the safety properties of the plant itself during operation. These safety properties are generated using classical PRA methods which are typically based on static Boolean structures such as Fault-Trees (FTs) and Event-Trees (ETs). The outcomes of these methods are Core Damage Frequency (CDF) and risk importance values of plant components (e.g., valves and pumps). Examples of Risk Importance Measures (RIMs) commonly used are: Risk Achievement Worth (RAW), Risk Reduction Worth (RRW), Birnbaum (B) and Fussell-Vesely (FV) [1,2]. In a RM these values are updated in real time once plant components status is updated (e.g., under maintenance, off-line, testing). In addition, RMs can be used to optimize maintenance schedules so those safety features of the plant are below plant standard values. This paper presents an approach to create temporal profiles of RIMs (i.e., RM capabilities) given a temporal change of the plant configuration. Instead of employing data generated by ETs and FTs, the proposed approach will employ data generated by Dynamic PRA methods. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. We will describe how classical RIMs can be generated by Dynamic PRA data and then we will show how the temporal profiles of the RIMs can be generated given a temporal profile of the system configuration.

97 MATHEMATICS AND COMPUTING↗

Linking classical PRA models to a dynamic PRA

Here, this paper presents a series of methods designed to incorporate classical Probabilistic Risk Assessment (PRA) models such as Event Trees (ETs) and Fault Trees (FTs) into dynamic PRA. In contrast to classical PRA, dynamic PRA couples stochastic methods with system simulators to determine the risks associated with complex systems such as nuclear power plants. Compared with classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the progression of the accident. As part of a dynamic PRA analysis, it is not uncommon that parts of the system to be analyzed might not require a computationally expensive simulation model. These parts could be in fact modeled by employing classical PRA models (e.g., a FT). Here, we present a set of methods and tools that can be used to link the most common classical PRA models (ETs, FTs, reliability block diagrams and Markov models) to simulation codes such as RELAP5-3D: creating a “hybrid PRA.” In order to show the potential of such an hybrid PRA we employ this method to verify ET modeling assumptions (e.g., success criteria) using a large break loss of coolant accident initiating event as a test case. In this respect, we link a set of FTs from the original PRA to the RELAP5-3D code and perform a hybrid PRA. The FTs are employed to model the control logic of several safety systems and to propagate component failures throughout the system. Provided the generated dynamic PRA data, we show how conservative assumptions in the original PRA can be identified and how such original PRA can be modified by updating success criteria captured by the set of RELAP5-3D simulation runs.

97 - MATHEMATICS AND COMPUTING↗