Search NASA⌕ Search

SEARCH · Search NASA

Results for “federal office”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration – Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Recommendations and Justifications for Modifications To Downgrade Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order (Rev. 1)

This document is part of an effort to reevaluate 37 FFACO and Administrative URs against the current Soils Risk-Based Corrective Action Evaluation Process. After reviewing 37 existing FFACO and Administrative URs, 11 URs addressed in this document have sufficient information to determine that these current URs may be downgraded to Administrative URs based on the RBCA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RBCA criteria.

54 ENVIRONMENTAL SCIENCES↗

Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order (Rev. 0)

This document is part of an effort to reevaluate 37 FFACO and Administrative URs against the current Soils Risk-Based Corrective Action Evaluation Process. After reviewing 37 existing FFACO and Administrative URs, 3 URs addressed in this document have sufficient information to determine that these current URs may be removed, based on the RBCA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RBCA criteria.

54 ENVIRONMENTAL SCIENCES↗

Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order, Revision 0

This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). Based on this evaluation, the URs were sorted into the following categories: 1. Where sufficient information exists to determine that the current UR is consistent with the RCBA criteria 2. Where sufficient information exists to determine that the current UR may be removed or downgraded based on RCBA criteria. 3. Where sufficient information does not exist to evaluate the current UR against the RCBA criteria. After reviewing all the existing FFACO URs, the 49 URs addressed in this document have sufficient information to determine that these current URs may be removed or downgraded based on RCBA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RCBA criteria.

Kidman, Lynn↗

Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order with ROTC 1, Revision No. 0

Many Federal Facility Agreement and Consent Order (FFACO) Use Restrictions (URs) have been established at various corrective action sites (CASs) as part of FFACO corrective actions (FFACO, 1996; as amended January 2007). Since the signing of the FFACO in 1996, practices and procedures relating to the implementation of risk-based corrective action (RBCA) have evolved. This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). Based on this evaluation, the URs were sorted into the following categories: 1. Where sufficient information exists to determine that the current UR is consistent with the RCBA criteria 2. Where sufficient information exists to determine that the current UR may be removed or downgraded based on RCBA criteria. 3. Where sufficient information does not exist to evaluate the current UR against the RCBA criteria. After reviewing all the existing FFACO URs, the 49 URs addressed in this document have sufficient information to determine that these current URs may be removed or downgraded based on RCBA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RCBA criteria.

54 ENVIRONMENTAL SCIENCES↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 17374

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license, granted by the competent authority in this field, which has been the Federal Office of Radiation Protection (BfS) until July 2016 and currently is the Federal Office for the Safety of Nuclear Waste Management (BfE). A first license was granted in 1983 for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) at the interim storage facility in Gorleben. This license was reviewed in 1995. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since that time at each site of an operational NPP storage facilities were licensed and erected. Thus additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow) there are now 12 storage facilities onsite the NPPs. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. The German 'Programme for the safe and responsible management of spent fuel and radioactive waste' expects to take the disposal facility into operation in the year 2050. Thus necessary preparations for interim storage till that time have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and a consulting of the German parliament (Bundestag) is mandatory if inevitable events would require an extension of currently licensed interim storage period. In the year 2016, the regulatory body in Germany was given a new structure. The BfS was formerly competent authority in the field of radiation protection since 1989. It had competencies for ionizing and non-ionizing radiation protection (e.g. mobile phone radiation, high voltage power lines and the effects of electric fields), licensing storage of spent nuclear fuel and as the operator of facilities for final disposal. Now there is a new structure with two Federal Offices (BfS and BfE) and a federal company for final disposal (BGE). The BfE is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF are now granted by this office. The search for a repository site will be coordinated there as well. The site selection, construction and operation of the repository will be in the responsibility of BGE. The parts of the former BfS dealing with recovery of the waste from Asse (a former salt mine used for disposal research) and the construction of the repository Konrad (for low and medium level radioactive waste) will be transferred into that company. It is planned to incorporate the German company for construction and management of waste disposal facilities (DBE) which is owned by the German utilities as well. The BfS will focus on the scientific foundations and further advancement of radiation protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 18137

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office for Safety of Nuclear Waste Management (BfE). In 1995, a license for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) was granted for the interim storage facility in Gorleben. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the nuclear power plant NPP Lingen. Since this time twelve NPPs erected their own storage facilities additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow). In all of these facilities the concept of dry storage in metallic dual purpose casks (DPCs) is implemented. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. In Germany the decision about a repository site will be taken in the year 2031. To enable the utilities to hand over the SNF and HAW to the repository regime while the current licenses are still valid would require a very fast process licensing and construction of the required facilities at this location. As a delay cannot be excluded, necessary preparations have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and consulting the German parliament (Bundestag) is mandatory if inevitable events would require an extension of the currently licensed interim storage period. The new structure with the Federal Office BfE, and two companies for final disposal 'Bundesgesellschaft fuer Endlagerung' (BGE mbH) and interim storage 'Bundesgesellschaft fuer Zwischenlagerung' (BGZmbH) was established in 2017. The Federal Office for Safety of Nuclear Waste Management (BfE) is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF will be granted by this office. Furthermore, it is the regulator for the repository and will finally grant a license for the German deep geological repository. Site selection and construction and operation of the repository will be the responsibility of BGE. On January 1, 2018, the BGZ will take over all remaining interim storage facilities operating under a license due to article six of the Atomic Energy Act. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on the Workshop on Accelerated Nuclear Energy Materials Development

This document reports on the Office of Nuclear Energy’s (NE’s) Workshop on Accelerated Nuclear Energy Materials Development held May 11, 2010, in Washington, DC. The purpose of the workshop was twofold: (1) to provide feedback on an initiative to use uncertainty quantification (UQ) to integrate theory, simulation, and modeling with accelerated experimentation to predict the behavior of materials and fuels in an irradiation environment and thereby accelerate the lengthy materials design and qualification process; and (2) to provide feedback on and refinement to five topical areas to develop predictive models for fuels and cladding and new radiation-tolerant materials. The goal of the workshop was to gather technical feedback with respect to the Office of Nuclear Energy’s research and development while also identifying and highlighting crosscutting capability and applicability of the initiative to other federal offices, including the Department of Energy’s (DOE’s) National Nuclear Security Administration (NNSA), Nuclear Regulatory Commission (NRC), DOE Office of Basic Energy Sciences (BES), DOE Office of Fusion Energy Sciences (FES), and Naval Reactors. The goals of the initiative are twofold: (1) develop time- and length-scale transcending models that predict material properties using UQ to effectively integrate theory, simulation, and modeling with accelerated experiments; and (2) design and develop new radiation-tolerant materials using the knowledge gained and methodologies created to shorten the development and qualification time and reduce cost. The initiative is crosscutting and has synergy with industry and other federal offices including Naval Reactors, NRC, FES, BES, and the Office of Advanced Scientific Computing Research (ASCR). It is distinguished by its use of uncertainty quantification to effectively integrate theory, simulation, and modeling with high-dose experimental capabilities. The initiative aims to bring the methodology that is being successfully applied in NNSA’s Stockpile Stewardship Program to accelerate the development of advanced nuclear energy materials. Industry, Naval Reactors, and NRC expressed support for this type of initiative and a general interest in collaboration in the area of light water reactor materials research.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sources and Source Strengths of Volatile Organic Compounds in a New Office Building

This study was conducted at a newly constructed Federal office building in Portland, OR. The primary objectives were to identify the major sources of volatile organic compounds (VOC) in the building and to measure both long-term (one-year) and short-term (several day) variations in source strengths. Samples for VOC were collected on four occasions over a period of 14 months starting with the first month of occupancy. During the final sampling period, samples were collected over four days (Friday-Monday). The samples were analyzed for individual compounds and for total VOC (TVOC). The results were expressed as specific source strengths, as well as concentrations, to facilitate comparisons of measurements made under different ventilation conditions. The primary source of VOC in the building was identified as liquid-process photocopiers and plotters which emitted a characteristic mixture of C 10 -C 11 isoparaffinic hydrocarbons. The specific source strength of TVOC, which was dominated by the office-machine emissions, remained relatively constant over the course of study. During the final four-day sampling period, the specific source strength of TVOC varied by about a factor of six with occupancy. The source strengths of many other compounds during those four days were also related to occupant activities. Motor vehicles in the below-ground parking garage were implicated as another major source of hydrocarbons in the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Konrad Repository Facing its Construction

According to the German Atomic Energy Act the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. This duty was assigned to the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS). In 1982, the Federal Institute of Physics and Metrology (Physikalisch Technische Bundesanstalt - PTB) as the precursor of BfS applied for a license for the disposal of radioactive waste with negligible heat generation in the Konrad iron ore mine near Salzgitter at the Ministry for Environment of Lower Saxony. After 25 years of plan approval procedure and subsequent lawsuits the license is now valid and Konrad is waiting for construction. Facing this challenge BfS has established a project team to supervise the in-house and external activities to be done. It is intended to construct the Konrad repository within a preparation period of two years and a subsequent erection phase of four years. Thus, Konrad is planned to come into operation in 2013. In this paper the development of the plan approval procedure, the technical design of the planned repository, especially with regard to safety-related aspects, and the planning for the construction will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risks of Hazardous Substances in Radioactive Waste for the Konrad Repository in Germany - 17522

When disposing of radioactive waste with negligible heat generation, the activity of the radionuclides is limited. However, the waste including radioactive material comprises a certain proportion of non-radioactive material. The risk of hazardous contamination of the groundwater by non-radioactive substances must be taken into account. It must be ascertained that the non-radioactive material cannot affect near-surface groundwater, which is a resource for drinking water supply. To achieve this, limit values on the amount of hazardous substances in the total waste volume shall be determined. In 2002 a regulatory approval was granted to the 'Konrad' final storage facility for radioactive waste with negligible heat generation according to the German Water Resources Act. This approval is embedded in the license (plan-approval decision) based on the German Atomic Energy Act. The approval is based on the model of a possible discharge of contaminants from the final storage facility. In a long-term simulation spanning 300,000 years, contact of the waste with the groundwater in the surrounding rock formations over the postoperational phase was conservatively assumed. The maximum amount of allowable disposal of substances - such that no concern of affecting the near-surface groundwater arises - can be derived from the solubility of the respective substances. Implementing the permit according to the Water Resources Act requires: - classification of the waste through delivery declaration obligations - monitoring the substance inspection in the waste to assess its suitability for the disposal, and - stock keeping procedures for the disposal waste by the operator. While the repository is operated by the Federal Office for Radiation Protection (BfS) (http://www.bfs.de./EN/home/home{sub n}ode;), reporting to the Federal Environment Ministry, the statutory water permit is issued and applied by the State of Lower Saxony as responsible state authority. A waste package/container list supplements a comprehensive list of substances. From this - depending on the respectively conditioned waste - material vectors can be derived. For this purpose, BfS provides a database with a substances and container list to the waste owners. In the meantime, first experiences have been collected in applying the approval. More than 540 waste containers with a total mass of almost 6,000 Mg have been controlled and are ready for disposal. In our presentation we will show the recent development in supervising the preparation for the disposal of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Construction of the Konrad Repository - Status and Perspective - 13034

Due to the Atomic Energy Act of Germany the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. The Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) is assigned with this duty. In 1982 the abandoned iron ore mine Konrad near Salzgitter (Federal State of Lower Saxony) was proposed as a repository for low and intermediate level radioactive waste with negligible heat generation. After 20 years of plan approval procedure the license was granted by the Ministry for Environment of Lower Saxony in May 2002. This decision was finally confirmed by the Federal Administrative Court in March 2007. The construction has started, but former assumptions about the beginning of waste emplacement tuned out to be too optimistic. In the course of the preparatory work and the implementation planning it turned out that many changes need to be done. As a matter of fact most of the documents and planning originate from the 1990's and need to be revised because from that time on until now no adaptation was appropriate. The necessity to apply the state-of-the-art technology and other legal implications give rise to further changes and new licensing procedures, especially building licenses. Furthermore, the license from 2002 also includes a lot of collateral clauses that need to be fulfilled before radioactive waste can be emplaced. With this in mind, the time frame for the construction of the Konrad repository was revised in 2010. As a result, the completion of the erection before 2019 does not seem to be realistic. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Retrieval project Asse II - Lessons Learned in Radiological Protection - 18263

From 1967 to 1978 in total 125,787 drums and packages with low- and intermediate level waste were emplaced in the Asse II mine. The disposal operation ended in 1978 due to a revision of the Atomic Energy Act. For the disposal of radioactive waste, a plan approval procedure would have been mandatory due to the Atomic Energy Act, but the mining law was the legal basis for operating the Asse II mine, further on. A concept for a closure of the mine was not existing at that time. On January 1, 2009, the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz BfS) became the new license-holder and operator of the Asse II mine under the Atomic Energy Act. The Act on the Organizational Restructuring in the Field of Disposal in Germany became effective on July 30, 2016. The act provides that a federally owned company, the Bundesgesellschaft fuer Endlagerung (BGE mbH, Federal Company for Radioactive Waste Disposal) is formed to carry out the operative tasks of searching for a High Level Waste (HLW) repository, the construction and operation of repositories (Konrad, Morsleben) and of the Asse II mine. Since April 25, 2017 BGE is in charge of the operative tasks that have so far been carried out by BfS. Up to now, the long-term safety of the Asse II mine has not been demonstrated in the case that all the waste will remain inside the mine. Further problems arise from a lack of host rock stability, the incomplete backfilling of the mining areas that have not been used for the emplacement of radioactive waste, and a continuous brine inflow into the mine of approx.12 m{sup 3} per day. For these reasons, according to chap. 57b of the Atomic Energy Act, the Asse II mine is to be closed without delay after retrieving the emplaced nuclear waste. Besides the recent organizational changes in Germany and the special problems giving rise to retrieve the waste, in this paper the operational experiences since 2009 on the way from mining law to atomic law will be described. This applies to the radiation protection regime, the release and clearance procedure, and some measures to boost efficiency. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Perspective of Dry Interim Storage of spent nuclear fuel (SNF) in Germany - 16504

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office of Radiation Protection (BfS). In 1995 a license to store spent nuclear fuel (SNF) and vitrified high level waste (HAW) for the interim storage facility in Gorleben was granted. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since this time each NPP erected its own storage facility and three central storage facilities have been built. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2035. During the last two years in Germany preparatory consultations to restart the process towards finding a repository took place, organised by a commission. This commission consists out of members of the scientific community, religious parties, social communities and environmental organizations as well as members of federal states governments and members of the German parliament (Bundestag). Recently the commission decided to extend its working period until summer 2016. Taking this background into account the BfS plans to intensify its research into extended interim storage with respect to potential material degradation leading to interference with safety functions (e.g. neutron shielding material). This includes topics like ageing of gasket materials which are already studied in ongoing experiments (e.g. at the Federal Institute for Materials Research and Testing) as well as studies of long term relaxation processes. Because of the need for transportation towards a repository another important field is the behaviour of the inventory under mechanical loads. For SNF, first calculations showed that because of the lower decay heat load after 60 years due to hydride reorientation the cladding might become much less ductile. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience with the Quality Control of Radioactive Waste Packages for the German Repository Konrad - 16493

The German repository Konrad for radioactive waste with negligible heat generation is designed to accept 303,000 m{sup 3} of waste packages in total. Based on the Konrad licensing conditions, any treatment and conditioning of radioactive waste should be planned and carried out in accordance with the waste acceptance requirements of the repository Konrad in order to produce waste packages suitable for disposal. The qualification of the waste treatment processes and the resulting products are achieved by interaction of different parties involved. On behalf of the Federal Office for Radiation Protection - the competent German authority for disposal of radioactive waste - TUV NORD EnSys Hannover GmbH and Co. KG acts as one of the independent expert organizations for more than twenty years in the field of qualification of waste treatment campaigns and review of waste packages documentations. The permitted amount of nuclide activity in the radioactive waste packages depends on the characteristics of the radioactive waste products. Projecting a suitable strategy for loading the waste containers contributes to determine in advance, what requirements the radioactive waste products have to fulfill as well as what properties of the waste products need to be verified and documented during conditioning or treatment process. On the basis of various examples, it is being demonstrated how appropriate advance process planning can ensure that radioactive waste packages are generated to comply with the waste acceptance requirements. In consequence, technical measures due to requalification can be avoided even in case of unpredictable difficulties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Nuclear Waste Management in Germany - Licensing Procedures for storage of SNF and Public Involvement - 19612

According to article 6 of the German Atomic Energy Act (AtG), storage of Spent Nuclear Fuel requires a license. The competent licensing authority in this field is the Federal Office for Safety of Nuclear Waste Management (BfE). According to the Act for selecting a repository site for heat-generating radioactive waste (HAW) (Site Selection Act - StandAG) dating from 2017, BfE has been assigned the task of developing, conducting, and evaluating public participation procedures in the process of site search and selection for a deep geological repository for radioactive waste and SNF. Article 6 AtG applies to interim storage of SNF. If the legally defined licensing conditions by article 6 (2) AtG are met, the storage license applied for has to be granted. For on-site facilities, interim storage has been limited to 40 years. The licensing procedures for interim storage of SNF are carried out in accordance with the general administrative procedural rules. In certain cases due to the Environmental Impact Assessment Act (EIA Act), an EIA has to be carried out. In these cases, a formalized licensing procedure including an involvement of the public is conducted. The Nuclear Licensing Procedure Ordinance (AtVfV) originating from 1977 and reformulated in 1995 defines formalized rules for the public participation procedure which have to be followed strictly. These include a public hearing. The risen objections are evaluated by the licensing authority and taken account of in the licensing decision. The process of repository site selection defined by the StandAG exceeds these formalized procedures significantly: The objective of this process is to achieve a broad social consensus about the site selection procedure and about a repository site that will offer the best possible safety for one million years. Therefore, the process has to be particularly transparent, and involvement of the public - including newly developed forms of public involvement - is an essential part of it. BfE as competent authority in both the fields of repository site search and selection and licensing of interim storage of SNF has recently developed new strategies of involving the public concerning interim storage of SNF. Supplementing the standard licensing procedures, BfE presently informs and involves the public about topical issues regarding the present state and recent developments in the field of interim storage of SNF. Current central topics are for example the return of HAW and MAW from reprocessing of SNF in France and UK as well as perspective longer interim storage periods on the interface with final disposal. Regarding longer interim storage, host communities of interim storage facilities are concerned that interim storage might be extended indefinitely. Additionally, there is a strong fear of transports of radioactive waste and SNF from one place to another. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗