Search NASA⌕ Search

SEARCH · Search NASA

Results for “firm power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Carbon-Free Energy: How Much, How Soon?

The scientific consensus is that carbon emissions need to reach net zero by 2050 to stabilize a global temperature rise below 2 degrees C. Many studies have focused on reaching net zero in the power sector by 2050 and have posited the need for clean firm power sources. Resources such as nuclear, fossil generation with carbon capture and sequestration, or other technologies would be needed to complement variable wind and solar generation.

carbon dioxide↗

Coordinated Wind Power Plant and Battery Control for Active Power Services

This article considers joint active power control of wind turbines and battery storage to follow a plant-level power reference signal. The joint control dynamically curtails the energy from a subset of the wind turbines and stores or withdraws energy from the battery to meet the power reference setpoint while accounting for wind plant aerodynamic interactions, such as wake losses. As a use case, we study the performance of the controller in maintaining a constant power output over hourly periods. A wind plant operating in this way would rely much less on other grid resources to meet its contractual agreements, thereby improving grid reliability, especially in grids with high penetration of wind and solar generation. We compare the operation of the wind plant under joint active power control to standard power-maximizing control with battery support. We present an analysis of the performance of the control system architecture. To study the impact of the battery size on performance, we simulate a 50-MW wind plant supported by batteries ranging from 8 to 64?MWh. We then evaluate the over and undergeneration penalties incurred by the plant during the simulation period.

17 WIND ENERGY↗

Economic Analysis of an Electric Thermal Energy Storage System Using Solid Particles for Grid Electricity Storage

As renewable power generation becomes the mainstream new-built energy source, energy storage will become an indispensable need to complement the uncertainty of renewable resources to firm the power supply. When phasing out fossil-fuel power plants to meet the carbon neutral utility target in the midcentury around the world, large capacity of energy storage will be needed to provide reliable grid power. The renewable power integration with storage can support future carbon-free utility and has several significant impacts including increasing the value of renewable generation to the grid, improving the peak-load response, and balancing the electricity supply and demand. Long-duration energy storage (10–100 hours duration) can potentially complement the reduction of fossil-fuel baseload generation that otherwise would risk grid security when a large portion of grid power comes from variable renewable sources. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system has promising cost and performance for the future growing energy storage needs. This paper introduces the system and components required for the particle TES to be technically and economically competitive. A technoeconomic analysis based on preliminary component designs and performance shows that the particle TES integrated with an efficient air-Brayton combined cycle power system can provide power for several days by low-cost, high-performance storage cycles. It addresses grid storage needs by enabling large-scale grid integration of intermittent renewables like wind and solar, thereby increasing their grid value. The design specifications and cost estimations of major components in a commercial scale system are presented in this paper. The cost model provides insights for further development and cost comparison with competing technologies.

27 ARPA - Advanced Research Projects Agency-Energy↗

Economic Analysis of a Novel Thermal Energy Storage System Using Solid Particles for Grid Electricity Storage: Preprint

As renewable power generation becomes the mainstream new-built energy source, energy storage will become an indispensable need to complement the uncertainty of renewable resources to firm the power supply. When phasing out fossil-fuel power plants to meet the carbon neutral utility target in the midcentury around the world, large capacity of energy storage will be needed to provide reliable grid power. The integration of renewable power and storage to support future carbon-free utility has several significant and positive impacts including expanding the renewable generation into the grid, improving the peak-load response, and balancing the electricity supply and demand. Long-duration energy storage (10–100 hours duration) can potentially complement the reduction of fossil-fuel baseload generation that otherwise would risk grid security when a large portion of grid power comes from variable renewable sources. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system has promising cost and performance for the future growing energy storage needs. This paper introduces the system and components required for the particle TES to be technically and economically competitive. A technoeconomic analysis based on preliminary component designs and performance shows that the particle TES integrated with an efficient air-Brayton combined cycle power system can provide power for several days by low-cost, high-performance storage cycles. It addresses grid storage needs by enabling large-scale grid integration of intermittent renewables like wind and solar, thereby increasing their grid value. The design specifications and cost estimations of major components in a commercial scale system are presented in this paper. The cost model provides insights for further development and cost comparison with competing technologies.

27 ARPA - Advanced Research Projects Agency-Energy↗

Assessing the Optical Performance Impact of Tracking Error in an Operational Concentrated Solar Power Plant Using Monte Carlo Ray-Tracing Simulation

Concentrating Solar Power (CSP) provides firm and dispatchable electricity due to its thermal storage and hybridization capabilities, which supports the decarbonization of our energy supply. Of the various CSP technologies, parabolic trough collectors are the most mature, with over 500 MW operating worldwide. The optical performance of parabolic trough systems is sensitive to tracking error, which is defined as the angular offset of a collector away from the sun position in the transversal plane. Tracking error commonly occurs due to non-continuous adjustment of the trough angle to point toward the sun, but other factors such as gravity, heating, and wind loading can also contribute to tracking error. Researchers have explored the impact of tracking error on optical performance both numerically and experimentally, but existing studies do not include measurements from operational utility-scale power plants. Tilt angle measurements of parabolic troughs at operational utility-scale power plants illustrate spatial variations in optical performance and include various sources of tracking error such as gravity, heating, and wind loading. To fully characterize wind driven loads on parabolic troughs, we are conducting a long-term field measurement campaign at the Nevada Solar One CSP plant located in Boulder City, NV, which has a nominal capacity of 72 MW and 0.5 hours of full-load storage. We record load measurements on four outer trough rows, collecting support structure bending moments, drive torque moments, dynamic accelerations of the spaceframe, mirror displacement, and tilt angles. Using the tilt measurements acquired at 20 Hz frequency, we calculate the deviation between the nominal sun position and the tracker angle. Using a Monte-Carlo ray-tracing simulation software, we assess the impact of the tracker angle deviation on optical performance throughout the diurnal cycle at various spatial locations within the CSP plant. In our view, this first-of-a-kind study will provide important guidance for future trough designs that reduce the impact of various sources of tracking error on performance.

concentrating solar power↗

Flexible Resource Scheduler for FAST-DERMS (FRS-FASTDERMS) v0.9

The Flexible Resource Scheduler is a hierarchical controller that manages the distributed energy resources in a distribution substation or distribution feeder to provide a firm commitment of power flow at the substation or feeder head to be scheduled in transmission-level markets as an aggregated demand resource. It is the reference controller for the FAST-DERMS Architecture, developed in tandem with the architecture under the DOE FAST-DERMS project. It is comprised of a day-ahead stochastic optimization, which schedules substation power flow and reserves, a intra-hour MPC, which generates dispatch base points for DER, and a real-time PID controller maintaining that dispatches DER to maintain the substation power around the base points. The repository also includes a representative aggregator controller, and all of the necessary components to run a simulation using PNNL's GridAPPS-D software with the controller.

MacDonald, Jason [Lawrence Berkeley National Labor↗

Concentrating solar thermal power in the U.S.: lessons from setbacks at Ivanpah, light for the future

Concentrating solar thermal power (CSP) exhibits promise as a source of firm electricity. The proposed termination of Ivanpah’s power purchase agreement hinders confidence in the country’s CSP future. This work highlights how the lack of thermal energy storage (TES) undermined the first-of-a-kind plant’s economics as California’s grid transformed. Then, possible futures of the Ivanpah facility are analyzed; results show retrofitting with state-of-the-art TES systems could provide better returns.

14 SOLAR ENERGY↗

Decision support for United States—Canada energy integration is impaired by fragmentary environmental and electricity system modeling capacity

The renewable energy transition is leading to increased electricity trade between the United States and Canada, with Canadian hydropower providing firm lower-carbon power and buffering variability of wind and solar generation in the U.S. However, long-term power purchase agreements and transborder transmission projects are controversial, with two of four proposed transmission lines between Quebec, Canada and the northeast U.S. cancelled since 2018. Here, we argue that controversies are exacerbated by a lack of open-source data and tools to understand tradeoffs of new hydropower generation and transmission infrastructure in comparison to alternatives. This gap includes impacts that incremental transmission and generation projects have on the economics of the entire system, for example, how new transmission projects affect exports to existing markets or incentivize new generation. We identify priority areas for data synthesis and model development, such as integrating linked hydropower and hydrologic interactions in energy system models and openly releasing (by utilities) or back-calculating (by researchers) hydropower generation and operational parameters. Publicly available environmental (e.g. streamflow, precipitation) and techno-economic (e.g. costs, reservoir size,) data can be used to parameterize freely usable and extensible models. Existing models have been calibrated with operational data from Canadian utilities that are not publicly available, limiting the range of scientific and commercial questions these tools have been used to answer and the range of parties that have been involved. Studies conducted using highly resolved, national-scale public data exist in other countries, notably, the United States, and demonstrate how greater transparency and extensibility can drive industry action. Improved data availability in Canada could facilitate approaches that (1) increase participation in decarbonization planning by a broader range of actors; (2) allow independent characterizations of environmental, health, and economic outcomes of interest to the public; and (3) identify decarbonization pathways consistent with community values.

13 HYDRO ENERGY↗

Geothermal Representation in Power System Models

Power system models generally fail to capture the range of characteristics geothermal resources provide and the value they potentially contribute to decarbonization and reliability of future electricity grids as firm, dispatchable, non-combustion power resources. This study reviews the results of power system modeling efforts to investigate geothermal deployment potential in the United States, including the U.S. DOE GeoVision analysis and ongoing modeling and analysis efforts to support planning and development of future grids with 100% renewable energy in California. Several themes are identified that could be implemented immediately to improve the accuracy of geothermal representation in power system models: consistency of model inputs, modeling of baseload and dispatchable geothermal resources, accurate valuation of grid services, improved representation of capacity factor, use of contemporary LCOE estimates, improved understanding of the evolution of geothermal value, and use of accurate resource potential constraints. Many of the models reviewed produced significantly different amounts of geothermal resource selection - even when modeling the same region and time period. This highlights the variability of inputs and assumptions among models, so creating a consistent set of geothermal inputs is a first step toward more accurate representation of geothermal in models. Research opportunities are identified that could help improve geothermal data inputs in modeling efforts, including analyses of historical data, sensitivity to model inputs, and comparative value of geothermal generators as baseload or dispatchable resources. Outcomes of such research can inform the geothermal community about how best to guide geothermal development toward wider deployment in support of future electricity grids through improved understanding of the evolution of geothermal value over time and the characteristics that contribute to that value.

capacity expansion models↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

balancing authority↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Concentrating Solar Power (CSP) Plant Optimization Study for the California Power Market (CalCSP)

In the United States, many states are implementing goals to achieve 100% carbon free power generation by 2050 or sooner. California has one of the more aggressive goals to achieve 100% carbon free generation of its retail power sales by 2045. California has excellent solar resources, but to accomplish this goal, California’s power utilities will need new zero carbon resources that can replace the natural gas units that they currently rely on for suppling power at night. Appropriately configured concentrating solar power plants with thermal energy storage are an option to serve this nighttime load. These plants would be designed to take advantage of CSP’s low-cost thermal energy storage and collect and store energy during the day and then be dispatched to produce power at night. The U.S. Department of Energy has funded a study to identify the design of a CSP plant that optimally meets the evolving CA grid needs. This will be done by taking a fresh look at how CSP technologies can best be designed to meet the emerging nighttime market for carbon free power generation or zero-carbon firm resources. The paper provides an overview of the study and present preliminary findings on the California power market requirements, CSP configurations, technoeconomic analysis, siting opportunities, and key issues for CSP deployment in this market.

Price, Hank (ORCID:0000000267049197)↗

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗

System and Component Development of Particle-Based Pumped Thermal Energy Storage

Reliable power supply from variable renewable resources requires energy storage at various scales to overcome resource intermittency. Long-duration energy storage (LDES, 10-100 hours) can improve dispatchability and grid reliability with increasing levels of renewable power supply. Thermal energy storage (TES) has siting flexibility and the ability to store a large capacity of energy, and thus has the potential to meet the LDES need and provide charging and discharging durations beyond the economic capacity of conventional batteries. TES technology has evolved from concentrating solar thermal power (CSP) generation and is recognized as an economic large-scale energy storage method. A standalone electric-thermal energy storage system supporting renewable integration of wind and solar power without CSP solar field can firm renewable generation and boost overall grid resilience and security.

concentrating solar thermal power↗

Preliminary Component Design and Cost Estimation of a Novel Electric-Thermal Energy Storage System Using Solid Particles

Energy storage will become indispensable to complement the uncertainty of intermittent renewable resources and to firm the electricity supply as renewable power generation becomes the mainstream new-built energy source and fossil fuel power plants are phased out to meet carbon-neutral utility targets. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system is projected to have promising cost and performance characteristics to meet the future growing energy storage needs. This paper introduces the system and components required for particle TES to become technically and economically competitive. The system integrates electric particle heaters, particle TES within insulated concrete silos, and an efficient air-Brayton combined-cycle power system to provide power for storage durations up to several days via low-cost, high-performance storage cycles. Design specifications and cost estimation of major components in a commercial-scale system are presented in this paper. A techno-economic analysis based on preliminary component designs and performance indicates that particle TES integrated with an air-Brayton combined-cycle power system has a path to achieve the targeted levelized cost of storage of 5 ¢/kWh-cycle at a round-trip efficiency of 50% when taking low-cost energy-specific components and leveraging basic assets from existing thermal power plants. The cost model provides insights for further development and economic potentials for long-duration energy storage.

14 SOLAR ENERGY↗

Valuing EV Managed Charging for Bulk Power Systems

When and where electric vehicle (EV) charging occurs has significant implications for power systems supporting widespread EV adoption, especially with high shares of wind and solar generation. This study extends previous works by leveraging detailed simulation models for EV adoption, EV use, EV charging, and bulk power system operations, and by linking them with methods for describing charging flexibility at both the individual vehicle and aggregate levels. This technical potential study focuses on how the value of EV managed charging (EVMC) changes depending on charging flexibility type (within-charging session or within-week scheduling), dispatch mechanism (direct load control or one of several price-based mechanisms), and managed charging participation rate. We show that naively aggregating EV charging flexibility from individual vehicles into megawatt-scale resources grossly overestimates the flexibility of the fleet, because such aggregate models can unrealistically pair, e.g., one already-fully-charged vehicle's ability to increase load with another already-charging vehicle's ability to accept more charge, effectively requesting a charging rate that is infeasible for the latter vehicle. We find per-vehicle bulk system value is highest at low participation rates for all dispatch mechanisms. Factoring in production cost savings, avoided firm capacity savings, and combustion-related power sector emissions savings, we estimate the value of EVMC at low participation rates (5%) to be $33/vehicle-year to $69/vehicle-yr for within-session charging flexibility and $40/vehicle-yr to $120/vehicle-yr for within-week charging flexibility in an envisioned 2038 New England power system and monetary value reported in 2016 U.S. dollars. At 100% participation, per-vehicle value declines to $25/vehicle-yr to $31/vehicle-yr for within-session charging flexibility and to $29/vehicle-yr to $36/vehicle-yr for within-week charging flexibility; however, 100% participation yields the highest total system savings.

ADVANCED PROPULSION SYSTEMS↗

Coordination and Planning for Water and Power System Resilience (Workshop Report)

Water and power utilities are interdependent, subject to many of the same natural and manmade hazards, and critical for the well-being of communities and society. In April 2021, a virtual workshop was held that brought together representatives from water, wastewater, and electric utilities; government organizations; water and electricity based professional associations; consulting firms; and researcher organizations to explore water and power system interdependencies and resilience. The workshop, organized by Pacific Northwest National Laboratory (PNNL) and funded by the United States Department of Energy (DOE) Water Power Technologies Office (WPTO), explored a vision for coordinated and resilient water and electric utilities of the future and identified barriers and strategies for increased coordination and integrated planning between water and power utilities. Workshop participants suggested next steps and areas where federal research and support would be beneficial. This report documents that key outcomes of the workshop.

13 HYDRO ENERGY↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗