Search NASA⌕ Search

SEARCH · Search NASA

Results for “flagship”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The large ultraviolet optical infrared surveyor (LUVOIR) study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale within the context of NASA’s flagships cost and schedule performances to date. While NASA’s flagships perform exquisitely once on orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA’s future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship’s lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA’s current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity. This paper briefly comments on the motivations for NASA’s flagships and on the science motivations for a LUVOIR-like mission. We argue the incentives for improving NASA’s flagships development cost and schedule performance. We review the specific additional challenges of NASA’s flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagships and other large government projects lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA’s flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA’s future flagship’s cost and schedule performance.

Crooke, Julie A.↗

Evolving Management Strategies to Improve NASA Flagship's Cost and Schedule Performance: LUVOIR as a Case Study

The LUVOIR study process has brought to fruition an extremely exciting scientific mission concept. The 3.5 year LUVOIR study duration enabled an unprecedented level of scientific, engineering, and technology thoroughness prior to the Astro2020 Decadal. This detail also shed light on many technical and programmatic challenges for efficiently developing a mission of this scale. While NASA's flagships perform exquisitely once on-orbit, there is understandable growing frustration in their development cost and schedule overruns. We felt it incumbent upon ourselves to ask how we could improve on delivering LUVOIR (or any of NASA's future flagships) on schedule and on budget, not just for the next mission, but for all NASA large strategic missions to come. We researched past and current NASA flagship's lessons learned publications and other large government projects that pointed to some systemic challenges that will only grow with larger and more complex strategic missions. Our findings pointed us to some ways that could potentially evolve NASA's current flagship management practices to help improve on their development cost and schedule performance despite their growing complexity.. This paper briefly comments on the science motivation for NASA's flagships and on the science motivation for a LUVOIR-like mission. We argue the motivation for improving NASA's flagships development cost and schedule performance. We review the specific challenges of NASA's flagships to acknowledge their specific issues. We then examine the most repeated systemic challenges we found from previous NASA flagship and other large government project lessons learned/observed. Lastly, we offer recommendations to tackle these repeated systemic challenges facing NASA's flagships. The recommendations culminate into a proactive integrated development and funding framework to enable improving the execution of NASA's future flagship's cost and schedule performance.

Crooke, Julie A.↗

Managing Flagship Missions to Reduce Cost and Schedule

Flagship missions are highly complex with highly nested systems. This level of complexity poses unique management problems as complexity influences risk which, in turn, affects cost and schedule. Establishing a strong technical and programmatic leadership team is critical to mission success. Developing and using a mission architecture is critical to informing the management organization, product ownership, interface and integration relationships, schedule organization, and integration and test paths. In highly nested systems, the mission phasing can be significantly out of sync with product phasing. Targeted technology development prior to Phase A is critical to reducing risk. Early architecture, concept design, and requirements development is critical to reducing risk. Modular design; pathfinders; parallel manufacturing and integration and test paths; and properly handling institutional requirements across interfaces are all management techniques that can be applied to reduce risk. NASA’s large strategic missions, sometimes referred to as flagship missions, are designed to provide answers to some of the most compelling scientific questions being asked. These types of missions are a series of highly nested subsystems that pose unique management problems when compared to more traditional instrument and spacecraft designs. They typically have an overall architecture that is very complex and nested; they typically require a tremendous amount of technology development; they typically involve many contractors and subcontractors with many associated contracts; and they typically involve staff from all over the world. Successful management of a flagship requires the balance between science requirements, engineering and technology capabilities, and resource constraints. Mismanaging these flagship missions can and will lead to significant cost and schedule growth, both of which are detrimental to NASA’s overall reputation which, in turn, is detrimental to the development of future flagship missions. While many of the same management principles used on smaller instruments and spacecraft are relevant, managing flagship missions requires an evolution of those current best practices to better address the specific needs and additional complexity and vastness of these missions. This paper explores how to leverage lessons learned from previous flagship missions to better manage flagship missions in the future.

Hylan, Jason↗

Challenges and Potential Solutions to Develop and Fund NASA Flagship Missions

Large, strategic "Flagship" missions have unique characteristics that lead to challenging developmental difficulties for the National Aeronautics and Space Administration (NASA). Missions such as the Hubble Space Telescope (HST), James Webb Space Telescope (JWST), and the Mars Science Laboratory (MSL) had technical and programmatic challenges that led to significant schedule delays and subsequent cost growth. Although NASA has instituted policies that have reduced cost growth for more "typical" NASA science missions, NASA Flagship missions remain a distinct challenge due to their requirement to provide unprecedented science or tackle bold exploration goals, typically while concurrently developing new technologies. The unique challenges presented by Flagship missions make it extremely difficult to fully predict cost and schedule given that the technical and programmatic advances needed to meet performance requirements are unprecedented. This paper addresses why Flagship missions are unique and proposes a new programmatic approach to develop and fund Flagship missions.

Develop↗

Challenges and Potential Solutions to Develop and Fund NASA Flagship Missions

Large, strategic "Flagship" missions have unique characteristics that lead to challenging developmental difficulties for the National Aeronautics and Space Administration (NASA). Missions such as the Hubble Space Telescope (HST), James Webb Space Telescope (JWST), and the Mars Science Laboratory (MSL) had technical and programmatic challenges that led to significant schedule delays and subsequent cost growth. Although NASA has instituted policies that have reduced cost growth for more "typical" NASA science missions, NASA Flagship missions remain a distinct challenge due to their requirement to provide unprecedented science or tackle bold exploration goals, typically while concurrently developing new technologies. The unique challenges presented by Flagship missions make it extremely difficult to fully predict cost and schedule given that the technical and programmatic advances needed to meet performance requirements are unprecedented. This paper addresses why Flagship missions are unique and proposes a new programmatic approach to develop and fund Flagship missions.

flagship missions↗

Aerocapture: An Enabling Technology for Flagship-Class Uranus Orbiter and Probe Mission

Introduction: The current decadal survey published by the National Academies of Sciences has informed National Aeronautics and Space Administration (NASA) to prioritize the study of the Ice Giants, especially Uranus. To gather the required data that addresses the science questions raised in this survey, a mission to Uranus with an orbiter and atmospheric probe must be designed. The Uranus Orbiter and Probe (UOP) study, which the survey identified as the flagship mission of this decade, proposes a 2031 launch to take advantage of a Jupiter fly-by and utilizes a fully propulsive orbit insertion design with an Earth-to-Uranus transit times ranging from 13 to 15 years. This fully propulsive orbit insertion at Uranus will be very fuel expensive (wet mass percentages of around 60-70\%) thereby leaving less mass for the scientific payload and additional planetary probes. In addition, scientists are more interested in visiting Uranus before 2049, when the Spring Equinox will occur, as it allows studying Uranus seasons not seen during Voyager 2's flyby in 1987. A NASA Flagship-Class mission would require at least 10 years of lead time prior to launch thereby making the 2031 launch to take advantage of the Jupiter fly-by extremely challenging. The consequence of missing the Jupiter fly-by and launching in the late 2030s is the challenge of a fully-propulsive mission like UOP to have a feasible alternative interplanetary trajectory that reaches Uranus before 2050. As an alternative, to address the shortcomings of the fully propulsive mission, one can design a mission to Uranus using aerocapture. What is aerocapture: Aerocapture is an atmospheric maneuver that uses aerodynamic forces generated by flight within a planetary atmosphere to decelerate and achieve orbit insertion. Using aerocapture allows one to provide the change in velocity (Delta V) needed to slow down from the approach hyperbolic trajectory to achieve the desired captured orbit around the target planet using aerodynamic forces of the vehicle (lift and drag). Using aerodynamic forces instead of fully-propulsive maneuvers results in significant savings in the fuel. Furthermore, aerocapture can also allow one to consider interplanetary trajectories with higher approach hyperbolic velocities, thus reducing the mission transit times. Aerocapture as an enabling technology: To use aerocapture as an enabling technology for the Uranus exploration mission, one would require an integrated system-level design, including a Thermal Protection System (TPS), hardware needed for aerodynamic modulation, and autonomous Guidance, Navigation, and Control (GNC) systems. Aerocapture has yet to be demonstrated, despite considering it for several past missions. Recent advancements in TPS and GNC capabilities show the potential for using rigid, heritage entry vehicle configurations already flown at other planetary bodies for Uranus aerocapture. Aerocapture can be a robust technology that can deliver spacecraft to Uranus science orbits while substantially increasing on-orbit payload mass (more than 40\%) that can enable robust atmospheric entry probes. Additionally, the aerocapture maneuver would reduce the interplanetary transit time by 2–5 years (15-30\%) relative to fully-propulsive orbit insertion. Recent work has shown that one can conduct a flagship-class mission in a shorter period than fully-propulsive missions if using aerocapture. What does aerocapture bring in for a Uranus Mission: Using aerocapture for a Uranus orbiter and atmospheric probe mission can provide one with considerable propellant savings. Spacecraft in interplanetary trajectories to Uranus typically need an Delta V in orders of kilometers per second to insert into science orbit. One would require thousands of kilograms of fuel to achieve such a Delta V using a traditional fully propulsive maneuver, leaving less mass for payload during the mission launch. Aerocapture can reduce the propulsion needs by dissipating energy in the sizable atmosphere of Uranus without a significant mass increase due to the need for an aeroshell. One can use the mass savings achieved using the aerocapture to reduce the launch vehicle requirements. In addition, one can also have additional science instruments on the orbiter or create a robust instrumentation suite on an atmospheric probe that can significantly increase the science outcome of the Uranus exploration mission. Furthermore, since aerocapture performance is relatively insensitive to increases in hyperbolic excess velocity, one can design the interplanetary trajectory to arrive at Uranus faster, reducing the interplanetary transit time and operations cost. All these savings, achieved using aerocapture, could help fit a larger class mission, such as the Uranus mission within a smaller capital, e.g., a Flagship-class orbiter mission in a New Frontiers class capital. Summary: This talk will provide an overview of how aerocapture can enable the Uranus exploration mission. Specifically, this talk will discuss the latest advancements made in the Uranus aerocapture study, such as investigating interplanetary trajectories with higher hyperbolic approach velocities and their implications on the aero heating and the TPS design, incorporating FNPAG (an advanced numerical-predictor guidance) and comparison of multiple navigation approaches. In addition, this talk will focus on mechanical design that can house more than one atmospheric probe and the six degrees of freedom simulation of aerocapture at Uranus. Findings from a recent NASA Space Technology Mission Directorate (STMD)-funded activity studying the aerocapture as an enabling technology for a Uranus orbiter will be presented. Using the science payload recommended by the Decadal Survey for Uranus exploration, this work shows many improvements over the baseline fully-propulsive mission. These improvements include a shorter cruise phase, flexibility in launch opportunities late into the 2030s while reaching Uranus before the 2050 equinox for the desired science opportunities, and lower propellant mass needs. This talk will highlight how aerocapture can be utilized for Uranus science orbit insertion using a lower-risk, heritage entry vehicle configuration used extensively as a Mars entry, descent, and landing vehicle. Furthermore, this talk will explore how the demonstration of aerocapture at Earth can benefit the aerocapture-enabled Uranus mission.

Aerocapture↗

Aerocapture Solutions for Uranus Flagship-class Orbiter and Probe

Recent planetary mission assessments, such as the 2022 Planetary Science Decadal Survey released by the National Academies of Science, have focused on the need for a flagship-class mission to the Ice Giant planets, particularly Uranus. The Uranus Orbit and Probe mission proposal was used by the National Academies of Science as the baseline while making its recommendation as the top flagship-class mission for NASA in the 2020-2030\'s. This mission which was based on a launch date of 2031 or 2032, used a fully-propulsive orbit insertion maneuver at Uranus (requiring 60-70% of total mass for propellant), and reached the planet after 13 years of interplanetary cruise before the 2049 equinox, a goal of the science community. A pre-2033 launch date is required to conduct a necessary Jupiter fly-by as the giant planet will be not be in the proper alignment for a later launch date. However, as the budget constraints of the NASA budget have pushed back the start date of a Uranus mission, a launch date of a flagship mission before 2033 seems unreasonable. Aerocapture, an orbit insertion maneuver that uses the atmosphere to decelerate, can reduce the propellant load needed for a captured orbit. Additionally, the aerocapture maneuver can decelerate safely while approaching the planet at higher arrival velocities, thus allowing a mission to use a highly energetic trajectory and reduce the cruise time by several years. An aerocapture-enabled solution has launch opportunities in the mid 2030's, including as late as 2038 to reach Uranus by 2049. This paper will discuss the feasibility of an aerocapture option for a Flagship-class mission to Uranus.

Soumyo Dutta↗

Aerocapture Solutions for Uranus Flagship-class Orbiter and Probe

Recent planetary mission assessments, such as the 2022 Planetary Science Decadal Survey released by the National Academies of Science, have focused on the need for a flagship-class mission to the Ice Giant planets, particularly Uranus. The Uranus Orbit and Probe mission proposal was used by the National Academies of Science as the baseline while making its recommendation as the top flagship-class mission for NASA in the 2020-2030\'s. This mission which was based on a launch date of 2031 or 2032, used a fully-propulsive orbit insertion maneuver at Uranus (requiring 60-70% of total mass for propellant), and reached the planet after 13 years of interplanetary cruise before the 2049 equinox, a goal of the science community. A pre-2033 launch date is required to conduct a necessary Jupiter fly-by as the giant planet will be not be in the proper alignment for a later launch date. However, as the budget constraints of the NASA budget have pushed back the start date of a Uranus mission, a launch date of a flagship mission before 2033 seems unreasonable. Aerocapture, an orbit insertion maneuver that uses the atmosphere to decelerate, can reduce the propellant load needed for a captured orbit. Additionally, the aerocapture maneuver can decelerate safely while approaching the planet at higher arrival velocities, thus allowing a mission to use a highly energetic trajectory and reduce the cruise time by several years. An aerocapture-enabled solution has launch opportunities in the mid 2030's, including as late as 2038 to reach Uranus by 2049. This paper will discuss the feasibility of an aerocapture option for a Flagship-class mission to Uranus.

Soumyo Dutta↗

Establishing a Resilient Flagships Science Program

We are at a crossroads today with large and complex missions, known as flagships: while much has been achieved to lower their size, weight, and power demands, there are science questions that cannot be answered but through the exquisite measurements characteristic of flagships. We need an approach to a resilient flagships program for science: One, conduct an assessment of the fundamental science questions and concept feasibility study to define the core science requirements (those that, if not met, render the mission unnecessary), and the corresponding technology challenges.

Francesco Bordi↗

COMPASS Final Report: Saturn Moons Orbiter Using Radioisotope Electric Propulsion (REP): Flagship Class Mission

The COllaborative Modeling and Parametric Assessment of Space Systems (COMPASS) team was approached by the NASA Glenn Research Center (GRC) In-Space Project to perform a design session to develop Radioisotope Electric Propulsion (REP) Spacecraft Conceptual Designs (with cost, risk, and reliability) for missions of three different classes: New Frontier s Class Centaur Orbiter (with Trojan flyby), Flagship, and Discovery. The designs will allow trading of current and future propulsion systems. The results will directly support technology development decisions. The results of the Flagship mission design are reported in this document

Oleson, Steven R.↗

Mission Architecture and Technology Options for a Flagship Class Venus In Situ Mission

Venus, as part of the inner triad with Earth and Mars, represents an important exploration target if we want to learn more about solar system formation and evolution. Comparative planetology could also elucidate the differences between the past, present, and future of these three planets, and can help with the characterization of potential habitable zones in our solar system and, by extension, extrasolar systems. A long lived in situ Venus mission concept, called the Venus Mobile Explorer, was prominently featured in NASA's 2006 SSE Roadmap and supported in the community White Paper by the Venus Exploration Analysis Group (VEXAG). Long-lived in situ missions are expected to belong to the largest (Flagship) mission class, which would require both enabling and enhancing technologies beside mission architecture options. Furthermore, extreme environment mitigation technologies for Venus are considered long lead development items and are expected to require technology development through a dedicated program. To better understand programmatic and technology needs and the motivating science behind them, in this fiscal year (FY08) NASA is funding a Venus Flaghip class mission study, based on key science and technology drivers identified by a NASA appointed Venus Science and Technology Definition Team (STDT). These mission drivers are then assembled around a suitable mission architecture to further refine technology and cost elements. In this paper we will discuss the connection between the final mission architecture and the connected technology drivers from this NASA funded study, which - if funded - could enable a future Flagship class Venus mission and potentially drive a proposed Venus technology development program.

Balint, Tibor S.↗

Encealdus Orbilander: A Flagship Mission Concept for Astrobiology

"Whether life exists beyond Earth remains a fundamental question driving our exploration of the Solar System. At Saturn’s moon Enceladus, plumes of oceanic material vented into space allow the investigation of the astrobiological potential of an ocean world, hinted at by Cassini, without the necessity of drilling through kilometers of ice crust. The Enceladus Orbilander is a flagship ($2.56B in fiscal year 2025 dollars) mission concept created for the 2023–2033 Planetary Science Decadal Survey. Orbilander takes full advantage of the opportunity provided by Enceladus’ plumes to search for signs of life. A single spacecraft both orbits and lands, capturing samples from four distinct reservoirs offered by the plumes. These samples, both particulate and vapor, are then analyzed by the Life Detection Suite (LDS), a set of five instruments conducting complementary and orthogonal biosignature-seeking measurements. To provide the context that specifically enhances interpretation of LDS measurements, geochemical and geophysical investigations are conducted both in orbit and on the surface. These reveal the physio-chemical state of the ocean and core as well as the processes involved in ejection of plume material and how these affect the ocean material analyzed by the LDS. The Orbilander can be delivered to the Saturn system via several launch vehicle and trajectory options, including a direct trajectory (7-year cruise), a ∆V-EGA trajectory (9-year cruise) and several options using an inner cruise with Venus and Earth flybys (10-year cruise). Upon Saturn Orbit Insertion, a 4-year moon tour pumps down the Orbilander’s orbit to intercept Enceladus. The most optimal arrival times balance the Jupiter flyby opportunities of the late 2030s and solar illumination at the Enceladus high southern latitudes where plume material is most abundant. This mission concept therefore targets project start in 2030. Upon Enceladus Orbit Insertion, the Orbilander begins a 1.5-year-long campaign of landing site reconnaissance, remote sensing science, and collecting sufficient plume sample to run all but one of the LDS measurements. After successful landing, the Orbilander spends 2 years on the surface conducting multiple LDS measurements with all five instruments on actively and passively collected plume material, as well as seismic investigations. The schedule laid out here is well-defined, but the mission also has operational and resource flexibility should additional reconnaissance be needed. As part of the design study, mission and development risks were identified and mitigation strategies proposed. Technologies key to achieving the life detection science objectives include instrumentation matured under programs like COLDTech and ICEE-2, such as aspects of the sampling system and microfluidic devices, as well as well-known techniques like high-resolution and separation-capable mass spectrometers. Autonomous onboard navigation is planned to maintain a halo orbit around Enceladus to enable passive sampling from orbit as well as reconnaissance measurements for use in site selection and landing. Terrain relative navigation is included to ensure safe landing, given that targeted areas may contain landing hazards. Continued development of radioisotope thermoelectric generator (RTG) technology and long-life batteries is essential for this long duration mission. The Enceladus Orbilander represents an optimal point in the trade space of science value versus cost, taking advantage of the extensive knowledge of Enceladus provided by Cassini, how well Enceladus lends itself to a search for life in material from its ocean, and the flexibility afforded by the innovative design developed by the APL team. By taking full advantage of Enceladus’ plumes both in orbit and on the surface, Orbilander represents a robust search for life with complementary and orthogonal biosignatures as well as contextual geophysical and geochemical measurements, determining not only whether Enceladus is inhabited (at levels up to 500,000× scarcer than in Earth’s oceans) but also why. "

Exobiology↗

Titan Flagship Mission 3-Degree-of-Freedom Simulation Analysis

A NASA flagship mission to Titan, the largest moon of Saturn and the only moon in the solar system with a significant atmosphere, has been designed that uses three separate spacecraft, each requiring significant interaction with the atmosphere. The first vehicle is a Titan lander for lower-atmosphere and surface science. The second is an aerial vehicle for aerial science at approximately 10 km altitude with an expected lifetime of one year. This spacecraft will use the natural winds of Titan to cover a large area over its lifetime. The third vehicle is a Titan orbiter that will interact with the atmosphere in two respects. The first atmospheric interaction is the orbital insertion maneuver that will be accomplished using aerocapture, during which time the hyperbolic approach of 6.5 km/s will be reduced to 1.6 km/s over 41 minutes with an exit periapsis altitude of 130 km. The second atmospheric interaction occurs after a propulsive maneuver has raised the periapsis after aerocapture to 1170 km, where the atmosphere will be sampled over several months. This is the first phase of aerosampling that covers southern latitudes. After a 3.3-year circular science phase at an altitude of 1700 km, a second phase of additional aerosampling is performed sampling northern latitudes. The atmospheric trajectory analysis for these three spacecraft will be discussed throughout this paper.

Prince, Jill L.↗

Overview of 2008 Outer Planet Flagship Studies

This slide presentation reviews the process involved in the Phase-2 studies for the next Outer Planets Flagship (OPF). These studies will be a cooperative effort with ESA and JAXA in partnership with NASA. The annoucement of oppurtunity (AO) for the science instruments and the launch approval/planetary protection processes are reviewed. There is also discussion about capturing relevant lessons from the Cassini team, supporting international collaboration, and support for science definition teams. Some mission specific tasks are also reviewed, for the three missions being proposed: (1) Europa Explorer, (2) Jupiter System Observer and (3) Titan Explorer. A timeline for the studies is also included.

outer planets↗

Heat Shields for Aerogravity Assist Vehicles Whose Deceleration at Titan Saves Mass for Future Flagship Class Exploration of Enceladus

A mission of great Astrobiological interest is one that would search for life signatures associated with the oceans and geysers of Enceladus [1]. Spilker et al., [2] have shown in a 2009 paper that use of an Aerogravity Assist (AGA) maneuver with a blunt body in Titan’s atmosphere could enable a Flagship Class Mission to Enceladus within reasonable cost ($3 B) and mission duration (14 years). This paper will summarize the 2023 Decadal Survey (DS) Whitepaper by Arnold, et al. [3] that estimated heat shield masses for an AGA vehicle whose deceleration in Titan’s atmosphere saves mass for future missions to explore Enceladus. This study focused on Titan AGA for an Enceladus lander corresponding to mission “E” in the Spilker, et al. paper [2]. The analysis is the first reported for heat shield requirements for an AGA aeroshell that accounts for the convective and radiation heating arising from flight in Titan’s atmosphere.

James O. Arnold↗

Neptune Odyssey: A Flagship Concept for the Exploration of the Neptune–Triton System

The Neptune Odyssey mission concept is a Flagship-class orbiter and atmospheric probe to the Neptune–Triton system. This bold mission of exploration would orbit an ice-giant planet to study the planet, its rings, small satellites, space environment, and the planet-sized moon Triton. Triton is a captured dwarf planet from the Kuiper Belt, twin of Pluto, and likely ocean world. Odyssey addresses Neptune system-level science, with equal priorities placed on Neptune, its rings, moons, space environment, and Triton. Between Uranus and Neptune, the latter is unique in providing simultaneous access to both an ice giant and a Kuiper Belt dwarf planet. The spacecraft—in a class equivalent to the NASA/ESA/ASI Cassini spacecraft—would launch by 2031 on a Space Launch System or equivalent launch vehicle and utilize a Jupiter gravity assist for a 12 yr cruise to Neptune and a 4 yr prime orbital mission; alternatively a launch after 2031 would have a 16 yr direct-to-Neptune cruise phase. Our solution provides annual launch opportunities and allows for an easy upgrade to the shorter (12 yr) cruise. Odyssey would orbit Neptune retrograde (prograde with respect to Triton), using the moonʼs gravity to shape the orbital tour and allow coverage of Triton, Neptune, and the space environment. The atmospheric entry probe would descend in ∼37 minutes to the 10 bar pressure level in Neptune’s atmosphere just before Odysseyʼs orbit-insertion engine burn. Odysseyʼs mission would end by conducting a Cassini-like “Grand Finale,” passing inside the rings and ultimately taking a final great plunge into Neptuneʼs atmosphere.

Abigail M. Rymer↗