Rule-Based Flight Software Cost Estimation

This paper discusses the fundamental process for the computation of Flight Software (FSW) cost estimates. This process has been incorporated in a rule-based expert system [1] that can be used for Independent Cost Estimates (ICEs), Proposals, and for the validation of Cost Analysis Data Requirements (CADRe) submissions. A high-level directed graph (referred to here as a decision graph) illustrates the steps taken in the production of these estimated costs and serves as a basis of design for the expert system described in this paper. Detailed discussions are subsequently given elaborating upon the methodology, tools, charts, and caveats related to the various nodes of the graph. We present general principles for the estimation of FSW using SEER-SEM as an illustration of these principles when appropriate. Since Source Lines of Code (SLOC) is a major cost driver, a discussion of various SLOC data sources for the preparation of the estimates is given together with an explanation of how contractor SLOC estimates compare with the SLOC estimates used by JPL. Obtaining consistency in code counting will be presented as well as factors used in reconciling SLOC estimates from different code counters. When sufficient data is obtained, a mapping into the JPL Work Breakdown Structure (WBS) from the SEER-SEM output is illustrated. For across the board FSW estimates, as was done for the NASA Discovery Mission proposal estimates performed at JPL, a comparative high-level summary sheet for all missions with the SLOC, data description, brief mission description and the most relevant SEER-SEM parameter values is given to illustrate an encapsulation of the used and calculated data involved in the estimates. The rule-based expert system described provides the user with inputs useful or sufficient to run generic cost estimation programs. This system's incarnation is achieved via the C Language Integrated Production System (CLIPS) and will be addressed at the end of this paper.

computational intelligence

Advanced Statistical Methods in Spacecraft Flight Software Cost Estimation: Bayesian Regression and Nonlinear Principal Components Analysis to Support System Engineering in the Early Project Lifecycle

This paper provides an overview of the new features and model updates in the upcoming release of the NASA Analogy Software Cost Tool (ASCoT). ASCoT, hosted within the Online NASA Space Estimation Tools (ONSET) on the One NASA Cost Engineering (ONCE) Database, is a web-based tool that provides a suite of estimation tools to support early lifecycle NASA flight software cost analysis. In addition to the traditional parametric flight software costing method COCOMO II, ASCoT contains a Bayesian linear regression to predict total flight software development cost as a function of total spacecraft cost, as well as four analogic methods: k-Nearest Neighbors (kNN) and Clustering models to predict Effort (in work-months) and total source lines of code (SLOC). These methods are designed to work primarily with system-level inputs such as mission type (orbiter, lander, etc.), mission destination (Earth, Inner Planetary, etc.), and the number of instruments and deployables. Nonlinear principal components analysis (NLPCA) is performed to find the principal features of the data composed of both categorical and numerical variables and is necessary prior to defining our analogic methods. Sensitivity analyses and in- and out-of-sample model performance results are presented for the Bayesian CER and the analogic models.

Johnson, James K.

ASCoT 3: Nonlinear Principal Components Analysis and Uncertainty Quantification in Early Concept Spacecraft Flight Software Cost Estimation

For mission planners and evaluators alike, value in cost models comes from a mean or median prediction, an understanding of the uncertainty on that prediction, and an understanding of model performance. Here we apply advanced statistical and machine learning methods to spacecraft flight software cost, effort, and SLOC estimation, and present the results in the latest version of the Analogy Software Cost Tool (ASCoT). We present in- and out-of-sample performance metrics for our models, each of which incorporate some amount of epistemic uncertainty. ASCoT, hosted on the One NASA Cost Engineering (ONCE) database via the Online NASA Space Estimation Tool (ONSET), was first showcased in 2016 as a number of analogy-based models and methods (kNN and Clustering) to support early project formulation. This ASCoT update improves upon the previous analogic methods by incorporating uncertainty in the data transformations. In particular, we use a Nonlinear Principal Components Analysis (NLPCA) to deal with ordinal data.

Robotic Spacecraft

Identification and Estimation of Flight Software Cost Risk Growth

The Jet Propulsion Laboratory (JPL) in Pasadena, California is a US Government Federally-Funded Research and Development Center that is run by the California Institute of Technology for the National Aeronautics and Space Administration (NASA) JPL's primary role is to conduct unmanned, robotic missions from Explorer to Voyager, to Mars Pathfinder.

Cost Modeling Risk Analysis

On a Formal Tool for Reasoning About Flight Software Cost Analysis

A report focuses on the development of flight software (FSW) cost estimates for 16 Discovery-class missions at JPL. The techniques and procedures developed enabled streamlining of the FSW analysis process, and provided instantaneous confirmation that the data and processes used for these estimates were consistent across all missions. The research provides direction as to how to build a prototype rule-based system for FSW cost estimation that would provide (1) FSW cost estimates, (2) explanation of how the estimates were arrived at, (3) mapping of costs, (4) mathematical trend charts with explanations of why the trends are what they are, (5) tables with ancillary FSW data of interest to analysts, (6) a facility for expert modification/enhancement of the rules, and (7) a basis for conceptually convenient expansion into more complex, useful, and general rule-based systems.

Spagnuolo, John N., Jr.

An approach to software cost estimation

A general procedure for software cost estimation in any environment is outlined. The basic concepts of work and effort estimation are explained, some popular resource estimation models are reviewed, and the accuracy of source estimates is discussed. A software cost prediction procedure based on the experiences of the Software Engineering Laboratory in the flight dynamics area and incorporating management expertise, cost models, and historical data is described. The sources of information and relevant parameters available during each phase of the software life cycle are identified. The methodology suggested incorporates these elements into a customized management tool for software cost prediction. Detailed guidelines for estimation in the flight dynamics environment developed using this methodology are presented.

Mcgarry, F.

The NASA Analogy Software Cost Model: A Web-Based Cost Analysis Tool

This paper provides an overview of the many new features and algorithm updates in the release of the NASA Analogy Software Cost Tool (ASCoT). ASCoT is a web-based tool that provides a suite of estimation tools to support early lifecycle NASA Flight Software analysis. ASCoT employs advanced statistical methods such as Cluster Analysis to provide an analogy based estimate of software delivered lines of code and development effort, a regression based Cost Estimating Relationships (CER) model that estimates cost (dollars), and a COCOMO II based estimate. The ASCoT algorithms are designed to primarily work with system level inputs such as mission type (earth orbiter vs. planetary vs. rover), the number of instruments, and total mission cost. This allows the user to supply a minimal number of mission-level parameters which are better understood early in the life-cycle, rather than a large number of complex inputs.

Hihn, Jairus

Cost and schedule estimation study report

This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

Condon, Steve

NASA Software Cost Estimation Model: An Analogy Based Estimation Model

The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

Hihn, Jairus

An Innovative Approach to Modeling VIPER Rover Software Life Cycle Cost

NASA’s “Volatiles Investigating Polar Exploration Rover” (VIPER) will be the first robotic mission to prospect for water ice near the south pole of the Moon in late 2023 on a 100-Earth-day mission. The information that the VIPER rover provides will help improve understanding of the composition, distribution, and accessibility of Lunar polar volatiles and will help determine how the Moon’s resources can support future human space exploration. VIPER, however, represents a radical departure from the way that NASA has traditionally developed planetary robotic missions. A key consequence of these differences is that estimating the cost of VIPER’s rover software is challenging and complex.For example, VIPER is being developed using management procedures typically applied to NASA research and technology projects, rather than space flight programs. In addition, key portions of the rover’s software are being designed as ground software to run on mission control computers (rather than on-board the rover as flight software as with prior planetary missions) taking advantage of continuous, interactive data communications between the Moon and Earth and higher performance computing available on the ground. Moreover, the rover’s software is being engineered using Agile software development practices and incorporates a significant amount of open-source, rather than following traditional (spiral, waterfall, etc.) development methods and in-house code. In this paper, we present an innovative process to estimate the life cycle cost of VIPER’s rover software. We first describe how we modeled the architecture and code counts for three software elements: Rover Flight Software (RFSW), Rover Ground Software (RGSW), and Rover Simulation Software (RSIM). We then discuss key challenges and unique aspects of our approach, such as the lack of Lunar rover analogies, the need to integrate and test large open source software, and the strategies developed to account for use of non-space flight management practices and the impact of the COVID-19 pandemic. We conclude with a summary of our results, including cumulative distribution, nearest neighbors and cluster analysis, as well as heuristics used to confirm the reasonableness of the cost estimate.

Utz, Hans

The impact of organizational structure on flight software cost risk

This paper summarizes the final results of the follow-up study updating the estimated software effort growth for those projects that were still under development and including an evaluation of the roles versus observed cost risk for the missions included in the original study which expands the data set to thirteen missions.

software cost

NASA Software Estimating Tool (N-SET)

The goals of this project are to: Develop an early lifecycle software cost estimation tool leveraging existing data and capabilities Collect additional software data from: a) Jet Propulsion Laboratory; b) Goddard Space Flight Center; and c) Marshall Space Flight Center. Analyze, normalize, evaluate, stratify, and validate data. Create a calibrated, validated, and documented tool initially using available data and subsequently using newly collected data.

cost estimating tools

Managers Handbook for Software Development

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

Agresti, W.

Predicting GPS Fidelity in Heavily Forested Areas

There is a compelling need to advance the safety of low altitude flight in forested areas. Signal scattering by trees can interfere with GNSS signal reception and can cause navigation loss within and adjacent to woodlands. An estimate of the signal loss vs. foliage depth is needed to quantify navigational degradation by trees at low altitudes. A previous report described a method which attempts to quantify satellite signal degradation caused by foliage by comparing carrier-to-noise ratio (C/N0) to foliage depth along geometric rays cast from the receiver location to the orbital position of GNSS satellites through a 3D matrix of terrain data. A characteristic curve of attenuation vs. foliage depth was found for both L1 and L2 signals at a single forested site. The current study replicates this result at three additional sites, describes refinements to the method, and explores inherent uncertainties that arise from radiofrequency fading and from receiver limitations for weak signals. For the sites surveyed, 60% and 90% of navigational signal is lost at 10m and 20m of foliage depth, respectively. Since this technique uses low-cost hardware and readily available data collection software, it can allow aviators to estimate GNSS position fidelity in flight ranges near trees.

GPS

Predicting GPS Fidelity in Heavily Forested Areas

There is a compelling need to advance the safety of low altitude flight in forested areas. Signal scattering by trees can interfere with GNSS signal reception and can cause navigation loss within and adjacent to woodlands. An estimate of the signal loss vs. foliage depth is needed to quantify navigational degradation by trees at low altitudes. A previous report described a method which attempts to quantify satellite signal degradation caused by foliage by comparing carrier-to-noise ratio (C/N0) to foliage depth along geometric rays cast from the receiver location to the orbital position of GNSS satellites through a 3D matrix of terrain data. A characteristic curve of attenuation vs. foliage depth was found for both L1 and L2 signals at a single forested site. The current study replicates this result at three additional sites, describes refinements to the method, and explores inherent uncertainties that arise from radiofrequency fading and from receiver limitations for weak signals. For the sites surveyed, 60% and 90% of navigational signal is lost at 10m and 20m of foliage depth, respectively. Since this technique uses low-cost hardware and readily available data collection software, it can allow aviators to estimate GNSS position fidelity in flight ranges near trees.

GPS