DOE OSTI2025
This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.