Search NASA⌕ Search

SEARCH · Search NASA

Results for “floating wind farm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Comparison of Coupled and Uncoupled Modeling of Floating Wind Farms with Shared Anchors

As design options for floating wind farms continue to be explored, shared (or multiline) anchors that secure mooring lines from multiple turbines remain a promising technology that can potentially reduce the number of anchors and overall mooring costs. This study evaluates two methods for analyzing the loads on shared anchors: one in which floating offshore wind turbines are simulated individually (using the software OpenFAST), and one in which an entire floating wind farm is simulated collectively (using the software FAST.Farm). A three-line shared anchor is evaluated for multiple loading scenarios in deep water, using the International Energy Agency 15 MW turbine on the VolturnUS-S semisubmersible platform. While the two methods produce broadly comparable results, the coupled wave loading on platforms within the farm results in wave force cancellations and amplifications that decrease multiline force directional ranges and increase multiline force extreme values (up to 7%) and standard deviations (up to 11%) for wave-driven load cases. The inclusion of wakes in FAST.Farm also reduces the net load on the shared anchor due to the velocity deficit, leading to larger differences between OpenFAST and FAST.Farm (up to 3% difference in mean loads) for load cases with operational turbines.

17 WIND ENERGY↗

Floating Wind Farm Layout Optimization Considering Moorings and Seabed Variations

This paper presents a method for optimizing the layout of floating wind farms that accounts for realistic seabed variations and the consequent adjustments to the mooring systems required for different turbine positions. The mooring lines of floating wind farms create large spatial constraints that are depth-dependent, since mooring designs must adapt to variations in seabed conditions over the array area. We develop a layout optimization methodology that addresses this, adjusting mooring system designs based on the local seabed characteristics as the layout changes and using steady-state models for the wake effects and mooring lines. The approach includes design algorithms that adjust the anchor positions and line length to achieve the desired mooring line profile for different water depths, and a layout optimization framework that implements spatial constraints between the turbines, mooring lines, and lease area boundaries. Demonstrating the method on several cases shows the effect of the seabed and spatial-constraint factors, as well as their interactions, on the optimal array layout. This demonstration paves the way for scaling up the method, using more powerful optimization algorithms to handle larger farm sizes and situations with more intensely varied seabed conditions.

17 WIND ENERGY↗

Integrated floating wind farm layout design and mooring system optimization to increase annual energy production

As we cluster wind turbines in wind farms to gain energy from sites with high wind speeds, wake losses occur within the wind farm. Wake loss is a term used to describe the lower energy production of a downwind turbine that is totally or partially in the wake of an upwind turbine. To decrease wake losses inside the wind farm, the wind farm’s layout is optimized. However, a variety of factors constrain the wind farm layout optimization, such as the size of the lease area relative to the number of turbines to be placed, or the shape of the lease area. Therefore, many wind farms end up with a regular grid layout, such as the Horns Rev 1 wind farm in the North Sea. The ability of a floating offshore wind turbine (FOWT) to change its position based on the wind direction and its mooring system design presents an opportunity to further decrease wake losses in floating wind farms. In this work, we integrate the design of the FOWT mooring systems with the floating wind farm layout design with the goal of increasing the farm’s annual energy production. We use the Horns Rev 1 wind farm as a case study to demonstrate our method. The results show that allowing the FOWT to relocate can decrease wake losses up to 18%. Moreover, the newly developed mooring systems are less stiff and therefore allow larger motion of the FOWT; hence, the material cost of the mooring system decreases by an estimated 17%.

17 WIND ENERGY↗

Coupled loads analysis of a novel shared-mooring floating wind farm

Shared mooring lines are a method to reduce the stationkeeping cost of floating offshore wind farms; however, their impacts on floating array dynamics are not yet well understood. Here this article presents advancements to floating wind farm simulation capabilities that allow the dynamic modeling of shared-mooring floating wind arrays - specifically, platform coupling through shared lines and proper phasing of wave loads across the array. These capabilities are demonstrated on a 10-turbine shared-mooring array featuring two staggered rows of wind turbines. A baseline array design with individually moored turbines is used as a basis for comparison. Coupled analysis using FAST.Farm shows that the shared-mooring design has smaller fluctuations in surge when compared to the baseline design. The mean and maximum platform offsets are highest in normal operating conditions, but the maximum mooring line tensions are highest in 50-year storm conditions. Power spectral density analysis of platform surge and sway motions shows that the shared mooring configuration does not introduce any significant inter-platform resonances. The tower-base bending moment statistics and the line tension damage equivalent loads indicate no consequential differences in turbine loading or mooring fatigue life. Anchor load analysis shows that the total required anchor capacity for the shared-mooring array is decreased by approximately 25% when shared anchors are used. Dynamic simulations of the shared mooring system under line failures show that remaining line tensions stay within bounds and that offsets are significantly smaller when compared to the baseline design. Overall, the results show that shared moorings do not introduce any dynamic response concerns in this floating wind array design.

17 WIND ENERGY↗

Assessing the impacts of wakes on floating wind farms with shared anchors

This paper examines wake effects for floating wind farms with shared anchors. Three 20-turbine farms are examined: a grid-formation baseline with no shared anchors, a farm based on 3-line anchors, and a farm based on 6-line anchors, governed by a wind turbine spacing of 8 rotor diameters. The IEA 15 MW reference turbine on the UMaine semisubmersible platform was used with a taut mooring system in deep- water depths representative of U.S. west coast lease areas. A steady-state wake model showed that, when evaluating a sweep of wind headings, the baseline design had the lowest wake losses, with a value of 11.7 %, followed by the 6-line at 12.9% and the 3-line at 13.8%. Dynamic simulations were run in FAST.Farm to analyse the effects of wakes on mean anchor loads for wind headings that showed significant wake losses. The baseline farm showed the largest anchor load reductions due to wake effects (up to 16%), followed by the 3-line farm (up to 8%), and the 6-line farm, which showed relatively consistent load magnitudes on the 6-line anchors across all headings.

17 WIND ENERGY↗

Levelized Cost of Energy Comparison of Floating Wind Farms With and Without Shared Anchors

As part of the Innovative Deep-Water Mooring Systems for Floating Wind Farms (DeepFarm) R&D project, led by Principle Power Inc., the National Renewable Energy Laboratory (NREL) performed an LCOE analysis to compare the changes in LCOE between floating wind farms with individual anchors versus shared anchors. This report presents a comparative analysis of the LCOE of two different wind farms with different mooring systems: one with taut mooring lines each connected to individual suction pile anchors, and one with taut mooring lines connected to shared anchors. A brief description of the methodology employed to conduct the LCOE comparison is given, including the underlying assumptions. Then, results are presented with a compilation of key findings.

16 TIDAL AND WAVE POWER↗

Innovative Deep-Water Mooring Systems for Floating Wind Farms (DeepFarm): Cooperative Research and Development (Final Report)

The DeepFarm project, led by Principle Power Inc (PPI), focused on design, modeling and development of innovative mooring and anchoring systems for semi-submersible floating wind turbine platforms in a deep water, commercial-size wind farm. It explored the possibility of sharing anchors amongst the floating platforms within the farm, and considers site conditions representative of the West Coast and Hawaii, with a variety of water depths, as case studies to ensure that the sensitivity to water depth and park size are well understood. NREL and PPI worked together to develop and apply NREL's computational tools for modeling floating wind farm dynamics and costs.

17 WIND ENERGY↗

Dynamic performance of a passively self-adjusting floating wind farm layout to increase the annual energy production

One of the main differences between floating offshore wind turbines (FOWTs) and fixed-bottom turbines is the angular and translational motions of FOWTs. When it comes to planning a floating wind farm (FWF), the translational motions introduce an additional layer of complexity to the FWF layout. The ability of a FOWT to relocate its position represents an opportunity to mitigate wake losses within an FWF. By passively relocating downwind turbines out of the wake generated by upwind turbines, we can reduce wake-induced energy losses and enhance overall energy production. The translational movements of FOWTs are governed by the mooring system attached to it. The way a FOWT relocates its position changes if the design of the mooring system attached to it changes. Additionally, the translational motion of a FOWT attached to a given mooring system is different for different wind directions. Hence, we can tailor a mooring system design for a FOWT to passively control its motions according to the wind direction. In this work, we present a new self-adjusting FWF layout design and assess its performance using both static and dynamic methods. The results show that relocating the FOWTs in an FWF can increase the energy production by 3 % using a steady-state wake model and 1.4 % using a dynamic wake model at a wind speed of 10 m s -1 . Moreover, we compare the fatigue and ultimate loads of the mooring systems of the self-adjusting FWF layout design to the mooring systems in a current state-of-the-art FWF baseline design. The comparison shows that with smaller mooring system diameters, the self-adjusting FWF design has similar fatigue damage compared to the baseline design with bigger mooring system diameters at rated wind speed. Finally, the ultimate loads on the mooring systems of the self-adjusting FWF design are lower than those on the mooring systems of the baseline design.

17 WIND ENERGY↗

Design and analysis of a ten-turbine floating wind farm with shared mooring lines

This paper discusses the development and analysis of a novel design for a 10-turbine floating wind farm with shared mooring lines. Shared mooring lines tether adjacent floating platforms together, reducing the number of anchors required but increasing system complexity. We present a systematic, multistage design process for shared mooring systems, involving linearized analysis of array layout options, quasi-static mooring line optimization, and design refinement based on coupled dynamic loads analysis. The design developed from this process is thought to represent one of the most advantageous shared-mooring configurations for this scale of floating wind array. It features perpendicular anchor line pairs and allows shared, multiline anchors, making it an example of a shared-mooring-and-anchor array. Comparing the performance and cost characteristics of the shared-mooring design with more conventional three-line individual mooring systems shows equivalent dynamic response characteristics and stationkeeping system cost savings of 25% when using shared mooring lines and shared anchors. The design is also advantageous in the case of a mooring line failure, with offsets and redundancy characteristics similar to four-line individual mooring systems.

17 WIND ENERGY↗

Coupled modeling of wake steering and platform offsets for floating wind arrays

Wake effects are a key challenge in the design and analysis of wind farms. For floating wind farms, the platforms offset under the aerodynamic loading of the turbine and are constrained by mooring systems that can vary significantly in allowable offsets. When considering wake steering, the crosswind offset of the turbine can counteract the lateral deflection of the wake. This work presents a tool to efficiently model the coupled impacts of wake steering and platform offsets for floating wind farms. The tool relies on the frequency-domain wind farm model RAFT and the steady-state wake model FLORIS. A verification with FAST.Farm is presented, then the tool is applied to a simple two-turbine case study. A range of mooring systems with increasing platform offsets and varied yaw misalignment angles are considered while comparing the impact on turbine power. Additional sensitivities to turbine spacing and mooring system orientation are explored. The results show that there is a least-optimal watch circle width for downwind turbine power production that varies with yaw misalignment angle and turbine spacing. Additionally, the turbine offsets under yaw-misaligned conditions vary significantly depending on mooring system orientation relative to the rotor plane, which in turn impacts the optimal misalignment angle. These results highlight the importance of including floating platform offsets and mooring systems in the evaluation of wake steering strategies for floating wind arrays.

17 WIND ENERGY↗

Cost‐benefit assessment framework for robotics‐driven inspection of floating offshore wind farms

Abstract Operations and maintenance (O&M) of floating offshore wind farms (FOWFs) poses various challenges in terms of greater distances from the shore, harsher weather conditions, and restricted mobility options. Robotic systems have the potential to automate some parts of the O&M leading to continuous feature‐rich data acquisition, operational efficiency, along with health and safety improvements. There remains a gap in assessing the techno‐economic feasibility of robotics in the FOWF sector. This paper investigates the costs and benefits of incorporating robotics into the O&M of a FOWF. A bottom‐up cost model is used to estimate the costs for a proposed multi‐robot platform (MRP). The MRP houses unmanned aerial vehicle (UAV) and remotely operated vehicle (ROV) to conduct the inspection of specific FOWF components. Emphasis is laid on the most conducive O&M activities for robotization and the associated technical and cost aspects. The simulation is conducted in Windfarm Operations and Maintenance cost‐Benefit Analysis Tool (WOMBAT), where the metrics of incurred operational expenditure (OPEX) and the inspection time are calculated and compared with those of a baseline case consisting of crew transfer vessels, rope‐access technicians, and divers. Results show that the MRP can reduce the inspection time incurred, but this reduction has dependency on the efficacy of the robotic system and the associated parameterization e.g., cost elements and the inspection rates. Conversely, the increased MRP day rate results in a higher annualized OPEX. Residual risk is calculated to assess the net benefit of incorporating the MRP. Furthermore, sensitivity analysis is conducted to find the key parameters influencing the OPEX and the inspection time variation. A key output of this work is a robust and realistic framework which can be used for the cost‐benefit assessment of future MRP systems for specific FOWF activities.

17 WIND ENERGY↗

The IEA Wind Task 49 Reference Floating Wind Array Design Basis

International Energy Agency Wind Technology Collaboration Programme (IEA Wind) Task 49 on Integrated Design of Floating Wind Arrays is an international collaboration aiming to advance the development of large-scale floating wind farms by providing open-access resources to the research and development and planning communities. The work of Task 49 focuses on array-level challenges related to the colocation of many floating wind turbines; their layouts, mooring systems, and cabling systems; failure risks; logistical considerations; marine spatial planning needs; and future research needs and innovation directions. This report provides a general design basis for the development of reference floating wind farm designs. These reference array designs will extend the scope of existing reference floating wind turbine designs to facilitate research on array-level floating wind technology challenges and innovations. The design basis promotes coordination and consistency in developing the reference array designs.

17 WIND ENERGY↗

Capacity Density Considerations for Floating Offshore Wind Farms in Ultradeep Waters

Capacity density describes the concentration of wind energy development in an area and is often specified in terms of megawatts-per-square-kilometer (MW/km2). Understanding capacity density trends in wind energy projects helps to inform both energy system and spatial planning efforts. Borrman et al. (2018) and Mulas Hernando et al. (2023) analyze capacity density trends for fixed-bottom offshore wind farms in Europe and the United States, respectively, and Cooperman et al. (2022) explores how floating offshore wind mooring technology choices may impact wind plant layout through setbacks from lease area boundaries in waters up to 1,300 m deep. Technical challenges facing floating offshore wind development in ultradeep waters (beyond 1,300 m) could impact achievable capacity densities, with potential implications to marine spatial planning and project economics. When compared to fixed-bottom commercial-scale wind farms, mooring system footprints from floating offshore wind systems can constrain capacity density in some circumstances. In this study, we conduct an initial investigation of how taut mooring configurations may constrain floating offshore wind turbine placement and estimate capacity density for representative floating wind plants in generic lease areas. In addition, we explore floating wind plant capacity density drivers in ultradeep waters by characterizing area utilization for a range of lease area characteristics. This analysis highlights the primary challenges that floating offshore wind systems may encounter in achieving capacity densities comparable to commercial-scale fixed-bottom projects at ultradeep water depths, from a technical standpoint.

capacity density↗

Design, Optimization, and Control of Floating Offshore Wind Farms for Optimal Energy Production (Final report)

The uncertainty and irregularity of ocean waves and the ocean environment is a major factor in the development of commercial scale floating wind turbines as the operation of floating structures in such an environment can lead to irregular and unpredictable loading, fatigue, and ultimately a reduction in the operational life of the turbine system which affects energy production over the lifetime of the turbine. Control solutions that can limit float motions and mitigate stressful events on the structure become essential for extending lifetime and limiting the operational uncertainty of a floating wind turbine. Digital twins are computational replicas of physical systems that operate in parallel with the operation of the physical system. Given advanced knowledge of a systems input, digital twins have the ability to predict the behavior of a system in advance, which can be valuable in the control of that system. In this project, we developed and assessed potential digital twin models developed in house and openly available (OpenFast) for use in the real time control of the six degree of freedom response motions of a floating wind turbine in ocean waves. Coupling these models with near-field real time irregular sea surface (wve) measurement/sensings and prediction models, we used the digital twin to predict how the floating turbine will respond to the incoming waves. Applying this information to a motion control system of the float, one can limit and control float motions to prevent undesirable loading events/large angular motions, thus increasing system life and ultimately contributing to optimizing energy production. Due to the computational intensity of operating a digital twin in real time, we investigated the use of artificial intelligence techniques to speed-up the processes of the digital twin, as well as the wave reconstruction/prediction models. Model tank testing at the University of Rhode Island and University of Maine both validated and demonstrated the developed techniques on simple float geometries and a scale model of the NREL 15 MW reference turbine.

17 WIND ENERGY↗

American-Made Challenges: FLoating Offshore Wind ReadINess (FLOWIN) Prize

The goal of this prize is to establish a pathway to cost-effective domestic manufacture and deployment of gigawatt-scale floating wind farms in U.S. waters. Toward realization of that goal, the prize will: (1) incentivize and support further development of technically and economically viable floating wind platform structures that can support 12-MW-rated or larger wind turbines in water depths over 40 meters. (2) incentivize the creation of a supply chain that will enable domestic on-site manufacturing of floating offshore wind farm components utilizing a skilled and trained workforce. (3) promote awareness of the importance and principles of inclusion and environmental justice.

American-Made Challenges↗

Frequency-domain modeling of floating wind arrays with shared mooring lines

A frequency-domain model for floating wind turbine dynamics has been extended to model floating wind farms with couplings from shared mooring systems. The model, called RAFT, could previously calculate the mean offsets and wave-induced response spectra for single floating wind turbines. Now, the model supports multiple floating wind turbines, each with their own properties and responses, along with mooring lines that run directly between floating wind turbines in the array, meaning that shared mooring lines or fully suspended dynamic power cables can be included. This capability is achieved by setting up an array-level solution of the system mean offsets and assembling the full system matrices for solving the dynamic response. The quasi-static mooring model MoorPy is used to linearize the mooring system properties. To compute the floating wind turbine relative motions, phase offsets are applied to each turbine's response as a function of wave frequency based on the wavelength and relative positions in the array. These differential motions are then applied to mooring system tension Jacobians to compute the tension loads in the shared mooring lines. Overall, the capability provides a frequency-domain analog to the modeling capabilities of the floating support structure in FAST.Farm. Mean offsets and power spectral density plots of responses are compared between RAFT and FAST.Farm to verify the implementation. The results indicate good agreement within the expectations of a frequency-domain modeling approach and suggest correct implementation of the shared mooring aspects. Additionally, a unique comb-like frequency response in the shared mooring line tensions has been observed. This phenomenon has a clear physical basis and may be an important design consideration for future shared mooring systems.

17 WIND ENERGY↗