Search NASA⌕ Search

SEARCH · Search NASA

Results for “floating wind technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A systems engineering vision for floating offshore wind cost optimization

The U.S. offshore wind resource potential is immense, and often in close proximity to densely-populated coastal load centers. In many U.S. coastal areas, water depths favor the deployment of floating over fixed-bottom offshore wind technology. Floating offshore wind plants have the potential to be cost-competitive with fixed-bottom installations, but because the technology has not yet been deployed at commercial scale, it is not clear when and with what configurations this potential cost parity can be achieved. This article first reviews the state of floating offshore wind technology and deployments to identify key gaps that must be addressed to bring down the overall cost of energy produced. The article then puts forth a long-term vision for a research program and design methodology that may be able to push floating wind plants toward a lower levelized cost of energy than fixed-bottom offshore wind. The method involves a fully integrated systems-engineering and techno-economic design approach to capture the complex interactions between the physics, manufacturing, installation, and operation of floating wind turbines to achieve transformational cost reductions. The approach also envisions multifidelity and uncertainty management strategies to examine the most robust and viable concepts in the design trade-space. To better focus the computational resources, engineering lessons learned from existing offshore wind systems and concept studies are used to develop a set of criteria that can be applied to prefilter candidate technology building blocks that have the greatest cost reduction potential.

17 WIND ENERGY↗

The IEA Wind Task 49 Reference Floating Wind Array Design Basis

International Energy Agency Wind Technology Collaboration Programme (IEA Wind) Task 49 on Integrated Design of Floating Wind Arrays is an international collaboration aiming to advance the development of large-scale floating wind farms by providing open-access resources to the research and development and planning communities. The work of Task 49 focuses on array-level challenges related to the colocation of many floating wind turbines; their layouts, mooring systems, and cabling systems; failure risks; logistical considerations; marine spatial planning needs; and future research needs and innovation directions. This report provides a general design basis for the development of reference floating wind farm designs. These reference array designs will extend the scope of existing reference floating wind turbine designs to facilitate research on array-level floating wind technology challenges and innovations. The design basis promotes coordination and consistency in developing the reference array designs.

17 WIND ENERGY↗

Optimization of a Lightweight Floating Offshore Wind Turbine with Water Ballast Motion Mitigation Technology

Floating offshore wind turbines are a promising technology for addressing energy needs by utilizing wind resources offshore. The current state of the art is based on heavy, expensive platforms to survive the ocean environment. Typical design techniques do not involve optimization because of the computationally expensive time domain solvers used to model motions and loads in the ocean environment. However, this design uses an efficient frequency domain solver with a genetic algorithm to rapidly optimize the design of a novel floating wind turbine concept. The concept utilizes a liquid ballast mass to mitigate motions on a lightweight post-tensioned concrete platform. The simple cruciform-shaped design of the platform made of post-tensioned concrete is less expensive than steel, reducing the raw material and manufacturing cost. The use of ballast water to behave as a tuned mass damper allows a smaller platform to achieve the same motions as a much larger platform, thus reducing the mass and cost. The optimization techniques applied with these design innovations resulted in a design with a levelized cost of energy of USD 0.0753/kWh, roughly half the cost of the current state of the art.

Ramsay, William↗

Oregon Offshore Wind Site Feasibility and Cost Study

The focus of this presentation is to: Reflect current floating wind technology trends and industry market data in cost models; Provide cost analysis in support of Oregon state energy planners considering floating offshore wind's potential contribution to future state energy supplies.

17 WIND ENERGY↗

Reference floating wind array designs for three representative regions

This work presents the systematic development of three open-source reference floating wind array designs. The designs are tailored to representative site conditions for three regions of the United States: Humboldt Bay off the coast of California, the Gulf of Maine, and the Gulf of America. We adopted existing reference designs for the individual 15 MW turbines, semisubmersible floating platforms, substations, mooring systems, and power cables – integrating and adapting them as needed for each location. We adapted existing dynamic cable designs to use larger conductor sizes to meet the arrays' power transmission requirements, and we set up redundant mooring systems for each substation. The layout of each array is a uniform-grid design optimized to approximately minimize the levelized cost of energy (LCOE) within a square lease area while satisfying spatial constraints. These constraints ensure adequate clearances between adjacent turbines and between underwater components during the layout optimization to prevent clashing and ensure that all components reside within the lease boundaries. Substations are included to allow accounting for intra-array cable costs. They are placed within the uniform grid to maintain the navigability of the arrays. For each feasible layout considered, annual energy production and cable routing costs are calculated and updated in the LCOE objective function. After the optimization, we refined the cable routing with a mix of algorithmic and manual methods to ensure that the cables avoid mooring system components and approach the substation with adequate clearances. We confirmed the suitability of each reference array's layout by comparing the wake losses at each wind heading angle to the wind rose, observing that the optimized layouts largely avoid wake losses in the predominant wind directions. These reference arrays provide open-source baseline designs to enable future research and innovation of floating wind technology at the array scale.

17 WIND ENERGY↗

Gulf of Mexico Offshore Wind Transmission - Literature Review and Gaps Analysis: Environmental Considerations, Community Readiness, and Infrastructure

The ability to effectively and efficiently connect offshore wind energy resources to end users in the Gulf of Mexico, requires coordinated transmission planning to ensure that electric transmission facilities can adequately support future offshore development. The Gulf of Mexico has substantial wind resources in both shallow shelf waters and deeper waters off the shelf where fixed bottom and floating wind technologies would be most appropriate. Most interest in offshore wind development to date has been in the central and western portions of the Gulf of Mexico (Louisiana and Texas) in federal and state waters. As a companion study to other federal activities in the offshore wind transmission space, including the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis, the Atlantic Offshore Wind Transmission Study, the West Coast Offshore Wind Transmission Literature Review and Gaps Analysis, the West Coast Offshore Wind Transmission Study, and the Advancing Offshore Wind Energy in the United States: U. S. Department of Energy Strategic Contributions Toward 30 Gigawatts and Beyond Report, this literature review and gaps analysis for offshore wind transmission in the Gulf of Mexico builds off previous literature reviews and supports the role of federal leadership to facilitate offshore wind energy. The overarching goal of this document is to identify gaps and lay the groundwork to inform coordinated transmission planning, ocean co-use, existing energy infrastructure, and siting associated with offshore wind energy development in the Gulf of Mexico. There are unique regional considerations for offshore wind transmission, which are summarized herein based on a review and assessment of publicly available information.

08 HYDROGEN↗

Investigation of the Challenges of Offshore Wind in Ultradeep Water

Floating offshore wind technology allows offshore wind energy systems to be deployed in water depths that are inaccessible with conventional fixed bottom technology. Several floating offshore wind energy pilot projects have demonstrated reliable operation of the technology in water depths between 200 m and 300 m. Building on that experience, commercial-scale projects are being developed in areas out to 1,300 m depths. In some regions there is substantial resource potential for wind energy generation in even deeper waters, however, increasing depths may introduce new challenges for installation, maintenance, and repair. In this report, we consider technical, environmental, and economic challenges for floating offshore wind energy in ultradeep water, defined here as depths between 1,300 m and 3,000 m.

17 WIND ENERGY↗

DigiFloat (Final Scientific/Technical Report)

This purpose of this report is to document the development of a floating offshore wind platform Digital Twin for the ARPA-E-funded DigiFloat project led by Principle Power, Inc. In Offshore Wind, Digital Twins are aimed at reducing farm-wide OPEX expenditures through reduced-basis inspection, assessing life extension methods, and obtaining better knowledge of the deployed assets for future product optimization. There is a high level of technical effectiveness and economic feasibility for the technology investigated, as it uses commercial off-the-shelf sensors, and a commercial software package. A substantial portion of the project goals are improvement of existing technology for use with floating wind turbines, and new application of an existing technology to a rapidly-growing sector. A few sensors applied to a small number of units bring benefit to the entire fleet of floating wind turbines in a given farm, and in other future wind farms. The benefits to the public of this project are further optimization and maturation of floating wind technology, to bring it to the U.S. market faster and cheaper.

17 WIND ENERGY↗

Floating Offshore Wind US Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

NREL assessed the supply chain and workforce considerations for the OCG-Wind floater technology, a floating semi-submersible offshore wind substructure, as well sharing vessel needs to inform their installation strategy. This technical assistance was in support of the FLoating Offshore Wind ReadINess (FLOWIN) Prize Phase 2 submission. NREL provided an assessment of domestic supplier capabilities for the main components of their floating offshore wind platform design and analyzed US regional and national supply chain constraints and gaps. Thirteen interviews with companies including steel distributors, forges, foundries, ports, large component fabricators, subcomponent fabricators, and secondary suppliers provided key insights such as 1) assembly ports are the key infrastructure barrier standing in the way of unlocking the domestic assembly and component fabrication for steel-based FOW platforms, 2) domestic steel producers can supply the types and quantities of steel necessary for FOW platforms, and 3) coordination between stakeholders will be a vital part of successfully developing the supply chain and infrastructure needed to domestically produce FOW platforms. In the workforce assessment, NREL documented a step-by-step approach to conduct a place-based assessment of the foundational workforce consideration for recruiting, upskilling, and retaining a workforce, such as supportive local and state policy, nearby education and training programs, and existing relevant industry. This approach was applied to Tacoma, Washington. Tacoma was indicated to have the potential be a successful location for fabrication and assembly of floating offshore wind energy in terms of workforce development. To share data on vessel requirements to install the OCG-Wind floater, NREL compiled resources that help answer the questions related to anchor handling tug vessels, shared a database of cable laying vessels, and answered questions on complying with the Jones Act.

17 WIND ENERGY↗

The Cost of Floating Offshore Wind Energy in California Between 2019 and 2032

California’s energy planning is centered around meeting the emissions reduction and renewable energy requirements of Senate Bill 350 by 2030. However, state power system planning is expected to eventually address California’s requirement to achieve 100% of total retail electricity sales from renewable energy and zero-carbon resources by 2045, as mandated by Senate Bill 100. To comply with these directives, California needs to investigate the further development of energy efficiency, storage, and a diverse range of renewable energy, zero-carbon emission, and transmission resources, including offshore wind. Wind resources off the coast of California have the potential to generate a significant portion of the state’s electric energy as it moves toward a zero-carbon economy and can help diversify its energy mix. Floating offshore wind technology, which is suitable for the deep waters along the California coast, is currently in a precommercial phase, with approximately 84 megawatts (MW) installed worldwide at the end of 2019. Globally there are over 7,000 MW in planning and permitting phases of development, with the first commercial-scale projects expected to be operational in 2024. This study provides site-specific cost and performance data for floating offshore wind to inform California’s long-term energy planning. The identification of new resources to meet California’s policy goals at least cost is part of the Integrated Resource Planning (IRP) process, which is coordinated by the California Public Utilities Commission (CPUC). In 2019–2020 IRP modeling, offshore wind was included for the first time as a candidate resource in some sensitivity cases (CPUC 2019). The data and information presented in this report can be used to update offshore wind inputs in future IRP cycles. The authors conducted a geospatial cost analysis over portions of the offshore wind resource area of California. The analyzed spatial domain includes sites with a mean wind speed of at least 7 meters per second and water depths between 40 meters (m) and 1,300 m. Costs and energy production vary across this analysis domain. We calculated these parameters on a grid layout with over 750 sites, with each site representing a 1,000-MW commercial offshore wind power plant. Levelized cost of energy (LCOE) was calculated at each site over the analysis domain. The resulting variation in LCOE across the analysis domain is illustrated through heat maps in this report. Five study areas were selected within the analysis domain where more detailed cost analysis was conducted and cost parameters, such as annual energy production, capital cost expenditures (CapEx), operational cost expenditures (OpEx), and net capacity factors are reported. These five study areas include Morro Bay, Diablo Canyon, Humboldt, Cape Mendocino and Del Norte.

17 WIND ENERGY↗

Focal Fisheries Requirements for Floating Offshore Wind Co-Design in the Gulf of Maine and the Mid-Atlantic Bight

Floating offshore wind is an emerging renewable energy technology in U.S. waters and globally. Floating offshore wind technology is more complex than fixed-bottom installations, requiring platforms, moorings, and power cables that take up a larger footprint, both in the water column and along the seafloor. This complexity affects opportunities for compatibility between floating offshore wind and other ocean users, particularly fishermen, whose fishing gear also takes up space in the water column and along the seafloor. This report describes the results of semi-structured interviews with key fishing informants from two focal fisheries: (1) Gulf of Maine lobster (fixed gear) and (2) Mid-Atlantic Bight pelagic longline and recreational tuna (mobile gear). A total of six fishermen were interviewed: four from the Gulf of Maine and two from the Mid-Atlantic Bight. The interviews were designed to elicit information and opinions on the co-design of marine space for particular fishing gear and floating offshore wind infrastructure. Here, we provide an overview of participant fishing experience, the spatial requirements of specific gear types, self-reported comfort levels in different fishing scenarios, and concerns about accessing and operating within floating offshore wind arrays. This summary of fishermen s concerns around floating offshore wind infrastructure can guide future co-existence conversations.

17 WIND ENERGY↗

Environmental Effects Assessment for Proposed Offshore Wind Farm off the Coast of Grays Harbor, Washington

Grays Harbor Wind LLC (GHW) is proposing to develop a floating offshore wind farm offshore of west Grays Harbor County, Washington (Grays Harbor). The proposed GHW Offshore Wind Project (Project) would entail construction, installation and operation of a 1,000-megawatt (MW) offshore wind farm consisting of approximately 75 floating units, each containing a floating foundation and wind turbine generator (WTG). The Project location is approximately 25 miles (21.7 nautical miles [nmi]) offshore west of Grays Harbor, at waters depths of 360 to 700 feet. The Pacific Northwest National Laboratory (PNNL) was contracted by Herrera Environmental Consultants, Inc. on behalf of GHW to carry out this preliminary scoping study to evaluate baseline conditions and potential effects on fish and marine mammals from development and operation of a floating offshore wind farm installed within a designated area off the coast of Washington1. Floating offshore wind units installed in an ocean environment as part of the Project would interact with marine wildlife. This Study report provides an initial data aggregation and analysis, using publicly available data, of the Project effects, both negative and positive, on the marine environment. The scope of this assessment is limited by the fact that the Project development is presently at the conceptual level. Data on marine organisms were aggregated and evaluated; however seabirds were evaluated by Herrera Environmental Consulting and, along with bats, were not included in the scope of this study. Significant additional work is necessary to characterize ocean, seafloor, and environmental conditions; select appropriate floating offshore wind technologies; identify construction methods and locations; and assess facility locations, including electrical interconnection. Data aggregation and analysis of seabirds and bats is also needed. Evaluation of the full range of potential environmental effects would be conducted following an award of a lease from the Bureau of Ocean Energy Management (BOEM) as part of the leasing, National Environmental Policy Act (NEPA)/State Environmental Policy Act (SEPA) environmental review and permitting processes. While this initial data aggregation and analysis uses best available public scientific information and current assumptions about the Project configuration, the effects discussed herein are based on the status of review to-date and may change as Project-specific details are developed.

17 WIND ENERGY↗

Five grand challenges of offshore wind financing in the United States

Offshore wind energy has the potential to play a critical role in fostering a renewable energy transformation in the United States. This owes to its massive technical potential, strategic location near densely populated coastlines, and - relative to onshore wind and solar - high capacity factors and consistent production. The Biden Administration's target to build 30 GW of offshore wind capacity by 2030 (from 0.04 GW today) requires the creation and swift development of a new industry that interlinks the wind and power industries with the maritime sector. Critical to its success is financing. While financial capital is abundant, deploying it for offshore wind faces major challenges. We identify and describe five grand challenges affecting offshore wind finance in the U.S. Failing to address these challenges may put deployment targets at risk. The challenges include (1) Early years financing: navigating the complexities, timing mismatches, and high costs of projects in the development phase; (2) Policy support for project financial solvency: addressing the uncertainty and systematic transfers of tax credits away from offshore wind, characteristic of the U.S. Investment Tax Credit; (3) Workforce development: building a skilled workforce for an emerging market; (4) Transmission and integration barriers: upgrading the power grid to reliably support large scale offshore wind integration; and (5) Floating wind development: financing the development and scale-up of floating offshore wind technologies. The second challenge has already been solved to a large extent by the Inflation Reduction Act.

17 WIND ENERGY↗

MoorDyn V2: New Capabilities in Mooring System Components and Load Cases

MoorDyn, an open-source mooring dynamics model, is being expanded with capabilities for additional mooring system features and load cases. As floating wind turbine technology matures, mooring systems are becoming more sophisticated and more complex scenarios need to be considered in the design process. Mooring systems may have synthetic line materials, ballast/buoyancy bodies along the lines, or interconnections between platforms. Failure modes may involve multiple cascading line failures that depend on mooring system dynamics. Features recently added to MoorDyn aim to address these emerging needs. MoorDyn’s linear elasticity model has been supplemented to support user-defined stress-strain curves, which can be adjusted to represent synthetic mooring materials. Rigid six-degree-of-freedom bodies in the mooring system can now be modeled using two new model objects. “Rod” objects provide an option for rigid cylindrical bodies. They use the existing Morison equation-based hydrodynamics model and can be connected to mooring lines at either end. “Body” objects provide a generic six-degree-of-freedom rigid-body representation based on a lumped-parameter model of translational and rotational properties. Rod objects can be added to Body objects and mooring lines can be attached at any location, allowing a wide variety of submerged structures to be integrated into the mooring system. Lastly, a means of dynamically simulating mooring line failures has been implemented. These new features, currently in the C++ version of MoorDyn, are described and then demonstrated on a two-turbine shared-mooring array. A qualitative view of the results suggests the new features are functioning as expected.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

MoorDyn V2: New Capabilities in Mooring System Components and Load Cases: Preprint

MoorDyn, an open-source mooring dynamics model, is being expanded with capabilities for additional mooring system features and load cases. As floating wind turbine technology matures, mooring systems are becoming more sophisticated and more complex scenarios need to be considered in the design process. Mooring systems may have synthetic line materials, ballast/buoyancy bodies along the lines, or interconnections between platforms. Failure modes may involve multiple cascading line failures that depend on mooring system dynamics. Features recently added to MoorDyn aim to address these emerging needs. MoorDyn’s linear elasticity model has been supplemented to support user-defined stress-strain curves, which can be adjusted to represent synthetic mooring materials. Rigid six-degree-of-freedom bodies in the mooring system can now be modeled using two new model objects. “Rod” objects provide an option for rigid cylindrical bodies. They use the existing Morison equation-based hydrodynamics model and can be connected to mooring lines at either end. “Body” objects provide a generic six-degree-of-freedom rigid-body representation based on a lumped-parameter model of translational and rotational properties. Rod objects can be added to Body objects and mooring lines can be attached at any location, allowing a wide variety of submerged structures to be integrated into the mooring system. Lastly, a means of dynamically simulating mooring line failures has been implemented. These new features, currently in the C++ version of MoorDyn, are described and then demonstrated on a two-turbine shared-mooring array. A qualitative view of the results suggests the new features are functioning as expected.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Distributed Acoustic Sensing for Whale Vocalization Monitoring: A Vertical Deployment Field Test

Abstract There is growing interest in floating offshore wind turbine (FOWT) technology, where turbines are installed on floating structures anchored to the seabed, allowing wind energy development in areas unsuitable for traditional fixed-platform turbines. Responsible development requires monitoring the impact of FOWTs on marine wildlife, such as whales, throughout the operational lifecycle of the turbines. Distributed acoustic sensing (DAS)—a technology that transforms fiber-optic cables into vibration sensor arrays—has been demonstrated for acoustic monitoring of whales using seafloor telecommunications cables. However, no studies have yet evaluated DAS performance in dynamic, engineered environments, such as floating platforms or moving vessels with complex, dynamic strain loads, despite their relevance to FOWT settings. This study addresses that gap by deploying DAS aboard a boat in Monterey Bay, California, where a fiber-optic cable was lowered using a weighted and suspended mooring line, enabling vertical deployment. Humpback whale vocalizations were captured and identified in the DAS data, noise sources were identified, and DAS data were compared to audio captured by a standalone hydrophone attached to the mooring line and a nearby hydrophone on a cabled observatory. This study is unique in: (1) deploying DAS in a vertical deployment mode, where noise from turbulence, cable vibrations, and other sources posed additional challenges compared to seafloor DAS applications; (2) demonstrating DAS in a dynamic, nonstationary setup, which is uncommon for DAS interrogators typically used in more stable environments; and (3) leveraging looped sections of the cable to reduce the noise floor and mitigate the effects of excessive cable vibrations and strain. This research demonstrates DAS’s ability to capture whale vocalizations in challenging environments, highlighting its potential to enhance underwater acoustic monitoring, particularly in the context of renewable energy development in offshore environments.

Saw, Jaewon↗

Modeling the TetraSpar Floating Offshore Wind Turbine Foundation as a Flexible Structure in OrcaFlex and OpenFAST

Floating offshore wind turbine technology has seen an increasing and continuous development in recent years. When designing the floating platforms, both experimental and numerical tools are applied, with the latter often using time-domain solvers based on hydro-load estimation from a Morison approach or a boundary element method. Commercial software packages such as OrcaFlex, or open-source software such as OpenFAST, are often used where the floater is modeled as a rigid six degree-of-freedom body with loads applied at the center of gravity. However, for final structural design, it is necessary to have information on the distribution of loads over the entire body and to know local internal loads in each component. This paper uses the TetraSpar floating offshore wind turbine design as a case study to examine new modeling approaches in OrcaFlex and OpenFAST that provide this information. The study proves the possibility of applying the approach and the extraction of internal loads, while also presenting an initial code-to-code verification between OrcaFlex and OpenFAST. As can be expected, comparing the flexible model to a rigid-body model proves how motion and loads are affected by the flexibility of the structure. OrcaFlex and OpenFAST generally agree, but there are some differences in results due to different modeling approaches. Since no experimental data are available in the study, this paper only forms a baseline for future studies but still proves and describes the possibilities of the approach and codes.

17 WIND ENERGY↗

Capacity Density Considerations for Floating Offshore Wind Farms in Ultradeep Waters

Capacity density describes the concentration of wind energy development in an area and is often specified in terms of megawatts-per-square-kilometer (MW/km2). Understanding capacity density trends in wind energy projects helps to inform both energy system and spatial planning efforts. Borrman et al. (2018) and Mulas Hernando et al. (2023) analyze capacity density trends for fixed-bottom offshore wind farms in Europe and the United States, respectively, and Cooperman et al. (2022) explores how floating offshore wind mooring technology choices may impact wind plant layout through setbacks from lease area boundaries in waters up to 1,300 m deep. Technical challenges facing floating offshore wind development in ultradeep waters (beyond 1,300 m) could impact achievable capacity densities, with potential implications to marine spatial planning and project economics. When compared to fixed-bottom commercial-scale wind farms, mooring system footprints from floating offshore wind systems can constrain capacity density in some circumstances. In this study, we conduct an initial investigation of how taut mooring configurations may constrain floating offshore wind turbine placement and estimate capacity density for representative floating wind plants in generic lease areas. In addition, we explore floating wind plant capacity density drivers in ultradeep waters by characterizing area utilization for a range of lease area characteristics. This analysis highlights the primary challenges that floating offshore wind systems may encounter in achieving capacity densities comparable to commercial-scale fixed-bottom projects at ultradeep water depths, from a technical standpoint.

capacity density↗