Carbon Capture Plant Front-End Engineering Design Study for Cement Manufacturing

The objective of this project was to conduct a Front-End Engineering Design (FEED) study for capturing carbon dioxide (CO₂) from cement plant flue gas using non-aqueous solvents (NAS) with a 95% capture efficiency. The study aimed to develop AACE (Association for the Advancement of Cost Engineering) Class 3 cost estimates for a commercial-scale CO₂ capture system with a capacity of 2.4 million tonnes of CO₂ per year (t-CO₂/yr). The results will provide Cemex and the U.S. Department of Energy with reliable data to support investment decisions, evaluate economic feasibility, and guide future project development and implementation.

20 FOSSIL-FUELED POWER PLANTS↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Front-end engineering design (FEED) studies: a quantitative analysis

NETL has devised a methodology for normalizing FEED study metrics of interest and allowing cautious quantitative comparison across FEED studies. This presentation introduces the novel quantitative comparison methodology and presents results from utilizing this methodology to examine data presented in recent FEED study reports. The quantitative methodology developed for the examination of FEED study performance and cost also allows comparison of real-world performance and costs against NETL TEA model predicted performance and cost. Learnings from examining NETL model predicted performance and cost versus real world reported values are highlighted. These learnings provide insight into NETL TEA model uncertainty and highlight opportunities for further model development.

FEED Studies↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

One Earth Energy FEED Process Design Basis

This report establishes the process design basis for the front-end engineering design (FEED) of a carbon capture and injection facility at One Earth Energy's (OEE) ethanol production plant in Gibson City, Illinois, developed as part of the Illinois Storage Corridor CarbonSAFE Phase III project. The facility is designed to compress and dehydrate up to approximately 458,000 metric tonnes of CO 2 per year, sourced directly from OEE's ethanol fermenters, for permanent injection into a saline aquifer approximately four miles from the plant. At normal operating conditions, the system will process 1,290 metric tonnes of CO 2 per day, assuming 355 operating days per year and an ethanol production rate of 160 million gallons per year. The proposed process trains a multistage centrifugal blower with a five-stage reciprocating compressor, delivering CO 2 to the injection wellhead at up to 1,500 psig. Triethylene glycol (TEG) dehydration, applied after the fourth compression stage, reduces water content to a target of 10 lb/MMscf, well within the 30 lb/MMscf injection limit. Beyond dehydration, no additional treatment is required; trace impurities including oxygen and nitrogen will remain in the injected stream. Key design considerations include the absence of spare cooling tower capacity at the site, necessitating new cooling infrastructure, and the need for a new electrical substation to support large motor loads. The facility is designed for continuous, largely unattended operation, monitored around the clock by existing OEE operations staff. This document serves as the foundational reference for all subsequent detailed engineering activities associated with the OEE CO 2 injection facility.

01 COAL, LIGNITE, AND PEAT↗

Insights from FEED studies for retrofitting existing fossil power plants with carbon capture technology

Recent United States Department of Energy (DOE) sponsored front-end engineering design (FEED) studies for retrofitting existing fossil-fueled power plants with state-of-the-art carbon capture technology contain previously overlooked real-world design considerations for near-term deployment of carbon capture. Insights from examining seven recently published FEED study reports are summarized in this paper. This includes a discussion of the design, performance, and cost implications associated with (1) location-specific considerations such as water availability, land availability, and accessibility; (2) host-plant-specific factors such as flue gas specifications, allowable degree of integration between the capture system and host plant, and operational mode; and (3) miscellaneous factors such as market conditions, permitting requirements, and business case incentives. In conclusion, this manuscript highlights (1) water availability as a key design and cost driver, with host plant steam extraction increasing capture system cooling water availability, (2) modularization and constructability impacts on the number of capture trains, (3) the impacts of host plant operational mode and capacity factor on the business case for installing capture, and (4) the merit of continued research, development, and demonstration efforts addressing steam extraction, host plant tie-in at the stack, solvent reclamation and air emissions control.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Polk Power Station NGCC Carbon Capture FEED Study

Final Technical Report for Tampa Electric Company's Front-End Engineering Design Study for the implementation of an amine-based Carbon Capture System by ION Clean Energy at the Polk Power Station, Unit 2.

20 FOSSIL-FUELED POWER PLANTS↗

Economic and Jobs Impacts of Point-Source Carbon Capture in Cement Industry – Case Study

The cement industry accounts for an estimated 8% of global CO2 emissions, which surpasses that of the entire aviation sector. In contrast with other industries, where CO2 emissions can be drastically reduced via electrification or fuels substitution, cement production releases CO2 as part of its process, during the calcination of carbonates to yield oxides. Thus, point-source carbon capture has become a key technology in the cement industry’s decarbonization. Apart from the expected environmental benefits, point-source carbon capture in the cement industry can yield important economic benefits and create jobs. The objective of this study was to perform a preliminary assessment of the economic and workforce impacts associated with the construction and operation of a point-source carbon capture retrofit of an existing cement production facility, using as a basis the data from a front-end engineering design (FEED) study to install a 3.9 million metric tons per year (Mtpy) CO2 capture facility at Holcim Ste Genevieve cement plant in Missouri, United States of America. The advanced carbon capture technology used in this FEED study was Air Liquide’s Cryocap™ FG carbon capture technology. The study evaluated the direct, indirect, and induced economic impacts of the construction, operation, and maintenance activities of the project over its lifespan. It also covered how the project will generate new jobs, their nature, and quantity, along with strategies to prepare the workforce. To perform this study, construction, operation, and maintenance cost estimates, as well as construction and operation staffing plans from the FEED study were input into IMPLAN version 7.5 software, licensed by IMPLAN Group LLC (Huntersville, VC), to predict the direct, indirect and induced economic impacts of the project using industry multipliers from the software. Additionally, recruitment strategies were developed for hiring individuals who belong to groups that are historically underserved or underrepresented, as well as anticipated recruitment of workers from the local community (whether training will be required or if the skills are associated with an existing labor force). The analysis estimated that the construction and operation of the carbon capture at Holcim Ste. Genevive will result in over 24 thousand work-years of job opportunities, close to USD 10 billion of economic impacts, including over USD 460 million of tax revenue. These results encompass the direct, indirect, and induced effects. A strategy to maximize hiring from the project and neighboring counties was developed, leveraging training agreements with local trade groups and universities. The result of this study can be used for a strategic preliminary assessment of the potential regional economic and job impacts of retrofitting existing cement plants with point source carbon systems, and its methodology can be replicated to individual projects to aid in planning and workforce development.

01 COAL, LIGNITE, AND PEAT↗

Direct Air Capture and Utilization System (DACUS): FEED Study of CarbonCapture Inc. DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat

The effects of climate change are drastically perceived through the alarming rates of severe events such as flooding, hurricanes, wildfires, global temperature rise, sea-level rise, and ocean acidification etc., which has prompted the nations across the globe to control & reduce greenhouse gas (GHG) emissions, by massive adoption of electric vehicles, switching to renewal energy sources and promoting sustainable green products. However, recent climate studies have shown that such efforts will not be enough to keep the global temperature rising under 1.5° Celsius by the year 2050, which lead to the development of multiple Direct Air Capture (DAC) technologies. A DAC system extracts CO2 directly from the atmosphere, which is either stored underground for long term or utilized in other processes. The DACUS proposed at U.S. Steel Corporation’s Gary Works Plant in Gary, Indiana, will include an innovative DAC technology from CarbonCapture Inc. (CCI), which will be collocated and powered by waste heat from the steel plant to capture CO2 from ambient air, and CarbonCure CO2 utilization technology- which is a commercial technology that is already installed and in use by early adopters in more than 150 concrete mixing plants across North America and Asia. The University of Illinois at Urbana Champaign spearheaded this Front-End Engineering Design (FEED) study project, which was funded by US Department of Energy (DOE), aimed at designing a state-of-the art DACU system that can remove minimum of 5,000 tonne/year net CO2 from air (based on cradle-to-gate LCA) and converting the captured CO2 into low carbon intensity products. The off takers of the low Carbon product produced by the DACUS have also been identified near the steel plant in the Indiana, Illinois & Wisconsin Region. This creates a full CO2 value chain and provides a means to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. DACUS is a promising new technology for reducing greenhouse gas in the atmosphere. Operation costs are minimized by locating CCI’s innovative DAC collector at United States Steel's Gary Works site where waste heat is utilized. Carbon emissions are minimized in CO2 transportation. The captured CO2 will be permanently sequestered in concrete used as construction material. This DOE funded FEED study demonstrates a full CO2 value chain for a DACU system, supported by an industrial facility. If this project were constructed, it would have a very positive and lasting impact on both the environment and the community.

42 ENGINEERING↗

Recovery and Refining of Rare Earth Elements from Lignite Mine Wastes

The University of North Dakota (UND), in collaboration with a comprehensive team of technical, business and host-site partners, built on prior technology development to complete a front-end engineering and design (FEED) and business planning study to recover and refine rare earth elements (REE) and critical minerals (CM) from North Dakota (ND) lignite mine wastes. The end of project goal was to have an investment quality project and a committed team ready to commercialize the proposed technologies in a future construction and operations phase.

01 COAL, LIGNITE, AND PEAT↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING↗

FEED Study for Climeworks Direct Air Capture at a California Geothermal Facility with Long-Term Storage (Final Scientific/Technical Report)

The overall objective of the project is to execute and complete a front-end engineering and design (FEED) study of an advanced Direct Air Capture (DAC) and Storage (DAC+S) system that is capable of removing and sequestering a minimum of 5,000 tonne/yr of CO 2 from the air based on cradle-to-gate life cycle assessment (LCA). The project will examine retrofitting and utilizing an existing domestic geothermal resource. The selected DAC system will be technology from Climeworks AG (Climeworks) that consists of an adsorption-desorption process to remove CO 2 from ambient air by using a selective filter. The geothermal host site is operated by Ormat Technologies Inc. (ORMAT). The DAC system will capture CO 2 using thermal energy from the host geothermal resource. This Final Scientific/Technical Report is a collection of the deliverables for the project. The project team was not able to successfully complete all the necessary tasks for this project. Shortly after the start of the project, two (2) project partners removed themselves from the study. The Awardee attempted to find a replacement for the direct air capture technology provider and geothermal energy provider. Due to this the awardee submitted a letter of cancellation for the project, letter is attached in the appendix. No funds were expended during the course of the project.

15 GEOTHERMAL ENERGY↗

Industrial Carbon Capture from a Cement Facility Using the Cryocap™ FG Process

The objective of the project was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO 2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO 2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The industrial host site emits approximately 3 million tonnes CO 2 /year based on plant data from 2020-2022. The captured CO 2 will meet the requirements of transport (Pipeline Grade) and geological storage, and the geological storage facilities within 80 miles of the CO 2 source. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

Industrial Carbon Capture from a Cement Facility Using the Cryocap FG Process (FE0032136)

The project's objective was to execute and complete front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separate 95% of the total CO2 emissions at an industrial facility, producing at least 100,000 metric tonnes/year of CO2 for sequestration. The industrial facility selected is the Holcim (US) Ste. Genevieve cement manufacturing facility (the largest single kiln line in the world), while the carbon capture system selected is Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology developed by Air Liquide. The impact of the project on Environmental Justice and the regional economy was also analyzed.

01 COAL, LIGNITE, AND PEAT↗

Carbon Capture on Air Liquide United States Gulf Coast Steam Methane Reformer using the Cryocap TM Flue Gases Process

The objective of this DOE-funded project is to execute and complete a Front-End Engineering and Design (FEED) study for a commercial-scale carbon capture project for Air Liquide’s Steam Methane Reformer (SMR) located at La Porte, near Houston, Texas. The Host Site is one of Air Liquide’s largest SMR assets, and supplies hydrogen to the Air Liquide Gulf Coast Hydrogen System, which serves refiners and petrochemical manufacturers through an existing H2 pipeline spanning roughly 200 miles from Port Arthur, TX to Bay City, TX. The Host Site produces up to 116.5 million standard cubic feet per day (MMSCFD) of gaseous hydrogen and emits approximately 950 ktpy CO 2 at the nameplate capacity. The evolving importance of decarbonized H2 for both existing customers and new markets, as well as the availability and intent of prominent third-party partners to transport and sequester captured CO 2 in locally abundant geological sites for 45Q credits, make the AL US Gulf Coast SMR an ideal site for the proposed FEED study. The envisioned carbon capture system is based on Air Liquide’s proprietary Cryocap™ Flue Gas (FG) process. The integration of the Cryocap™ FG technology to the existing SMR would enable the capture of 900 ktpy of CO 2 , with a net carbon capture rate of >95% and with minimum impact on the levelized cost of hydrogen produced at 99.97% purity.

03 NATURAL GAS↗

Wyoming Trails Carbon Hub (WyoTCH)

The Wyoming Trails Carbon Hub (WyoTCH) project completed a front-end engineering and design (FEED) study for a commercial-scale, open-access carbon dioxide (CO 2 ) transport pipeline in Wyoming under U.S. Department of Energy (DOE) Award DEFE0032347, funded through the Bipartisan Infrastructure Law Carbon Capture Technology Program and administered by the National Energy Technology Laboratory. The project’s approach of designing a multi-source, multi-destination pipeline, rather than a dedicated line serving a single project, would lower the barrier to entry for individual CO 2 projects. The projects would leverage Wyoming's concentrated industrial and power generation CO 2 sources, its existing CO 2 pipeline infrastructure, and its extensive CO 2 storage and utilization capacity. This is the project's final technical report.

01 COAL, LIGNITE, AND PEAT↗