Search NASA⌕ Search

SEARCH · Search NASA

Results for “full life cycle operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Digital Twin Network (DTN): Concepts, Architecture, and Key Technologies

With the commercial deployment of 5G and the migration of internet from IPv4 to IPv6, the new development of the network technology has highly attracted the attention of the industry. The intelligentization of network is believed as the trend of the new generation of network development. The network provides the foundation for the information transmission in the digital society, and the digitalization of the network itself is the prerequisite for the intelligent development. Facing the goal of the new generation of digital and intelligent network, this paper introduces the new concept of "digital twin network (DTN)", designs the system architecture, and analyzes the key technologies of DTN. By investigating the challenges of DTN, this paper points out the future development direction of digital twin network.

digital twin network↗

Lunar power system summary of studies for the lunar enterprise task force NASA-office of exploration

The capacity of global power systems must be increased by a factor of ten to provide the predicted power needs of electric power by the year 2050. The Lunar Power System (LPS) would collect solar energy at power bases located on opposing limbs of the moon as seen from Earth. LPS can provide dependable, economic, renewable, and environmentally benign solar energy to Earth. A preliminary engineering and cash flow model of the LPS was developed. Results are shown for a system scaled to a peak capacity of 355 GWe on Earth and to provide 13,600 GWe-Yrs of energy over a 70 year life cycle of construction and full operation. The growth in capacity of the reference system from start of installation on the moon in 2005 to completion of its nominal life cycle in the year 2070 is shown. World needs for power could be accommodated by expansion in capacity of the reference LPS beyond 344 GWe. This would be done by steadily incorporating newer technology during full operation and by establishing additional bases. The results presented encourage consideration of a faster paced program than is assumed herein.

Criswell, David R.↗

Modeling and Simulation Tools for Heavy Lift Airships

For conventional fixed wing and rotary wing aircraft a variety of modeling and simulation tools have been developed to provide designers the means to thoroughly investigate proposed designs and operational concepts. However, lighter-than-air (LTA) airships, hybrid air vehicles, and aerostats have some important aspects that are different from heavier-than-air (HTA) vehicles. In order to account for these differences, modifications are required to the standard design tools to fully characterize the LTA vehicle design and performance parameters.. To address these LTA design and operational factors, LTA development organizations have created unique proprietary modeling tools, often at their own expense. An expansion of this limited LTA tool set could be accomplished by leveraging existing modeling and simulation capabilities available in the National laboratories and public research centers. Development of an expanded set of publicly available LTA modeling and simulation tools for LTA developers would mitigate the reliance on proprietary LTA design tools in use today. A set of well researched, open source, high fidelity LTA design modeling and simulation tools would advance LTA vehicle development and also provide the analytical basis for accurate LTA operational cost assessments. This paper will present the modeling and analysis tool capabilities required for LTA vehicle design, analysis of operations, and full life-cycle support. A survey of the tools currently available will be assessed to identify the gaps between their capabilities and the LTA industry's needs. Options for development of new modeling and analysis capabilities to supplement contemporary tools will also be presented.

airship design and analysis↗

Advancing the practice of systems engineering at JPL

In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.

process improvement↗

Silicon Whisker and Carbon Nanofiber Composite Anode

Phase II Objectives: Demonstrate production levels of grams per batch; Achieve full cell anode capacity of greater than 1,000 mAh/g at a charge rate of 10 (C/10) and 0 degree C; Establish a full cell cycle life of over 300 cycles; Display an operating temperature of negative 30 degrees C to plus 30 degrees C; Demonstrate a rate capability of C/5 or higher; Deliver to NASA three 2.5 Ah cells (energy density greater than 220 Wh/kg); Exhibit the safety features of the anode and full cells; Design a 1 kWh prismatic battery pack.

Lang, Christopher M.↗

Successful completion of a cyclic ground test of a mercury ion auxiliary propulsion system

An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.

Francisco, David R.↗

Successful completion of a cyclic ground test of a mercury Ion Auxiliary Propulsion System

An engineering model Ion Auxiliary Propulsion System (IAPS) 8-cm thruster (S/N 905) has completed a life test at NASA Lewis Research Center. The mercury ion thruster successfully completed and exceeded the test goals of 2557 on/off cycles and 7057 hr of operation at full thrust. The final 1200 cycles and 3600 hr of the life test were conducted using an engineering model of the IAPS power electronics unit (PEU) and breadboard digital controller and interface unit (DCIU). This portion of the test is described in this paper with a charted history of thruster operating parameters and off-normal events. Performance and operating characteristics were constant throughout the test with only minor variations. The engineering model power electronics unit operated without malfunction; the flight software in the digital controller and interface unit was exercised and verified. Post-test inspection of the thruster revealed facility enhanced accelerator grid erosion but overall the thruster was in good condition. It was concluded that the thruster performance was not drastically degraded by time or cycles. Additional cyclic testing is currently under consideration.

Francisco, David R.↗

NASA's Robotic Mining Competition Provides Undergraduates Full Life Cycle Systems Engineering Experience

NASA has held an annual robotic mining competition for teams of university/college students since 2010. This competition is yearlong, suitable for a senior university engineering capstone project. It encompasses the full project life cycle from ideation of a robot design, through tele-operation of the robot collecting regolith in simulated Mars conditions, to disposal of the robot systems after the competition. A major required element for this competition is a Systems Engineering Paper in which each team describes the systems engineering approaches used on their project. The score for the Systems Engineering Paper contributes 25% towards the team’s score for the competition’s grand prize. The required use of systems engineering on the project by this competition introduces the students to an intense practical application of systems engineering throughout a full project life cycle.

Stecklein, Jonette↗

NASA's Robotics Mining Competition Provides Undergraduates Full Life Cycle Systems Engineering Experience

NASA has held an annual robotic mining competition for teams of university/college students since 2010. This competition is yearlong, suitable for a senior university engineering capstone project. It encompasses the full project life cycle from ideation of a robot design to actual tele-operation of the robot in simulated Mars conditions mining and collecting simulated regolith. A major required element for this competition is a Systems Engineering Paper in which each team describes the systems engineering approaches used on their project. The score for the Systems Engineering Paper contributes 25% towards the team's score for the competition's grand prize. The required use of systems engineering on the project by this competition introduces the students to an intense practical application of systems engineering throughout a full project life cycle.

Stecklein, Jonette↗

NASA CSTI Earth-to-orbit propulsion R/T program overview

The topics presented are covered in viewgraph form. The programmatic objectives are to develop and validate technology, design tools, and methodologies needed for the development of a new generation of lower cost, operationally-efficient, long-life, highly reliable ETO propulsion systems. The technical objectives are: (1) high quality, low cost, inspectable manufacturing; (2) safe shutdown to fault tolerance operations for safety; (3) condition monitoring diagnostics for maintainability; (4) automatic servicing and checkout for ground operations; (5) max commensurate with life for performance; and full flow, combined cycle for advanced cycles.

Moses, James L.↗

DSN Antenna Array Architectures Based on Future NASA Mission Needs

A flexible method of parametric, full life-cycle cost analysis has been combined with data on NASA's future communication needs to estimate the required number and operational dates of new antennas for the Deep Space Network (DSN). The requirements were derived from a subset of missions in the Integrated Mission Set database of NASA's Space Communications Architecture Working Group. Assuming that no new antennas are 'constructed', the simulation shows that the DSN is unlikely to meet more than 20% of mission requirements by 2030. Minimum full life-cycle costs result when antennas in the diameter range, 18m-34m, are constructed. Architectures using a mixture of antenna diameters produce a slightly lower full life-cycle cost.

array↗

JPL reuse program

The goal of the JPL reuse activity is to develop a quantitative understanding of the factors which encourage or inhibit software reuse, and of productivity improvements achievable through reuse. The primary activity is the measurement of parameters relevant to reuse in the environment of actual projects. The program has three objectives: (1) to develop a model to allow assessment of competing reuse techniques, (2) to extend reuse from the unit to the sub-system level, and (3) to expand from specific applications to a broader application domain. Application domains, which apply to all interplanetary projects, include Mission Operations, Science Information Systems, Flight Software, and Simulations. The program is targeting all phases and activities of the life cycle and a full range of software products. The approach will be both experimental (observe, hypothesize and evaluate) and constructive (introduce new tools and techniques). The primary target projects are Deep Space Network activities - the Ground Facilities facility upgrade, the Network Operations Control Center upgrade, and the Signal Processing Center. This is the first group of closely related projects being done in Ada at JPL. A reuse base will be developed initially by classifying potentially reusable components from one project; it will be used and expanded with additional projects.

Brown, James W.↗

Free-piston stirling engine endurance test program

The Free-Piston Stirling Engine (FPSE) has the potential to be a long-lived, highly reliable, power conversion device attractive for many product applications such as space, residential, or remote-site power. The purpose of endurance testing the FPSE is to demonstrate its potential for long life. The endurance program was directed at obtaining 1000 operational hours under various test conditions: low power, full stroke, duty cycle, and stop/start. Critical performance parameters were measured to note any change and/or trend. Inspections were conducted to measure and compare critical seal/bearing clearance. The engine performed well throughout the program, completing the 1000 hours. Hardware inspection, including the critical clearances, showed no significant change in hardware or clearance dimensions. The performance parameters did not exhibit any increasing or decreasing trends. The test program confirms the potential for long-life FPSE applications. Additional testing is planned to increase the test hours to 10,000.

Dochat, G.↗

Free-piston Stirling engine/linear alternator 1000-hour endurance test

The Free Piston Stirling Engine (FPSE) has the potential to be a long lived, highly reliable, power conversion device attractive for many product applications such as space, residential or remote site power. The purpose of endurance testing the FPSE was to demonstrate its potential for long life. The endurance program was directed at obtaining 1000 operational hours under various test conditions: low power, full stroke, duty cycle and stop/start. Critical performance parameters were measured to note any change and/or trend. Inspections were conducted to measure and compare critical seal/bearing clearances. The engine performed well throughout the program, completing more than 1100 hours. Hardware inspection, including the critical clearances, showed no significant change in hardware or clearance dimensions. The performance parameters did not exhibit any increasing or decreasing trends. The test program confirms the potential for long life FPSE applications.

Rauch, J.↗

Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Engineering Concepts to High Energy Density Li-S Batteries

Li-S batteries (LSBs) with energy densities > 500 Wh/kg @ C/5 and >1000 cycles, cycle life operating over wide temperatures has been identified to be critical for meeting the global energy demands. Progress is however, very much limited due to several major hurdles related to the following: (a) poor Li' reaction kinetics (conductivity/diffusivity) enabling full reversible S conversion to Li2S, (b) inferior electron (e) conductivity, specific capacity and cycle life due to electrolyte soluble species of polysulfides (PSs) formed with the reaction of Li ions with sulfur migrating to anode, (c) unstable solid electrolyte interphase (SEI) formation and finally, (d) dendrites that are formed on the Li metal anode severely limiting the cycle life due to polarization at the solid/liquid interfaces causing safety, inferior capacity, energy density, rate, and cycle life issues. Creation of a fully functional economical ≤$80/kWh, high energy density LSBs is vital for enabling its widespread commercial deployment and use in current and next generation electric vehicles.

25 ENERGY STORAGE↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report

Thruster valve assemblies (T/VA's) were subjected to the development test program for the combined JPL Low-Cost Standardized Spacecraft Equipment (LCSSE) and Mariner Jupiter/Saturn '77 spacecraft (MJS) programs. The development test program was designed to achieve the following program goals: (1) demonstrate T/VA design compliance with JPL Specifications, (2) to conduct a complete performance Cf map of the T/VA over the full operating range of environment, (3) demonstrate T/VA life capability and characteristics of life margin for steady-state limit cycle and momentum wheel desaturation duty cycles, (4) verification of structural design capability, and (5) generate a computerized performance model capable of predicting T/VA operation over pressures ranging from 420 to 70 psia, propellant temperatures ranging from 140 F to 40 F, pulse widths of 0.008 to steady-state operation with unlimited duty cycle capability, and finally predict the transient performance associated with reactor heatup during any given duty cycle, start temperature, feed pressure, and propellant temperature conditions.

Clark, E. C.↗

Programming support environment issues in the Byron programming environment

Issues are discussed which programming support environments need to address in order to successfully support software engineering. These concerns are divided into two categories. The first category, issues of how software development is supported by an environment, includes support of the full life cycle, methodology flexibility, and support of software reusability. The second category contains issues of how environments should operate, such as tool reusability and integration, user friendliness, networking, and use of a central data base. This discussion is followed by an examination of Byron, an Ada based programming support environment developed at Intermetrics, focusing on the solutions Byron offers to these problems, including the support provided for software reusability and the test and maintenance phases of the life cycle. The use of Byron in project development is described briefly, and some suggestions for future Byron tools and user written tools are presented.

Larsen, Matthew J.↗