Search NASA⌕ Search

SEARCH · Search NASA

Results for “functional performance testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Functional and performance tests of two capillary pumped loop engineering models

This paper presents the results of the functional and performance tests for two capillary pumped loop (CPL) engineering models. Both CPL systems are aluminum/ammonia transport systems which contain eight parallel evaporators and six parallel condensers in a single loop. Tests conducted include the transport limit, heat load shearing between evaporators, liquid inventory/temperature control by the reservoir, pressure priming under heat load, diode function of condensers, and isolation of a single deprimed evaporator. Consistent performance results were obtained for both systems. Transport capabilities of up to 70 kw-m with individual evaporators managing up to 1.7 kw, with a corresponding input heat flux of 15w/sq cm, were demonstrated. These tests demonstrated the ability of a CPL system to operate over a wide range of conditions and thus established the viability of these systems for high power thermal management of large spacecraft, such as the NASA Space Station.

Ku, J.↗

Functional Task Test: 3. Skeletal Muscle Performance Adaptations to Space Flight

The functional task test is a multi-disciplinary study investigating how space-flight induced changes to physiological systems impacts functional task performance. Impairment of neuromuscular function would be expected to negatively affect functional performance of crewmembers following exposure to microgravity. This presentation reports the results for muscle performance testing in crewmembers. Functional task performance will be presented in the abstract "Functional Task Test 1: sensory motor adaptations associated with postflight alternations in astronaut functional task performance." METHODS: Muscle performance measures were obtained in crewmembers before and after short-duration space flight aboard the Space Shuttle and long-duration International Space Station (ISS) missions. The battery of muscle performance tests included leg press and bench press measures of isometric force, isotonic power and total work. Knee extension was used for the measurement of central activation and maximal isometric force. Upper and lower body force steadiness control were measured on the bench press and knee extension machine, respectively. Tests were implemented 60 and 30 days before launch, on landing day (Shuttle crew only), and 6, 10 and 30 days after landing. Seven Space Shuttle crew and four ISS crew have completed the muscle performance testing to date. RESULTS: Preliminary results for Space Shuttle crew reveal significant reductions in the leg press performance metrics of maximal isometric force, power and total work on R+0 (p<0.05). Bench press total work was also significantly impaired, although maximal isometric force and power were not significantly affected. No changes were noted for measurements of central activation or force steadiness. Results for ISS crew were not analyzed due to the current small sample size. DISCUSSION: Significant reductions in lower body muscle performance metrics were observed in returning Shuttle crew and these adaptations are likely contributors to impaired functional tasks that are ambulatory in nature (See abstract Functional Task Test: 1). Interestingly, no significant changes in central activation capacity were detected. Therefore, impairments in muscle function in response to short-duration space flight are likely myocellular rather than neuromotor in nature.

Ryder, Jeffrey W.↗

VLSI-Chip Tester

Compact test set integrated in computer-aided design system. Test set performs functional tests on very-large-scale integrated (VLSI) circuits. Makes tests from points within VLSI chip as well as at input and output pins. Used for quality control and design; in latter capacity, checks internal logic functions on chip and feed results directly to computer-aided design system for correction. Also simulates operation of chip design before chip is made. VLSI Tester contains three power supplies, control logic, and standard multibus circuit board in aluminum chassis. Chassis fits under platform of microprobe station. Multibus board links tester to interactive terminals and to host computer.

Deutsch, Leslie J.↗

Space Communications and Navigation (SCaN) Network Simulation Tool Development and Its Use Cases

In this work, we focus on the development of a simulation tool to assist in analysis of current and future (proposed) network architectures for NASA. Specifically, the Space Communications and Navigation (SCaN) Network is being architected as an integrated set of new assets and a federation of upgraded legacy systems. The SCaN architecture for the initial missions for returning humans to the moon and beyond will include the Space Network (SN) and the Near-Earth Network (NEN). In addition to SCaN, the initial mission scenario involves a Crew Exploration Vehicle (CEV), the International Space Station (ISS) and NASA Integrated Services Network (NISN). We call the tool being developed the SCaN Network Integration and Engineering (SCaN NI&E) Simulator. The intended uses of such a simulator are: (1) to characterize performance of particular protocols and configurations in mission planning phases; (2) to optimize system configurations by testing a larger parameter space than may be feasible in either production networks or an emulated environment; (3) to test solutions in order to find issues/risks before committing more significant resources needed to produce real hardware or flight software systems. We describe two use cases of the tool: (1) standalone simulation of CEV to ISS baseline scenario to determine network performance, (2) participation in Distributed Simulation Integration Laboratory (DSIL) tests to perform function testing and verify interface and interoperability of geographically dispersed simulations/emulations.

Jennings, Esther↗

Defining the Physiological Factors that Contribute to Postflight Changes in Functional Performance

Astronauts experience alterations in multiple physiological systems due to exposure to the microgravity conditions of space flight. These physiological changes include sensorimotor disturbances, cardiovascular deconditioning and loss of muscle mass and strength. These changes might affect the ability of crewmembers to perform critical mission tasks immediately after landing on lunar and Martian surfaces. To date, changes in functional performance have not been systematically studied or correlated with physiological changes. To understand how changes in physiological function impact functional performance an interdisciplinary pre/postflight testing regimen (Functional Task Test, FTT) has been developed that systematically evaluates both astronaut postflight functional performance and related physiological changes. The overall objective of the FTT is to identify the key underlying physiological factors that contribute to performance of functional tests that are representative of critical mission tasks. This study will identify which physiological systems contribute the most to impaired performance on each functional test. This will allow us to identify the physiological systems that play the largest role in decrement in functional performance. Using this information we can then design and implement countermeasures that specifically target the physiological systems most responsible for the altered functional performance associated with space flight. The functional test battery was designed to address high priority tasks identified by the Constellation program as critical for mission success. The set of functional tests making up the FTT include the: 1) Seat Egress and Walk Test, 2) Ladder Climb Test, 3) Recovery from Fall/Stand Test, 4) Rock Translation Test, 5) Jump Down Test, 6) Torque Generation Test, and 7) Construction Activity Board Test. Corresponding physiological measures include assessments of postural and gait control, dynamic visual acuity, fine motor control, plasma volume, orthostatic intolerance, upper and lower body muscle strength, power, fatigue, control and neuromuscular drive. Crewmembers perform both functional and physiological tests before and after short (Shuttle) and long-duration (ISS) space flight. Data are collected on R+0 (Shuttle only), R+1, R+6 and R+30.

Bloomberg, J. J.↗

A Medium Voltage Testbed for the Performance and Function Tests of a 13.8 kV Power Conditioning System Converter

Medium voltage SiC devices facilitate the development of medium voltage grid-connected power electronics converters. However, it is difficult to test these converters directly on the real medium voltage grid, especially considering abnormal grid conditions, such as grid voltage and frequency variation, and different converter operation modes, such as grid-connected mode and islanded mode. This paper introduces the design and implementation of a medium voltage testbed, which supports tests of medium voltage converters in both grid-connected and islanded mode tests. In the grid-connected mode, the testbed can provide up to 13.8 kV grid voltage, can support the four-quadrant operation, and can emulate different grid conditions, such as voltage and frequency variation. In the islanded mode, the converter under test works as a voltage source and the testbed emulates a three-phase balanced or unbalanced load. Experiment test results are provided to validate the design and capability of the testbed.

Li, Haiguo↗

Electrical Evaluation of RCA MWS5001D Random Access Memory, Volume 1

Electrical characterization and qualification tests were performed on the RCA MWS5001D, 1024 by 1-bit, CMOS, random access memory. Characterization tests were performed on five devices. The tests included functional tests, AC parametric worst case pattern selection test, determination of worst-case transition for setup and hold times and a series of schmoo plots. The qualification tests were performed on 32 devices and included a 2000 hour burn in with electrical tests performed at 0 hours and after 168, 1000, and 2000 hours of burn in. The tests performed included functional tests and AC and DC parametric tests. All of the tests in the characterization phase, with the exception of the worst-case transition test, were performed at ambient temperatures of 25, -55 and 125 C. The worst-case transition test was performed at 25 C. The preburn in electrical tests were performed at 25, -55, and 125 C. All burn in endpoint tests were performed at 25, -40, -55, 85, and 125 C.

Klute, A.↗

AMTS update for STTR

Advanced nuclear reactor systems currently in development include designs that utilize higher energy neutron spectrums, higher temperatures, and corrosive environments that are quite different from the current fleet of nuclear power plants in use today. As a result, new structural materials must be developed and qualified for use to support these advanced systems. For example, research is currently being conducted on a new class of materials known as multi-principle-element-alloys. These alloys show some promise to be able to meet the structural needs of these challenging reactor systems. However, due to the vast available compositional space, and the limited amount of research conducted thus far, Idaho National Laboratory (INL)sought a way to advanced mechanical testing capability for highly irradiated structural materials to increase both throughput and higher fidelity data analysis through incorporation of digital image correlation. The Automated Mechanical Testing System accomplishes these tasks by automating the testing and incorporating digital image correlation to provide higher fidelity data. INL has now received this system and is currently performing functional testing and training. INL is also performing some modifications to the system to allow for installation into a remote shielded enclosure where testing of irradiated structural materials can be performed. After testing, training, and modifications of the system are complete, INL will install the system into a shielded enclosure and begin using the system to test irradiated structural materials.

36 MATERIALS SCIENCE↗

WRAP-RIB antenna technology development

The wrap-rib deployable antenna concept development is based on a combination of hardware development and testing along with extensive supporting analysis. The proof-of-concept hardware models are large in size so they will address the same basic problems associated with the design fabrication, assembly and test as the full-scale systems which were selected to be 100 meters at the beginning of the program. The hardware evaluation program consists of functional performance tests, design verification tests and analytical model verification tests. Functional testing consists of kinematic deployment, mesh management and verification of mechanical packaging efficiencies. Design verification consists of rib contour precision measurement, rib cross-section variation evaluation, rib materials characterizations and manufacturing imperfections assessment. Analytical model verification and refinement include mesh stiffness measurement, rib static and dynamic testing, mass measurement, and rib cross-section characterization. This concept was considered for a number of potential applications that include mobile communications, VLBI, and aircraft surveillance. In fact, baseline system configurations were developed by JPL, using the appropriate wrap-rib antenna, for all three classes of applications.

Freeland, R. E.↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: EOS AMSU-A1 and AMSU-A2 Receiver Assemblies

The AMSU-A receiver subsystem comprises two separated receiver assemblies; AMSU-A1 and AMSU-A2 (P/N 1356441-1). The AMSU-A1 receiver contains 13 channels and the AMSU-A2 receiver 2 channels. The AMSU-A1 receiver assembly is further divided into two parts; AMSU-A1-1 (P/N 1356429-1) and AMSU-A1-2 (P/N 1356409-1), which contain 9 and 4 channels, respectively. The receiver assemblies are highlighted and illustrate the functional block diagrams of the AMSU-A1 and AMSU-A2 systems. The AMSU-A receiver subsystem stands in between the antenna and signal processing subsystems of the AMSU-A instrument and comprises the RF and IF components from isolators to attenuators. It receives the RF signals from the antenna subsystem, down-converts the RF signals to IF signals, amplifies and defines the IF signals to proper power level and frequency bandwidth as specified for each channel, and inputs the IF signals to the signal processing subsystem. This test report presents the test data of the EOS AMSU-A Flight Model No. 1 (FM-1) receiver subsystem. The tests are performed per the Acceptance Test Procedure for the AMSU-A Receiver Subsystem, AE-26002/6A. The functional performance tests are conducted either at the component or subsystem level. While the component-level tests are performed over the entire operating temperature range predicted by thermal analysis, the subsystem-level tests are conducted at ambient temperature only.

Ma, Y.↗

Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Performance Verification Report: METSAT AMSU-A2 Receiver Assembly, (P/N 1356441-1, S.N F04) S/N 107

The AMSU-A receiver subsystem comprises two separated receiver assemblies; AMSU-Al and AMSU-A2(PN1356441-1). The AMSU-A1 receiver contains 13 channels and the AMSU-A2 receiver 2 channels. The AMSU-AL receiver assembly is further divided into two parts; AMSU-A 1-1 (P/N 1356429-1) and AMSU-A 1-2 (P/N 1356409-1), which contain 9 and 4 channels, respectively. The AMSU-A receiver subsystem stands in between the antenna and signal processing subsystems of the AMSU-A instrument and comprises the RF and IF components from RF isolators to IF attenuators. It receives the RF signals from the antenna subsystem, down-converts the RF signals to IF signals, amplifies and defines the IF signals to proper power level and frequency bandwidth as specified for each channel, and inputs the IF signals to the signal processing subsystem. The test reports for the METSAT AMSU-A receiver subsystem are prepared separately for the A1 and A2 receivers so that each receiver stands alone during integration of instruments into the spacecraft. This test report presents the test data of the METSAT AMSU-A2 Flight Model No.4 (FM4) receiver. The tests are performed per the Acceptance Test Procedure for the AMSU-A Receiver Subsystem, AE-26002/6A. The functional performance tests are conducted either at the component or subsystem level. While the component-level tests are performed over the entire operating temperature range predicted by thermal analysis, the subsystem-level tests are conducted at ambient temperature only.

Kapper, R.↗

Integrated Advance Microwave Sounding Unit-A (AMSU-A). Performance Verification Report: EOS AMSU-A1 and AMSU-A2 Receivers Assemblies

This test report presents the test data of the EOS AMSU-A Flight Model No.1 (FM-1) receiver subsystem. The tests are performed per the Acceptance Test Procedure for the AMSU-A Reseiver Subsystem, AE-26002/6A. The functional performance tests are conducted either at the component or subsystem level. While the component-level tests are performed over the entire operating temperature range predicted by thermal analysis, the subsystem-level test are conducted at ambient temperature only.

Source record↗

Integrated Advanced Microwave Sounding Unit-A (AMSU-A). Performance Verification Report, METSAT (S/N:107) AMSU-A1 Receiver Assemblies: P/N 1356429-1, S/N:F04, P/N 1356409-1,S/N F04

This is the Performance Verification Report, METSAT (S/N: 107) AMSU-A1 Receiver Assemblies, P/N 1356429-1, SIN: F04, P/N 1356409- 1, S/N: F04, for the Integrated Advanced Microwave Sounding Unit-A (AMSU-A). The AMSU-A receiver subsystem comprises two separated receiver assemblies; AMSU-A1 and AMSU-A2 (P/N 1356441-1). The AMSU-A1 receiver contains 13 channels and the AMSU-A2 receiver 2 channels. The AMSU-A receiver assembly is further divided into two parts; AMSU-A I - I (P/N 13 5 6429- 1) and AMSU-A 1 -2 (P/N 1356409-1), which contain 9 and 4 channels, respectively. The AMSU-A receiver subsystem is located in between the antenna and signal processing subsystems of the AMSU-A instrument and comprises the RF and IF components from isolators to attenuators. It receives the RF signals from the antenna subsystem, down-converts the RF signals to IF signals, amplifies and defines the IF signals to proper power level and frequency bandwidth as specified for each channel, and inputs the IF signals to the signal processing subsystem. The test reports for the METSAT AMSU-A receiver subsystem are prepared separately for Al and A2 receivers so that each receiver stands alone during integration of instruments into the spacecraft. This test report presents the test data of the N4ETSAT AMSU-A1 Flight Model No. 4 (FM-4) receiver subsystem. The tests are performed per the Acceptance Test Procedure (ATP) for the AMSU-A Receiver Subsystem, AE-26002/6A. The functional performance tests are conducted either at the component or subsystem level. While the component-level tests are performed over the entire operating temperature range predicted by thermal analysis, most subsystem-level tests are conducted at ambient temperature only. Key performances (bandpass characteristics and noise figure) of the receiver subsystem are verified over the operating temperature.

Pines, D.↗

A 400-kWe high-efficiency steam turbine for industrial cogeneration

An advanced state-of-the-art steam turbine-generator developed to serve as the power conversion subsystem for the Department of Energy's Sandia National Laboratories' Solar Total-Energy Project (STEP) is described. The turbine-generator, which is designed to provide 400-kW of net electrical power, represents the largest turbine-generator built specifically for commercial solar-powered cogeneration. The controls for the turbine-generator incorporate a multiple, partial-arc entry to provide efficient off-design performance, as well as an extraction control scheme to permit extraction flow regulation while maintaining 110-spsig pressure. Normal turbine operation is achieved while synchronized to a local utility and in a stand-alone mode. In both cases, the turbine-generator features automatic load control as well as remote start-up and shutdown capability. Tests totaling 200 hours were conducted to confirm the integrity of the turbine's mechanical structure and control function. Performance tests resulted in a measured inlet throttle flow of 8,450 pounds per hour, which was near design conditions.

Leibowitz, H. M.↗

ROSA and Solar Cell Module Combined Environments Test Plan

Roll-out solar array (ROSA) technology is an emerging component of the future of spacecraft photovoltaic power subsystems. Qualification and risk reduction testing are necessary to demonstrate design worthiness for spaceflight implementation of the array and solar cell modules. Maxar Space LLC and NASA have undertaken a rigorous combined environment (CE) test campaign for a ROSA design expected to be a part of the Power and Propulsion Element (PPE) for the NASA Gateway which will be an outpost orbiting the Moon. The CE tests consist of several simulated space environment exposures associated with the planned mission: UV radiation, electron/proton radiation, xenon ion plume exposures, and vacuum thermal cycling and electrostatic discharge (ESD). These tests are conducted on small coupons consisting of the planned ROSA flight elements, and all tests are performed at the NASA Marshall Space Flight Center. This paper discusses the test plan, requirements for each environment, and the functional testing performed. Of note is a new approach for the induced primary arc used in the ESD testing, which better simulates the plasma expansion during the ESD event. Progress on executing the test plan is presented.

Space Environments Effects Testing↗

Flight performance of the Skylab earth resources experiment package

The earth resources experiment package consisted of six facility-type sensors, which were flown on the Skylab spacecraft to collect data for a large group of investigators. For satisfactory interpretation of their data, many of these investigators required knowledge of the actual realized sensor performance, which may have differed from ground-based test performance. Functional, geometric, and radiometric evaluations of each sensor were made by using flight data from selected ground scenes, the moon, and dark space. As a result of these evaluations made during the Skylab missions, several sensor operation anomalies were identified and the appropriate corrective action was taken.

Potter, A. E.↗

Track/train dynamics test report transfer function test. Volume 1: Test

A description is presented of the transfer function test performed on an open hopper freight car loaded with 80 tons of coal. Test data and a post-test update of the requirements document and test procedure are presented. Included are a statement of the test objective, a description of the test configurations, test facilities, test methods, data acquisition/reduction operations, and a chronological test summary. An index to the data for the three test configurations (X, Y, and Z-axis tests) is presented along with test sequence, run number, test reference, and input parameters.

Vigil, R. A.↗