Search NASASearch

SEARCH · Search NASA

Results for “fusion pilot plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

First Wall Design of a Tokamak Pilot Plant Using a Monte Carlo Model for 3-D Heat Flux Deposition

We present a method for calculating the heat fluxes deposited on nonaxisymmetric tokamak first wall components, allowing for a first-of-its-kind model for power handling in the tokamak far scrape-off layer (SOL). The DIV3D Monte Carlo model features strict global power conservation and can calculate the finite cross-field plasma transport into magnetically-shadowed regions, which is significant when dealing with meter-scale shadows introduced by components such as poloidal limiters or antennas. As a case study, we apply the DIV3D model to inform the distribution of first wall poloidal limiters in an ARC-class reactor device. We demonstrate that discrete protection limiters can efficiently reduce peak heat fluxes on recessed breeder wall components in the presence of significant far-SOL plasma fluxes. By varying the toroidal periodicity and radial standoff depth of the limiters, we demonstrate one of the tradeoffs that must be considered in first wall design: more limiters provide greater protection, but at the cost of reduced breeding performance. We also present the impact that radial misalignments between limiters would have on first wall power loading.

Monte Carlo methods

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

The U.S. Fusion Materials Community Roadmap: Near-term research priorities for the development of plasma-facing and structural materials for fusion power plants

In response to the needs of a rapidly growing private fusion industry, the U.S. Fusion Materials Coordinating Committee (FMCC) and the broader U.S. fusion materials research community undertook an extensive effort to create a comprehensive roadmap for fusion materials development. The result of this effort was the U.S. Fusion Materials Community Roadmap (US-FMCR), which describes the steps needed to advance the technical maturity of leading candidates for plasma-facing materials and structural materials for fusion power plants from laboratory-scale experiments to a point of sufficient technological readiness for industrial adoption and implementation. However, researchers face significant resource constraints as well as very aggressive pilot plant development timelines. Thus, the research strategies detailed in the US-FMCR require further assessment to downselect the specific tasks that must be prioritized within the next two to three years, in order to make the most efficient use of funding, human resources, and experimental facilities. This paper presents an overview of the US-FMCR and its development process. We also present the subset of research objectives that the FMCC identified as the most urgent research priorities for the U.S. fusion materials research community. The state-of-the-art of materials research is also highlighted for each class of materials considered in the US-FMCR. The recommendations presented here integrate an extensive evaluation of the current status of fusion materials research with a broad cross-section of opinion from the wider U.S. fusion community.

Ferry, Sara [Massachusetts Institute of Technology

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1

Maintenance strategy, structural design, and site layout of the ST-E1 fusion power plant

An effective fusion reactor maintenance scheme enables safe operations and short downtimes. This in turn leads to high availability, which is critical to the commercial viability of a power-producing plant. In tokamak-based fusion power plants, the chosen maintenance approach has a significant impact on the spatial design of the tokamak, as well as the surrounding infrastructure, and therefore needs to be considered from the outset. Tokamak Energy has developed a pre-concept design of a fusion power plant, ST-E1. This work describes the major drivers and constraints that have been considered, presents the tokamak architecture and chosen maintenance regime, and discusses how this enables the plant’s two-phased approach to demonstrating commercial operations. It also shows the implications for the design of other systems areas, in particular the machine structural arrangement and bioshield and hot cell layout. The reactor core segmentation and removal scheme replaces entire toroidal segments radially through a large vacuum port, along a single axis only. The result is a change-tolerant machine and plant layout that can accommodate the evolving designs of the tokamak.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Power and particle exhaust in the ST-E1 fusion power plant

Power exhaust challenges and potential solutions for a 5 m major radius, low-aspect ratio burning tokamak have been explored. 1D edge plasma models have been used to screen for access to detachment using short and long outer divertor legs in double and single null configurations, using Ar as the primary impurity and assuming tungsten plasma-facing components (PFCs). These show that detachment access can be accessed for all but the most conservative assumptions on scrape-off layer (SOL) width and power, but that trade-offs will be required between magnet engineering and the size of the acceptable window of as-yet uncertain plasma parameters. SOLPS-ITER was used to further model selected plasma scenarios, confirming that Ar seeding can be used to achieve dissipative divertor scenarios with peak deposited heat fluxes below 15 MWm -2 . Initial scoping of first wall loads and positioning of limiters has been carried out, showing the feasibility of protecting the breeding blanket wall during steady state without impeding tritium breeding. Initial PFC technology selection is also presented, identifying this as a critical area where further work is needed to find an attractive solution for helium-cooled PFCs that can handle high heat fluxes without excessive power requirements. Key questions and trade-offs for concept development have been identified, including: how to achieve high radiation for reduction of SOL power without core performance degradation; whether power exhaust can be well-controlled in a double null plasma; mechanical design and materials challenges of high-heat flux PFCs; and control of material erosion, redeposition and tritium retention.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Effects of Motion Fidelity on Pilot Performance Using Mixed-Reality Visuals

This paper investigates the effects of simulator motion fidelity on pilot performance using mixed-reality visuals. In NASA’s Vertical Motion Simulator, eleven pilots flew a lift-plus-cruise electric vertical takeoff and landing vehicle in a vertiport approach and landing task under four different motion conditions: no motion, small hexapod motion, large hexapod motion, and full motion. The simulator motion condition statistically significantly affected: 1) the severity of cybersickness, 2) motion ratings, 3) final approach and take-off boundary crossing groundspeeds, 4) longitudinal touchdown point, and 5) battery time remaining after landing. These results suggest that the use of motion systems in simulators with virtual- or mixed-reality visuals is warranted.

simulation

Effects of Motion Fidelity on Pilot Performance Using Mixed-Reality Visuals

This paper investigates the effects of simulator motion fidelity on pilot performance using mixed-reality visuals. In NASA’s Vertical Motion Simulator, eleven pilots flew a lift-plus-cruise electric vertical takeoff and landing vehicle in a vertiport approach and landing task with four different motion conditions: no motion, small hexapod motion, large hexapod motion, and full motion. The simulator motion condition statistically significantly affected: 1) the severity of cybersickness, 2) motion ratings, 3) final approach and take-off boundary crossing groundspeed, 4) longitudinal touchdown point, and 5) battery time remaining after landing. The findings suggest that motion systems are essential in simulators with virtual- or mixed-reality visuals when it is required to have pilot flying performance similar to that in real flight.

mixed reality

A First-Principles Study of the Structural and Thermo-Mechanical Properties of Tungsten-Based Plasma-Facing Materials

Tungsten (W) and tungsten alloys are being considered as leading candidates for structural and functional materials in future fusion energy devices. The most attractive properties of tungsten for the design of magnetic and inertial fusion energy reactors are its high melting point, high thermal conductivity, low sputtering yield, and low long-term disposal radioactive footprint. Despite these relevant features, there is a lack of understanding of how the structural and mechanical properties of W-based alloys are affected by the temperature in fusion power plants. In this work, we present a study on the thermo-mechanical properties of five W-based plasma-facing materials. First-principles density functional theory (DFT) calculations are combined with the quasi-harmonic approximation (QHA) theory to investigate the electronic, structural, mechanical, and thermal properties of these W-based alloys as a function of temperature. The coefficient of thermal expansion, temperature-dependent elastic constants, and several elastic parameters, including bulk and Young’s modulus, are calculated. Our work advances the understanding of the structural and thermo-mechanical behavior of W-based materials, thus providing insights into the design and selection of candidate plasma-facing materials in fusion energy devices.

42 ENGINEERING

Developments in Fibrous Refractory Composite Insulation

The development of a new insulation material for heat-shielding advanced reusable entry vehicles is reported. The material, called fibrous refractory composite insulation, is a composite of two ceramic fibers with no additional additives to bond the fibers together; it also includes silicon carbide, an emmittance agent, to improve its optical properties at high temperature. One fiber is a drawn 11-micron-diameter aluminoborosilicate fiber, the other fiber is the silica fiber (microquartz) used in producing silica RSI (reusable surface insulation for the Space Shuttle), which is a blown fiber of 1-3 micron diameter and variable length. A composition containing 20%, with a thermal shock resistance of 1.8 that of all silica insulation, has been successfully produced in a pilot plant.

D B Leiser

Robustness of inertial fusion energy relevant implosions to low-mode asymmetries

Inertial confinement fusion implosions for power production need to be robust. Degradation sources need to be understood and considered for an economic power plant. In this work, the impact of low-mode asymmetries on yield is studied using 2D radiation hydrodynamics simulations for inertial fusion energy relevant implosions. First, a high-gain indirectly driven capsule design is developed. This design is subsequently degraded with low-mode drive asymmetries. The results show that yield is constant with increasing amounts of asymmetry until a cliff is reached where the yield quickly drops below ignition. Robustness arises because the degraded hotspot still has enough time to get to ignition before capsule decompression. This robustness occurs even though the asymmetry couples less energy to the hotspot and causes decompression to occur sooner. The robustness is linked to the generalized Lawson parameter, χ⁠. The value of χ steadily decreases with increasing asymmetry. Once χ is close to one, the hotspot is no longer able to ignite before the capsule decompresses. A simple piston model is used to predict where the robustness cliff is for any design. The trade-off between yield and robustness is also demonstrated.

Physics - Plasma physics

Piloting Vertical Flight Aircraft: A Conference on Flying Qualities and Human Factors

This document contains papers from a specialists' meeting entitled "Piloting Vertical Flight Aircraft. A Conference on Flying Qualities and Human Factors." The conference was co-sponsored by the American Helicopter Society--San Francisco Bay Chapter, and the NASA Ames Research Center. It was held January 20-22, 1993 at the Sheraton Hotel Fisherman's Wharf, San Francisco, California. Vertical flight aircraft, including helicopters and a variety of Vertical Takeoff and Landing (VTOL) concepts, place unique requirements on human perception, control, and performance for the conduct of their design missions. The intent of this conference was to examine, for these vehicles, advances in: (1) design of flight control systems for ADS-33C standards; (2) assessment of human factors influences of cockpit displays and operational procedures; (3) development of VTOL design and operational criteria; and (4) development of theoretical methods or models for predicting pilot-vehicle performance and mission suitability. Recognizing that human capabilities and limitations form an integral aspect of the operations for these classes of vehicles, a secondary goal of the conference was to provide an initial venue for enhanced interaction between human factors and handling qualities specialists.

Helicopter

Justification that the Thermo-Fisher Scientific 241 Am Residues Were Generated by Atomic Energy Defense Activities

The Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (LWA) as amended by the National Defense Authorization Act for Fiscal Year 1997 (1) requires that for Transuranic (TRU) waste to be eligible for disposal at WIPP, it must have been generated by atomic energy defense activities. The definition of “atomic energy defense activity” is defined in the Nuclear Waste Policy Act of 1982 (NWPA) (2).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W

RG-CAT: Detection pipeline and catalogue of radio galaxies in the EMU pilot survey

Abstract We present source detection and catalogue construction pipelines to build the first catalogue of radio galaxies from the 270$\rm deg^2$pilot survey of the Evolutionary Map of the Universe (EMU-PS) conducted with the Australian Square Kilometre Array Pathfinder (ASKAP) telescope. The detection pipeline uses Gal-DINO computer vision networks (Gupta et al. 2024, PASA, 41, e001) to predict the categories of radio morphology and bounding boxes for radio sources, as well as their potential infrared host positions. The Gal-DINO network is trained and evaluated on approximately 5 000 visually inspected radio galaxies and their infrared hosts, encompassing both compact and extended radio morphologies. We find that the Intersection over Union (IoU) for the predicted and ground-truth bounding boxes is larger than 0.5 for 99% of the radio sources, and 98% of predicted host positions are within$3^{\prime \prime}$of the ground-truth infrared host in the evaluation set. The catalogue construction pipeline uses the predictions of the trained network on the radio and infrared image cutouts based on the catalogue of radio components identified using theSelavysource finder algorithm. Confidence scores of the predictions are then used to prioritiseSelavycomponents with higher scores and incorporate them first into the catalogue. This results in identifications for a total of 211 625 radio sources, with 201 211 classified as compact and unresolved. The remaining 10 414 are categorised as extended radio morphologies, including 582 FR-I, 5 602 FR-II, 1 494 FR-x (uncertain whether FR-I or FR-II), 2 375 R (single-peak resolved) radio galaxies, and 361 with peculiar and other rare morphologies. Each source in the catalogue includes a confidence score. We cross-match the radio sources in the catalogue with the infrared and optical catalogues, finding infrared cross-matches for 73% and photometric redshifts for 36% of the radio galaxies. The EMU-PS catalogue and the detection pipelines presented here will be used towards constructing catalogues for the main EMU survey covering the full southern sky.

Astronomy & Astrophysics

Process control-enabled mitigation of microstructural and plastic heterogeneities in additively manufactured Grade 91 steel

Synergizing wire arc-directed energy deposition (WA-DED) additive manufacturing (AM) with particle-strengthened creep strength-enhanced ferritic (CSEF) steels enables fabrication and repair of critical power-plant components. Investigations focused on fusion-welded particle-strengthened CSEF steels, such as Grade 91 steel, have linked microstructurally heterogeneous regions—forming due to heat affected zones (HAZ)—with premature failure during elevated temperature service. Fusion-based AM, including WA-DED, likewise generates microstructurally and plastically heterogeneous regions due to spatiotemporally varying thermokinetics during deposition. However, works investigating such microstructural heterogeneities, their implications for mechanical behavior, and strategies to mitigate their formation remain scarce. This work identifies microstructurally and plastically heterogeneous regions within the WA-DED-processed Grade 91 steel. Spatial microhardness variations in the as-fabricated specimen correlate with the variation in the attributes of grain, martensitic microstructure, and precipitates across the fusion zone and HAZ. Digital image correlation-enabled tensile tests performed at 500 °C revealed pronounced deformation localization and a wave-like strain distribution, with wavelength close to the melt pool depth, indicating susceptibility of the as-fabricated components to premature creep failure. Such heterogeneity in microstructural and mechanical behavior was attributed to recurring solid-state phase transformations. Subsequently, an interlayer temperature control strategy was implemented, wherein maintaining interlayer temperature above the martensitic start temperature mitigated the heterogeneous microstructural and plastic response in the as-fabricated condition. Findings open pathways to achieving deformation-localization- and creep-resistant microstructures in WA-DED fabricated particle-strengthened CSEF steel components, reducing reliance on post-welding heat treatments—conventionally required to enhance creep resistance—and enabling on-demand, short lead-time fabrication of next-generation power-plant components.

Heat affected zones