Search NASA⌕ Search

SEARCH · Search NASA

Results for “fusion plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Primary Heat Transport System Design Considerations for Xcimer Energy’s Athena Fusion Pilot Plant

Fusion energy promises a reliable, carbon-free source of power; however, significant challenges remain before it can be deployed as an economical energy source. In addition to achieving fusion conditions, power plants must operate under extreme temperatures, radiation, and mechanical loads while maintaining high efficiency and availability. These requirements place strong demands on engineering design and plant operation. This work focuses on the engineering challenges associated with balance of plant analysis for inertial fusion energy systems. In particular, this paper examines the design considerations for primary heat transfer systems in fusion pilot plants employing molten fluoride salt coolants, with particular emphasis on system layout optimization and the balance between competing design objectives using the Xcimer Energy Athena inertial pilot plant design as a case study. Through systematic analysis of candidate system configurations and parametric sensitivity studies, we identify key engineering trade-offs governing salt inventory, pumping power requirements, and operational flexibility. The analysis employs system-level modeling tools to explore the design space and establish relationships between geometric parameters and system performance metrics.

Greenwood, Scott [ORNL] (ORCID:0000000333480736)↗

Estimation Methodology to Evaluate Hypothetical Downwind Impacts from Fusion Plants

The continuing move toward establishing fusion systems for power generation and the associated research to that end is prompting examination of the potential health and safety impacts of such plants to the environment and human health. As many fusion facilities will have tritium inventories on site as part of the fusion fuel, evaluating the potential for downwind impacts from fusion facilities or power plants resulting from accident or routine emissions is a general requirement for assessing location and impacts to workers and the public. As part of siting considerations and permitting, the fusion facilities would be evaluated for potential for downwind concentration and dose impacts. For accident assessment scenarios, the downwind impacts are usually modeled as an instantaneous (or near-instantaneous) release of material transported following the wind. A range of meteorological conditions are usually assessed to determine a bounding case which results in a dose exceeding a specified threshold (e.g., 95 th or 99 th percentile; DOE 2015). This report provides initial estimates of the downwind dose impacts from a potential tritium release at a fusion power plant-relevant facility and identifies potential distances required to limit impacts to nearby population. This effort is meant to provide a bounding analysis and theoretical understanding of impacts of tritium releases for facilities subject to various environmental and atmospheric conditions. Using a Gaussian dispersion model to simulate a brief plume, downwind concentration and dose is projected for tritium oxide. Releases are assumed to consist entirely of tritium oxide due to the increased dose impacts from the oxide form relative to the elemental form of tritium. We also briefly identify how climatological conditions could potentially be used to support risk profile determination.

54 ENVIRONMENTAL SCIENCES↗

Valuing Maintenance Strategies for Fusion Plants as Part of a Future Electricity Grid

Scheduled maintenance is likely to be lengthy and therefore consequential for the economics of fusion power plants. The maintenance strategy that maximizes the economic value of a plant depends on internal factors such as the cost and durability of the replaceable components, the frequency and duration of the maintenance blocks, and the external factors of the electricity system in which the plant operates. Here, this paper examines the value of fusion power plants with various maintenance properties in a decarbonized United States Eastern Interconnection circa 2050. Seasonal variations in electricity supply and demand mean that certain times of year, particularly spring to early summer, are best for scheduled maintenance. Seasonality has two important consequences. First, the value of a plant can be 15% higher than what one would naively expect if value were directly proportional to its availability. Second, in some cases, replacing fractions of a component in shorter maintenance blocks spread over multiple years is better than replacing it all at once during a longer outage, even through the overall availability of the plant is lower in the former scenario.

power plant, maintenance, seasonality, electricity↗

Comparison of Fuel Cycles for Lead-Lithium and Pure Lithium Liquid Metal Walls in a Magnetized Target Fusion Power Plant

General Fusion (GF) is developing an adaptable, commercial fusion power plant based on magnetized target fusion (MTF). The GF approach involves forming a spherical torus of deuterium-tritium plasma in a large (~4 m diameter) cavity formed in liquid metal, and then collapsing that cavity with an array of pneumatic piston drivers. The liquid metal is constantly flowing through the fusion chamber and out to processing systems where tritium and heat will be extracted using tritium extraction technologies and heat exchangers, respectively. Here, this study focuses on two candidate designs for the liquid metal blanket and first wall material for the General Fusion Magnetized Target Fusion (GF MTF) power plant and assesses their impact on the tritium fuel cycle. The first candidate is the lead lithium eutectic (LLE) and the second candidate is pure lithium (Li). It was found that the main differences between LLE and Li designs are the extraction technologies required to remove tritium from the blanket and the amount of tritium and its distribution within the facility. More than 80% of the in-process tritium inventory for the LLE design is contained in the isotope separation system, while for the Li design, over 60% of the in-process tritium inventory is contained within the blanket material. This is due to significant tritium retention by Li. For the Li blanket, the burden of tritium processing rests on the blanket extraction technology rather than the traditional exhaust processing route. Thus, the blanket extraction technology is a main driver of tritium inventory in the Li system and determines the subsequent interface with the tritium processing plant.

General Fusion↗

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Maintenance strategy, structural design, and site layout of the ST-E1 fusion power plant

An effective fusion reactor maintenance scheme enables safe operations and short downtimes. This in turn leads to high availability, which is critical to the commercial viability of a power-producing plant. In tokamak-based fusion power plants, the chosen maintenance approach has a significant impact on the spatial design of the tokamak, as well as the surrounding infrastructure, and therefore needs to be considered from the outset. Tokamak Energy has developed a pre-concept design of a fusion power plant, ST-E1. This work describes the major drivers and constraints that have been considered, presents the tokamak architecture and chosen maintenance regime, and discusses how this enables the plant’s two-phased approach to demonstrating commercial operations. It also shows the implications for the design of other systems areas, in particular the machine structural arrangement and bioshield and hot cell layout. The reactor core segmentation and removal scheme replaces entire toroidal segments radially through a large vacuum port, along a single axis only. The result is a change-tolerant machine and plant layout that can accommodate the evolving designs of the tokamak.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Maintainable Fusion Pilot Plant

The US fusion community has coalesced around the goal of building an FPP as described by the National Academies of Science, Engineering, and Medicine (NASEM). In addition to demonstrating the viability of the technologies necessary to operate such a plant, including demonstration of net energy and electricity production, NASEM found that a “fusion pilot plant will need to demonstrate the ability to efficiently perform remote maintenance and replacement in support of the design of a power plant, taking into account details of the consequences of the fusion environment, such as material activation and tritium retention in components.” Current designs of fusion demonstration reactors do usually foresee a regular exchange of their first wall modules, including the tritium breeding blankets. In the European Power Plant Conceptual Studies, it is assumed that a fusion reactor will need to change its divertor every 2 years and its first wall blanket module every 5 to 6 years to reach acceptable availability. Underlying this capability are remote-handling technologies to keep the outage for the exchange of these components short. There are many uncertainties in the remote-handling schemes, and most schemes are at a preconceptual level at best. In addition, the exchange of these components would either produce an enormous rad-waste stream or would require an enormous refurbishment activity with huge cost-prohibitive hot-cells. Past Fusion Nuclear Science Facility (FNSF) preconceptual studies have led to hot cell dimensions of an unbelievable size, likely costing tens of billions of dollars. Already at The Way (previously International Thermonuclear Experimental Reactor, ITER), hot-cells have become cost-prohibitive, demanding redesigns of the ITER first wall to reduce the toxic rad-waste/inventory. In this in-situ PFC repair project, a concept for a long-life, maintainable first wall module concept is developed and tested. This first wall concept relies on innovative remote handling to repair the first wall modules in-situ, avoiding costly refurbishments outside of the tokamak vessel. This approach was highlighted in the Fusion Energy Sciences Advisory Committee (FESAC) report on Transformative Enabling Capabilities for Efficient Advance Toward Fusion Energy. In general, the damage of the first wall armor is due to particle and radiation exposures. Load conditions vary from one fusion reactor design to another. In tokamaks, first wall Plasma Facing Components (PFCs) are exposed to far-Scrape-Off-Layer plasma fluxes, electromagnetic radiation, energetic CX neutrals, and potentially runaway electron beams. Protecting the first wall to the worst-case load conditions would require the design of a very thick first wall armor. Transient heat and particle fluxes due to disruptions or edge localized modes can lead to excessive heat loads resulting potentially in melting PFCs down to the cooling channel. Catastrophic events like these need to be avoided by appropriate disruption mitigation systems. However, failure of these systems will still put a first wall at an unacceptable risk. Hence, a first wall design needs to accommodate the occasional transient heat loads by introducing sacrificial limiters, which will absorb these transients.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Approach to startup inventory for viable commercial fusion power plant

With the increasing efforts to commercialize fusion power, private and government organizations are investing heavily in the development of technology to support a viable fusion power plant. Deuterium-Tritium (DT) fueled reactors are more prevalent than other proposed designs, requiring tritium processing and handling technology for safe operations and self-sufficiency. Further, each fusion power plant will need a specific-to-design startup inventory of tritium to begin operations. This startup inventory is required prior to breeding and is the minimum tritium inventory required to fill each processing component in the fuel cycle, to offset radioactive decay losses, and to avoid a zero-fuel situation for continuous operation. We present an approach to calculate the startup tritium inventory for a 500 MW th reactor, with considerations for reserve inventory for maintenance and commissioning. A baseline startup inventory was calculated to be approximately 327 gs. This value was obtained using modest assumptions about the technology and operating parameters of a fusion power plant. The required operating reserve inventory or the inventory necessary to keep a fusion power plant operational using only direct internal recycling for 24 h for the same plant design is approximately 642 gs. The approach and findings of this paper will enable fusion energy stakeholders to better utilize the existing scarce global tritium supply.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Power and particle exhaust for the ARC fusion power plant

To successfully show that fusion is an attractive energy source, the ARCTM fusion power plant will need to operate with a robust, integrated power and particle exhaust solution. To maximise ARC’s fusion power output while avoiding excessive erosion of the plasma-facing components, we will need to radiatively dissipate most of the power crossing the last-closed flux surface, injecting radiating impurities such as argon or neon to access divertor detachment. Divertor detachment will need to be integrated with a high-performance core plasma, and with efficient impurity pumping to prevent the accumulation of helium ash in the core. To access and control detachment in high-performance plasmas, we have designed ARC with up–down-symmetric divertors, with secondary X-points in long, tightly baffled outer legs. Using a core-edge modelling workflow, we predict that with this divertor design, ARC will access detachment with modest argon seeding in the divertor (c Ar,div ∼0.9%), which should have minimal impact on the core ( Z eff,core <0.5) for reasonable argon enrichment (c Ar,div /c Ar,core =6). Due to the high predicted divertor neutral pressure (p div ∼20 Pa), we predict that ARC will sufficiently pump helium to limit ash accumulation in the core (c He,core <2%) for a helium enrichment of c He,div /c He,core =0.4. ARC’s divertor design is expected to increase the stability of a detachment front in the outer divertor leg, helping to prevent divertor reattachment during smaller heat-flux transients such as scrape-off-layer filaments associated with the quasi-continuous exhaust regime. However, this buffering will not be sufficient to prevent divertor reattachment during large type-I edge-localised modes (ELMs), and as such these will need to be avoided on ARC. Experiments on SPARC will be used to select an integrated scenario which avoids or mitigates type-I-ELMs while maintaining access to detachment, good core fusion performance and sufficient impurity exhaust. SPARC experiments will also be used to finalise ARC’s divertor design, by studying the impact of magnetic and first-wall geometry on detachment stability, impurity enrichment and neutral baffling under conditions similar to those expected for ARC. In conclusion, our analysis finds that ARC will have a viable power and particle exhaust solution which is compatible with high-power operations, and this solution will be validated in experiments on SPARC.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up↗

The spherical tokamak advanced reactor (STAR) fusion power plant design

Scientific and technical advancements have been made that improve fusion’s prospects to provide a new energy source, showing enhanced plasma confinement conditions with plasma temperatures reaching or exceeding 100 million degrees. Overshadowing this progress is the challenge involved in developing an economically viable fusion power plant design. Many proposed next-step DEMO and pilot plant designs are extensions of existing physics-focused experimental devices defined to understand and control plasma operations to achieve and sustain a fusion reaction. Transitioning scientific and technical advancements into a functional power plant requires a dedicated focus on architectural designs that integrate diverse technologies, while optimizing physics conditions, with a focus on economic viability. This holistic approach is essential in turning the promise of fusion energy into a reality. The Spherical Tokamak Advanced Reactor (STAR) is a fusion power plant conceptual design with the architectural focus that strives to balance physics, engineering, and cost considerations. In conclusion, it has been set up to introduce relevant physics, engineering and concept features that an intermediate pilot plant might follow, with the goal of meeting system performances and economic requirements that lead to a commercially competitive fusion power plant.

Blanket segmentation↗

Plasma confinement state classification in fusion power plants: Profile reflectometer and ensemble diagnostics

As Fusion Pilot Plants (FPPs) are increasingly viewed as within reach, many engineering challenges remain. Not many diagnostics are expected to be available in a reactor environment. Survivability, maintainability, and limited port space substantially restrict the number of FPP-relevant diagnostics. One remaining challenge is developing tools and devices to extract plasma state information necessary for controlling an FPP from a limited subset of diagnostics. This work is part of an overarching project to address this challenge. The specific diagnostic subset to be used in FPPs is still under debate. We take the approach of developing machine-learning-based tools for different significant plasma state parameters, using already known FPP-viable diagnostics. Previously we developed a plasma confinement mode classifier utilizing the Electron Cyclotron Emission (ECE) diagnostic. Here, we expand on this by developing a Profile Reflectometer (PR) based classifier with 97% test accuracy, and an ensemble model that combines the ECE and PR models into a single model, achieving 99% test accuracy.

Clark, Randall [Univ. of California, San Diego, CA↗

Impact of trapping on tritium self-sufficiency and tritium inventories in fusion power plant fuel cycles

The dynamic analysis of fusion power plant (FPP) fuel cycles highlights the challenge of achieving tritium self-sufficiency in future FPPs. While state-of-the-art fuel cycle models offer valuable insights into the necessary design parameters for attaining tritium self-sufficiency, none of these models currently consider the impact of tritium trapping within fuel cycle components. However, detailed analysis of individual components reveals that substantial amounts of tritium can be trapped within the first wall, divertors, and breeding blanket systems, suggesting that tritium trapping may significantly influence the FPP ability to achieve self-sufficiency. The compounded effects of additional tritium traps generated by irradiation effects and component replacements further exacerbate this challenge. The novelty of this work is the integration of an explicit, physics-based model for tritium trapping, evolution of damage-induced traps, and component replacements into a dynamic, system-level model of a fuel cycle. The results show an increase of a factor 10 3 – 10 4 of tritium inventory in the first wall and vacuum vessel of an ARC-class FPP when accounting for the aforementioned phenomena. This, coupled with the replacement of components subject to significant tritium trapping, slows down fuel cycle dynamics, resulting in an extended tritium doubling time (50% increase), higher start-up inventory (30% increase), and higher required tritium breeding ratio (2%–5%) compared to a scenario without tritium trapping.

fuel cycle↗

The high-field tokamak physics basis for the ARC fusion power plant

This editorial summarizes the physics basis underlying the ARC high-field tokamak fusion power plant, including recent advances in tokamak plasma understanding, the role of the SPARC device, and key remaining physics questions. It describes how these results guide the ARC Version 3A design and outlines opportunities for the broader fusion community to contribute to the development of first-generation fusion power plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Disruption modelling for engineering and physics design of ST-E1 fusion power plant

Plasma disruptions represent a critical challenge for high-performance tokamak operations, as they can compromise machine integrity and reduce operational availability. Although future fusion devices essentially need to incorporate strategies to minimise disruption occurrence, complete avoidance remains unattainable. Consequently, assessing and characterising unmitigated disruption consequences is fundamental for the design and qualification of next-generation fusion power plants. This work supports the pre-conceptual design of ST-E1, a low aspect-ratio Tokamak Fusion Power Plant developed by Tokamak Energy Ltd., by presenting a comprehensive disruption modelling approach applied across different design stages. The methodology integrates both physics and engineering considerations to evaluate the impact of disruptions on machine performance and structural integrity. From an engineering perspective, several ST-E1 layout options were analysed to investigate the electromagnetic response of key components under disruption-induced loads, enabling comparison between alternative design solutions. On the physics side, a broad set of disruption scenarios was explored, scanning operational space parameters, plasma-material interactions, and associated thermal loads. Furthermore, the study examined variations in disruption behaviour arising from different reference equilibria, focusing on a range starting from Double Null to Single Null configurations, reflecting the increasing up-down asymmetry consequences. The results reveal significant contrasts in plasma dynamics and structures electromagnetic behaviour between configurations, highlighting the importance of disruption modelling in guiding design choices. These analyses have proven instrumental in shaping ST-E1 development, offering critical insights for mitigating risks and optimising future fusion power plant designs.

Borowiec, Katarzyna [ORNL] (ORCID:0000000335911739↗

Modeling and analysis of the tritium fuel cycle for ARC- and STEP-class D-T fusion power plants

Abstract The limited tritium resources available for the first fusion power plants (FPPs) make fuel self-sufficiency and tritium inventory minimization leading issues in FPP design. This work builds on the model proposed by Abdou et al (2020 Nucl. Fusion 61 013001), which analyzed the fuel cycle (FC) of a DEMOnstration nuclear FPP-class FPP with a time-dependent system-level model. Here, we use a modified version of their model to analyze the FC of an Affordable, Robust, Compact (ARC)-class tokamak and two versions of a Spherical Tokamak for Energy Production (STEP)-class tokamak. The ARC-class tokamak breeds tritium in a 2LiF + BeF 2 liquid immersion blanket, while the STEP-class tokamak breeds tritium utilizing either a liquid-lithium blanket design or an encapsulated breeding blanket. A time-dependent system-level model is developed in Matlab Simulink ® to simulate the evolution of tritium flows and tritium inventories in the FC. The main goals of this work are to assess tritium self-sufficiency of the ARC- and STEP-class designs and to determine quantitative design requirements that can be used to analyze the adequacy of a proposed FC system. These design requirements are aimed at achieving a low tritium inventory doubling time ( t d ) and a low start-up inventory ( I s t a r t u p ) while keeping the required tritium breeding ratio (TBR r ) as low as possible. We also consider how improvements in FC technology and POs affect TBR r and I s t a r t u p . The model results show that TBR r for ARC- and STEP-class FPPs should be achievable if the tritium burn efficiency (TBE) reaches 0.5%–1% (TBR r < 1.2). This assumes significant, but attainable, improvements over current abilities. However, the model results indicate that an FPP must achieve ambitious performance targets, including FPP availability > 70%, tritium processing time < 4 h, and the implementation of direct internal recycling (DIR). If future research yields major improvements to achievable TBE, it may be possible to achieve tritium self-sufficiency while operating at lower availability and without implementing DIR.

Physics↗