Search NASA⌕ Search

SEARCH · Search NASA

Results for “gateway deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Nuclear Science User Facilities High Performance Computing: Provide a Science Gateway for HPC Users

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities (NSUF), provides direct access to the Barracuda Virtual Reactor and 18 Multiphysics Object-Oriented Simulation Environment (MOOSE) applications via a web-based science gateway developed using Open Ondemand on the INL high performance computing (HPC) systems. This gateway features the computational tools of the Nuclear Computational Resource Center (NCRC) and the computing resources of the INL high performance computing systems. These computational tools are a key foundation of collaboration and innovation in nuclear energy systems research. High performance computing resources and INL staff directly support the mission and objectives of DOE-NE. The Barracuda Virtual Reactor was the first science gateway deployed in Jan 2021 to support NSUF users. In July 2021, the science gateway was expanded to support access to NCRC codes for use across all supported INL HPC systems. The HPC science gateway currently supports 20 total applications. The gateway also includes access to training resources specific to NCRC tools.

99 GENERAL AND MISCELLANEOUS↗

Gateway Small Satellite Deployment Approval Guidelines

The issue of small payloads released from Gateway may become a concern for the space users' community. Man-made objects can stay in the same or crossing orbit for a long time, creating significant hazard for Gateway, other users and sites on the surface of the Moon. It is important to coordinate efforts between organizations and agencies to ensure that Gateway operates safely.

Evgeny V. Menkin↗

Guidelines on Deploying Small Satellites from Gateway

The issue of small payloads released from Gateway may become a concern for the space users' community. Man-made objects can stay in the same or crossing orbit for a long time, creating significant hazard for Gateway, other users and sites on the surface of the Moon. It is important to coordinate efforts between organizations and agencies to ensure that Gateway operates safely. The purpose of this paper is to outline the Gateway Program approach for evaluating the deployment of candidate research payloads from Gateway Modules and/or Visiting Vehicles (VV) docked to the Gateway or vehicles/modules on the route to/from the Gateway.

Evgeny Victor Menkin↗

International Clean Energy Analysis Gateway: Assisting Developing Countries with Clean Energy Deployment (Fact Sheet)

The International Clean Energy Analysis Gateway seeks to enhance developing country access to energy efficiency and renewable energy analysis tools, databases, methods, and other technical resources in a dynamic user interaction environment. In addition to providing information on available tools, the gateway also is a platform for Web seminars, online training, peer networks, and expert assistance. The gateway is sponsored by the U.S. Department of Energy (DOE) and the United Nations Industrial Development Organization (UNIDO) and managed by the National Renewable Energy Laboratory (NREL). Further cooperation is desired with organizations that can help expand the information presented in the portal and assist with outreach and training.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Appendix K - GPRA06 Weatherization and Intergovernmental Program (WIP) Documentation

The State Energy Program provides financial assistance to States, enabling State governments to target their own high priority energy needs and expand clean energy choices for their citizens and businesses. With these funds and the resources leveraged by them, the State and Territory Energy Offices develop and manage a variety of programs designed to increase energy efficiency, reduce energy use and costs, develop alternative energy and renewable energy sources, promote environmentally conscious economic development and reduce reliance on oil produced outside of the United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Maneuverable Automated Tethered Space Tug Simulator

This TIP will develop autonomous capabilities for the space tugs in the Flat Floor Robotics Laboratory (FFRL) for use in support of In-Space Servicing, Assembly, and Manufacturing (ISAM) and future vehicles in the FFRL. The space tugs would be housed on larger spacecraft, such as ISS or Gateway, and deployed for various ISAM activities. When these activities are complete, the space tug can be reeled back to its host spacecraft.

Flat Floor Robotics Lab↗

Cubesat Deployment from a Near Rectilinear Halo Orbit

Satellites deployed from the Gateway in a Near Rectilinear Halo Orbit (NRHO) must be safely delivered their desired destinations in cislunar space and beyond. The presence of simultaneously significant gravitational forces from the Moon, the Earth, and the Sun, along with the absence of atmospheric drag, complicates the mission design problem for cubesats deployed from the Gateway. The current investigation defines candidate green zones for safe satellite deployment, allowing a passive departing spacecraft to avoid recontact with the Gateway as it departs the NRHO vicinity.

NRHO↗

Jettison and Disposal From Near Rectilinear Halo Orbits, Part 2: Applications

Objects deployed from a Near Rectilinear Halo Orbit (NRHO) experience simultaneous gravitational forces from the Moon, the Earth, and the Sun, and post-deployment behavior is complex. The current investigation applies the theories explored in Part 1 of the study to examine the dynamics of objects deployed from the Gateway NRHO to heliocentric space. Examples include jettison of cubesats and logistics modules as well as end-of-life options for the Gateway itself. Recontact risk with the Gateway as each object departs the lunar vicinity is explored, and both the immediate destination and the long-term fate of the deployed objects are assessed.

Diane C. Davis↗

Quantifying the Impact of Advanced Web Platforms on High Performance Computing Usage

The deployment of Science Gateways for High Performance Computing (HPC) systems can alter long-accepted usage patterns on supercomputing systems in positive ways as an ever-increasing number of users migrate their workflows to HPC systems. Idaho National Laboratory (INL) has deployed two separate advanced web platforms, Open OnDemand and NICE DCV, for integration with HPC resources to improve web accessibility for HPC users. Researchers conducted a multi-year study on how HPC usage pat- terns changed in the presence of these platforms. This work reports the results of that study and quantifies the observed impacts, including adoption by visualization and Jupyter Notebook/Lab users, decreased job submission friction, rapid uptake of HPC by Windows users, and increased overall system utilization. The most significant impacts were observed from the deployment of Open OnDemand, and this work also identifies some best practices for Open OnDemand deployment for HPC datacenters.

97 MATHEMATICS AND COMPUTING↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Commercialization of the Transportation-Security, Tracking, and Reporting System (T-STAR)

The Transportation-Security, Tracking, and Reporting System (T-STAR) was developed by the National Nuclear Security Administration, NA-21, Office of Radiological Security (ORS) to provide a transportation security system for detection and tracking during transport of Category 1 and Category 2 radiological material. Few off-the-shelf systems for conveyance tracking offer detection of a cargo compartment breach or a removal of the cargo. Systems that do offer this capability often require permanent installation through modifying of the conveyance itself. This is not sustainable in many countries where ORS is building use, storage, and transport security capacity. The development of T-STAR has moved from fielding robust prototypes deployed in countries ranging from North America, Latin America and Central Asia to a commercially produced product that can now be deployed to provide enhanced security during transit. Each prototype deployment resulted in important lessons learned, which informed the requirements for the final commercial product. T-STAR uses both cellular and Iridium satellite modems to provide redundant communications to provide the configuration, status, and alerts to a server monitoring the shipment, which is accessible using a multilanguage browser-based user interface. A wireless security system employing using Z-wave sensors for intrusion detection located in the conveyance provide low cost but effective solution for a wide range of conveyance types. Additional capabilities include the ability to monitor a vehicles’ CANBUS (Controller Area Network) system, an ethernet port for high throughput sensor information such as video cameras, and the ability to power and use advanced external sensor payloads. These features make the T-STAR a capable and expandable security gateway that can be deployed on a variety of conveyances from box trucks to open trailers. The ability to provide tracking, monitoring, and detection provide a key component in overall best practices designed to protect shipments of radioactive material.

Schultze, Michael [ORNL] (ORCID:0000000283205671)↗

Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

The U.S. Department of Energy is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr to a much larger figure nationally. Most of the energy savings in this application is attributable to the instant-restrike capability of LED products and to their high tolerance for frequent on/off switching, used here to separately control either end of the tunnel during daytime hours. Some LED luminaires rival or outperform their high-intensity discharge (HID) counterparts in terms of efficacy, but options are limited, and smaller lumen packages preclude true one-for-one equivalence. However, LED products continue to improve in efficacy and affordability at a rate unmatched by other light source technologies; the estimated simple payback period of 20 years (excluding installation costs and maintenance savings) can be expected to improve with time. The proposed revisions to the existing high-pressure sodium (HPS) lighting system would require slightly increased controls complexity and significantly increased luminaire types and quantities. In exchange, substantial annual savings (from reduced maintenance and energy use) would be complemented by improved quantity and quality of illumination. Although advanced lighting controls could offer additional savings, it is unclear whether such a system would prove cost-effective; this topic may be explored in future work.

Baker-Barry Tunnel↗

Baker-Barry Tunnel Lighting: Evaluation of a Potential GATEWAY Demonstrations Project

The U.S. Department of Energy is evaluating the Baker-Barry Tunnel as a potential GATEWAY Demonstrations project for deployment of solid-state lighting (SSL) technology. The National Park Service views this project as a possible proving ground and template for implementation of light-emitting diode (LED) luminaires in other tunnels, thereby expanding the estimated 40% energy savings from 132 MWh/yr to a much larger figure nationally. Most of the energy savings in this application is attributable to the instant-restrike capability of LED products and to their high tolerance for frequent on/off switching, used here to separately control either end of the tunnel during daytime hours. Some LED luminaires rival or outperform their high-intensity discharge (HID) counterparts in terms of efficacy, but options are limited, and smaller lumen packages preclude true one-for-one equivalence. However, LED products continue to improve in efficacy and affordability at a rate unmatched by other light source technologies; the estimated simple payback period of eight years (excluding installation costs and maintenance savings) can be expected to improve with time. The proposed revisions to the existing high-pressure sodium (HPS) lighting system would require slightly increased controls complexity and significantly increased luminaire types and quantities. In exchange, substantial annual savings (from reduced maintenance and energy use) would be complemented by improved quantity and quality of illumination. Although advanced lighting controls could offer additional savings, it is unclear whether such a system would prove cost-effective; this topic may be explored in future work.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Heritage BioSensor for Lunar Biology Experiments

Introduction: Automated biological experiments on small spacecraft missions have gained prominence over the past decade due to their simplicity, accessibility, and small mass, volume, and power needs. Most recently, the BioSensor microfluidic CubeSat payload aboard BioSentinel used an automated microfluidic cell culture system to study the effects of environmental stressors like deep space radiation and microgravity on yeast growth and metabolism. BioSentinel’s successor, the Lunar Explorer Instrument for space biology Applications (LEIA), will study the effects of lunar gravity and radiation using an improved version of the BioSensor microfluidic platform. The BioSensor payload has great adaptability to host a diverse range of biological experiments with single- and multi-celled organisms in both crewed and uncrewed missions, making it a compelling candidate for future space biology studies in a lunar surface environment. BioSensor Instrumentation on BioSentinel: The first spaceflight mission with the BioSensor, BioSentinel’s biology experiments occurred at three locations -- deep space, ISS and ground. The payload contained 18 microfluidic cards, each featuring 16 growth wells (a total of 288 growth wells). Each well was loaded before launch with desiccated yeast. In space, liquid culture medium (nutrients) was automatically introduced to batches of wells at a time to initiate a series of biology experiments. Temperature was maintained by thin film heaters on both sides of each card. Each well was equipped with three LEDs emitting at 570 nm, 630 nm, and 850 nm, paired with photodetectors to measure cell concentration and the alamarBlue (metabolic indicator dye) color transition from blue to pink. Phenotypic parameters like cell viability, metabolic rate, and generation time can be derived from these measurements. The sequence and timing of fluid fills, optical measurements, and thermal control were stored onboard, but could be updated asynchronously via ground communication. LEIA: LEIA is slated for launch no earlier than 2026 on a CLPS lander. BioSentinel’s BioSensor has been modified for use in LEIA. These improvements include: (a) storage for multiple culture medium types, (b) additional LED color (465 nm) for a new biological assay for antioxidant (carotenoid) production, (c) housing modifications for later biology load before launch, (d) improved isolation between electronic and fluidic components, and (e) improved humidity control for prolonged organism viability in case of post-load launch delay. Future Prospects: The consistent and successful demonstration of complex fluidics platforms alongside reliable instrument operations in a space environment is poised to create strong momentum for BioSensor-based biological experiment payloads. Planned future developments with the BioSensor include extending compatibility to a broader range of organisms and assays. Preliminary work has already demonstrated successful growth of Arabidopsis seedlings in fluidic cards. With a few modifications to the optical assembly, the setup could easily measure photosynthetic traits in plants and cyanobacteria. The addition of fluorescence measurements and generation of novel luminescent assays will elevate BioSensor’s functionality further. Beyond the BioSensor’s potential uses on free-flyer missions, ISS and Gateway, and CLPS landers, deploying the BioSensor to the lunar surface or in an artificial habitat on crewed missions could enable pioneering research on both how life responds to lunar conditions and future bioproduction capabilities making the BioSensor an indispensable tool for future space biology research.

Chinmayee Govinda Raj↗

Development of a Regional Roadmap for Source Network and Storage Deployment for CarbonSAFE Illinois - Macon County (Task 10)

Research documented in this report includes (1) resource estimates for the Lower Mt. Simon Sandstone in the Illinois Basin, including storage and cost estimates, and (2) regional roadmaps for carbon capture and storage (CCS) deployment using five capture facilities throughout the Illinois Basin: Archer Daniels Midland Decatur (ADM Decatur), Abbott Power Plant, City Water, Light, and Power (CWLP), One Earth Energy, and Prairie State Energy Campus (PSEC). Resource estimates were developed using the Sequestration of CO 2 Tool (SCO2T) and data provided by the Illinois State Geological Survey (ISGS), and regional roadmaps for CCS deployment were developed in SimCCS Gateway, a decision-support tool for designing CCS infrastructure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Comparison of Propulsion Options for Human Exploration of Mars

NASA continues to advance plans to extend human presence beyond low-Earth orbit leading to human exploration of Mars. The plans being laid out follow an incremental path, beginning with initial flight tests followed by deployment of a Deep Space Gateway (DSG) in cislunar space. This Gateway, will serve as the initial transportation node for departing and returning Mars spacecraft. Human exploration of Mars represents the next leap for humankind because it will require leaving Earth on a long mission with very limited return, rescue, or resupply capabilities. Although Mars missions are long, approaches and technologies are desired which can reduce the time that the crew is away from Earth. This paper builds off past analyses of NASA's exploration strategy by providing more detail on the performance of alternative in-space transportation options with an emphasis on reducing total mission duration. Key options discussed include advanced chemical, nuclear thermal, nuclear electric, solar electric, as well as an emerging hybrid propulsion system which utilizes a combination of both solar electric and chemical propulsion.

Drake, Bret G.↗