Search NASA⌕ Search

SEARCH · Search NASA

Results for “gateway deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Gateway Small Satellite Deployment Approval Guidelines

The issue of small payloads released from Gateway may become a concern for the space users' community. Man-made objects can stay in the same or crossing orbit for a long time, creating significant hazard for Gateway, other users and sites on the surface of the Moon. It is important to coordinate efforts between organizations and agencies to ensure that Gateway operates safely.

Evgeny V. Menkin↗

Guidelines on Deploying Small Satellites from Gateway

The issue of small payloads released from Gateway may become a concern for the space users' community. Man-made objects can stay in the same or crossing orbit for a long time, creating significant hazard for Gateway, other users and sites on the surface of the Moon. It is important to coordinate efforts between organizations and agencies to ensure that Gateway operates safely. The purpose of this paper is to outline the Gateway Program approach for evaluating the deployment of candidate research payloads from Gateway Modules and/or Visiting Vehicles (VV) docked to the Gateway or vehicles/modules on the route to/from the Gateway.

Evgeny Victor Menkin↗

Maneuverable Automated Tethered Space Tug Simulator

This TIP will develop autonomous capabilities for the space tugs in the Flat Floor Robotics Laboratory (FFRL) for use in support of In-Space Servicing, Assembly, and Manufacturing (ISAM) and future vehicles in the FFRL. The space tugs would be housed on larger spacecraft, such as ISS or Gateway, and deployed for various ISAM activities. When these activities are complete, the space tug can be reeled back to its host spacecraft.

Flat Floor Robotics Lab↗

Cubesat Deployment from a Near Rectilinear Halo Orbit

Satellites deployed from the Gateway in a Near Rectilinear Halo Orbit (NRHO) must be safely delivered their desired destinations in cislunar space and beyond. The presence of simultaneously significant gravitational forces from the Moon, the Earth, and the Sun, along with the absence of atmospheric drag, complicates the mission design problem for cubesats deployed from the Gateway. The current investigation defines candidate green zones for safe satellite deployment, allowing a passive departing spacecraft to avoid recontact with the Gateway as it departs the NRHO vicinity.

NRHO↗

Jettison and Disposal From Near Rectilinear Halo Orbits, Part 2: Applications

Objects deployed from a Near Rectilinear Halo Orbit (NRHO) experience simultaneous gravitational forces from the Moon, the Earth, and the Sun, and post-deployment behavior is complex. The current investigation applies the theories explored in Part 1 of the study to examine the dynamics of objects deployed from the Gateway NRHO to heliocentric space. Examples include jettison of cubesats and logistics modules as well as end-of-life options for the Gateway itself. Recontact risk with the Gateway as each object departs the lunar vicinity is explored, and both the immediate destination and the long-term fate of the deployed objects are assessed.

Diane C. Davis↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

A Heritage BioSensor for Lunar Biology Experiments

Introduction: Automated biological experiments on small spacecraft missions have gained prominence over the past decade due to their simplicity, accessibility, and small mass, volume, and power needs. Most recently, the BioSensor microfluidic CubeSat payload aboard BioSentinel used an automated microfluidic cell culture system to study the effects of environmental stressors like deep space radiation and microgravity on yeast growth and metabolism. BioSentinel’s successor, the Lunar Explorer Instrument for space biology Applications (LEIA), will study the effects of lunar gravity and radiation using an improved version of the BioSensor microfluidic platform. The BioSensor payload has great adaptability to host a diverse range of biological experiments with single- and multi-celled organisms in both crewed and uncrewed missions, making it a compelling candidate for future space biology studies in a lunar surface environment. BioSensor Instrumentation on BioSentinel: The first spaceflight mission with the BioSensor, BioSentinel’s biology experiments occurred at three locations -- deep space, ISS and ground. The payload contained 18 microfluidic cards, each featuring 16 growth wells (a total of 288 growth wells). Each well was loaded before launch with desiccated yeast. In space, liquid culture medium (nutrients) was automatically introduced to batches of wells at a time to initiate a series of biology experiments. Temperature was maintained by thin film heaters on both sides of each card. Each well was equipped with three LEDs emitting at 570 nm, 630 nm, and 850 nm, paired with photodetectors to measure cell concentration and the alamarBlue (metabolic indicator dye) color transition from blue to pink. Phenotypic parameters like cell viability, metabolic rate, and generation time can be derived from these measurements. The sequence and timing of fluid fills, optical measurements, and thermal control were stored onboard, but could be updated asynchronously via ground communication. LEIA: LEIA is slated for launch no earlier than 2026 on a CLPS lander. BioSentinel’s BioSensor has been modified for use in LEIA. These improvements include: (a) storage for multiple culture medium types, (b) additional LED color (465 nm) for a new biological assay for antioxidant (carotenoid) production, (c) housing modifications for later biology load before launch, (d) improved isolation between electronic and fluidic components, and (e) improved humidity control for prolonged organism viability in case of post-load launch delay. Future Prospects: The consistent and successful demonstration of complex fluidics platforms alongside reliable instrument operations in a space environment is poised to create strong momentum for BioSensor-based biological experiment payloads. Planned future developments with the BioSensor include extending compatibility to a broader range of organisms and assays. Preliminary work has already demonstrated successful growth of Arabidopsis seedlings in fluidic cards. With a few modifications to the optical assembly, the setup could easily measure photosynthetic traits in plants and cyanobacteria. The addition of fluorescence measurements and generation of novel luminescent assays will elevate BioSensor’s functionality further. Beyond the BioSensor’s potential uses on free-flyer missions, ISS and Gateway, and CLPS landers, deploying the BioSensor to the lunar surface or in an artificial habitat on crewed missions could enable pioneering research on both how life responds to lunar conditions and future bioproduction capabilities making the BioSensor an indispensable tool for future space biology research.

Chinmayee Govinda Raj↗

Comparison of Propulsion Options for Human Exploration of Mars

NASA continues to advance plans to extend human presence beyond low-Earth orbit leading to human exploration of Mars. The plans being laid out follow an incremental path, beginning with initial flight tests followed by deployment of a Deep Space Gateway (DSG) in cislunar space. This Gateway, will serve as the initial transportation node for departing and returning Mars spacecraft. Human exploration of Mars represents the next leap for humankind because it will require leaving Earth on a long mission with very limited return, rescue, or resupply capabilities. Although Mars missions are long, approaches and technologies are desired which can reduce the time that the crew is away from Earth. This paper builds off past analyses of NASA's exploration strategy by providing more detail on the performance of alternative in-space transportation options with an emphasis on reducing total mission duration. Key options discussed include advanced chemical, nuclear thermal, nuclear electric, solar electric, as well as an emerging hybrid propulsion system which utilizes a combination of both solar electric and chemical propulsion.

Drake, Bret G.↗

Jettison and Disposal from Near Rectilinear Halo Orbits, Part 1: Theory

The proposed Gateway spacecraft in a Near Rectilinear Halo Orbit (NRHO) will be a human outpost in cislunar space. The baseline mission may experience the deployment of visiting vehicles, cubesats, and on-orbit debris. Departure from the NRHO and cislunar space is nontrivial due to the complex gravitational environment that persists in and around Gateway. Long-term disposal orbits in heliocentric space offer safe destinations for deployed objects. To mitigate risks associated with conjunctions between Gateway and deployed objects, strategies to identify risk-avoidant paths to heliocentric space are necessary for Gateway mission operations.

Stephen T. Scheuerle↗

Summary of Gateway Power and Propulsion Element (PPE) Studies

NASA's Power and Propulsion Element (PPE) is based on a joint industry/NASA demonstration of an advanced solar electric propulsion powered spacecraft to meet commercial and NASA objectives. The PPE can establish the initial presence in cislunar space for the Gateway through initial operations and the subsequent deployment of additional partner-provided elements for the cislunar platform. Five commercial vendors were selected to conduct PPE studies which addressed key drivers for PPE development and support for the Gateway concept formulation. The study vendors focused on their performance trades and assessing their strategic capabilities, leveraging their existing and planned capabilities for PPE development. The industry studies examined differences between prior Solar Electric Propulsion (SEP) mission concepts, expected industry capabilities, and potential needs supporting NASA's Gateway concept. These studies provided data on commercial capabilities relevant to NASA's exploration needs and reduced risk for a new, powerful, and efficient SEP-based PPE spacecraft.

Irimies, David↗

Disposal, Deployment, and Debris in Near Rectilinear Halo Orbits

A proposed Gateway facility in a lunar Near Rectilinear Halo Orbit (NRHO) will serve as an outpost in deep space, with spacecraft periodically arriving and departing. Departing objects will include logistics modules, requiring safe disposal, cubesats, deployed to various destinations, and debris objects, whose precise paths may be unknown. Escape dynamics from NRHOs are complex; primarily influenced by the Earth and Moon within the orbit, spacecraft are significantly impacted by solar gravity upon departure. The current investigation explores the dynamics of departure from the NRHO, including the risk of debris recontact, safe heliocentric disposal, and deployment to select destinations.

Davis, Diane C.↗

Developing Autonomous Technologies for Biological Missions to Deep Space

In upcoming biological missions beyond low Earth orbit (LEO), the use of autonomous instrumentation will allow scientists to perform a variety of experiments, including the characterization of the response to different space environments (Moon, Mars, interplanetary space) using biological models like microbes, plants, organoids, and tissue chips. BioSentinel is an ongoing deep space mission, currently at over 50 million kilometers from Earth and the first instrument developed to perform biological experiments beyond LEO. Even though the primary objective of this CubeSat mission was to investigate the effects of the deep space radiation environment on budding yeast, the spacecraft bus (i.e., all the subsystems that support the biological payload like power, thermal, data telemetry, navigation, etc.) can accommodate a variety of biological (and physical) experiments and model organisms. LEIA, an upcoming CLPS mission to the lunar surface, uses a microfluidic and optical instrument based on BioSentinel to study the effects of the lunar environment on different cellular processes and on bioproduction of antioxidants. A new series of science mission concepts are being proposed to be accommodated into platforms like BioSentinel. These missions will investigate the response of a variety of organisms to the deep space environment, including but not limited to single-cell eukaryotes, cyanobacteria, plants (including crops), organoids, and tissue chips. In addition to optical absorbance measurements like the ones performed in BioSentinel (and LEIA), we are investigating the use of fluorescence detection, microscopy, sequencing devices, etc. Thus, instruments like the ones proposed here can be adapted to a variety of platforms like free-flyers, deployable payloads, landers, rovers, and the lunar Gateway. These technologies can be used as steppingstones for establishing a sustained human presence on the Moon and in deep space while providing knowledge for the development of potential countermeasures.

Sergio R Santa Maria↗

Power and Propulsion for Gateway: A NASA SBIR/STTR Success Story

NASA’s Gateway in lunar orbit will play a critical role in the Artemis program, which aims to land the first woman and the next man on the Moon by 2024. The development of the Power and Propulsion Element for Gateway is being led by Maxar Technologies, a mid-size organization, with contributions from two NASA SBIR/STTR awardees—Deployable Space Systems and Busek Company, Inc, both of which initially developed their Gateway contributions with support from the NASA SBIR/STTR program.

SBIR/STTR↗

Smart Crop Farming Systems for Artemis Exploration Missions

Space crop production systems that mitigate risks of crew poor performance or illness due to inadequate food and nutrition are needed during manned Artemis exploration missions beyond LEO. Prototype farms must be designed for deployment on ISS and tested in manned platforms: Gateway, lunar habitats, and Mars trans-hab spacecraft in preparation for human missions to Mars. Food production must be optimal and safe for human consumption. Thus, plant growth facilities (i.e. Veggie and APH) can be enhanced with imaging systems (including hyperspectral, multispectral, lidar, and fluorescence imaging systems) for nondestructive monitoring of plant health, stress and assessing food safety. Databases of crop responses to stress obtained during ground studies can be used to develop novel artificial intelligence (AI) algorithms for optimizing crop production (i.e. environmental settings during growth) and for detecting crop indices that ensure food safety. Future farming systems should be sustainable and smart. Novel adaptive AI algorithms requiring limited data sets for calibration are needed for reducing crew intervention during plant cultivation except for maintenance and harvesting events. Eventually, AI driven control systems that include autonomous planting, growing, and harvesting as well as periodic sanitization need evaluation for supplementing crew diets with fresh produce during future Mars exploration missions.

O Monje↗

Gateway Program Progress and Overview

This paper provides an overview and status of the Gateway, which will be a small, human-tended space station in orbit around the Moon. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop the Gateway. Gateway is the cornerstone of sustainable deep space human exploration and is an essential element of the infrastructure necessary for the execution of the Artemis missions to the Moon. This paper will outline the current planned configuration and deployment of the station, describing the concept of operations and how Gateway supports both lunar surface missions and also serves as the springboard for exploration deeper in space. Calendar year 2022 will see the accomplishments of major milestones such as over twenty systems preliminary design reviews (PDRs), a Program-wide PDR-informed synchronization review, and NASA Key Decision Point marking the evolution of the program as a whole from the formulation phase and into implementation. This paper will provide a progress update for each major component of the Gateway: The Power and Propulsion Element; the Habitation and Logistics Outpost (HALO); Deep Space Logistics; the International Habitation module; the European System Providing Refueling, Infrastructure, and Telecommunications (ESPRIT), which includes a Refueler Module and the HALO Lunar Communications System; External Robotics System; and an Airlock with both science and crew capabilities. For each component, the paper will describe the current maturity of the modules, acquisition strategy, contracts, and if applicable, international partnership status. This paper will also outline the integration function the Gateway Program Office performs at the NASA Johnson Space Center, including the multilateral governance structure and cross-program interfaces across Artemis.

Gateway↗

NASA: 60 Years and Counting...

Sputnik launched on 4 Oct 1057. On July 29, 1958, Eisenhower signed the National Aeronautics and Space Act, the creation of NASA. The Soviets launched the first human into orbit, Yuri Gagarin, on April 12, 1961. On 5 May 1961, Alan Shepard's Freedom 7 Mercury capsule lifted off at 9:34 a.m. from Launch Complex 5 at Cape Canaveral Air Force Station, and flew a suborbital trajectory lasting 15 minutes and 22 seconds, America's first man in space. On 25 May 1961, Kennedy delivered a speech to a joint session of Congress. In that speech, he stated "I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the moon and returning him safely to the earth." The rest, as they say, is history. Project Mercury, the first U.S. program to put humans in space, made 25 flights, six of which carried astronauts between 1961 and 1963. The Gemini program primarily tested equipment and mission procedures and trained astronauts and ground crews for future Apollo missions to the Moon. Exactly eight years, one month and 26 days after President Kennedy challenged Americans to reach for the Moon, Project Apollo landed the first humans on the lunar surface and returned them safely to Earth. In 1973, Skylab expeditions paved the way for the International Space Station. Over 30 years, NASA's space shuttle fleet, ”Columbia, Challenger, Discovery, Atlantis and Endeavour,” flew 135 missions and carried 355 different people to space. The space shuttle carried people into orbit repeatedly; launched, recovered and repaired satellites; conducted cutting-edge research; and built the largest structure in space, the International Space Station. Tragically, NASA lost two crews of seven in the 1986 Challenger accident and the 2003 Columbia accident. The International Space Station is a model for global cooperation and scientific advancements that is enabling growth of private industry in low-Earth orbit and development of new technologies to advance human space exploration. Built between 1998 and 2011, the space station has housed humans continuously since Nov. 2, 2000. NASA has contracted with commercial companies SpaceX, Orbital ATK, and Sierra Nevada Corporation to deliver science investigations, cargo, and supplies to the crews living in space, and soon Boeing and SpaceX will transport astronauts to and from the station. Today, NASA is working on many fronts to advance man's presence in space. NASA's Exploration Campaign will establish U.S. preeminence in cislunar space through the operations and the deployment of a U.S.-led Lunar Orbital Platform-Gateway (LOPG). Together with the Orion and SLS Programs, the LOPG is central to advancing and sustaining human space exploration goals, and is the unifying single stepping off point for human cislunar operations, lunar surface access and missions to Mars. As one might expect, EMC for all this activity is challenging, to say the least. In the next half-hour or so, I will talk about some of those challenges and how the different programs are meeting them.

Scully, Bob↗