Search NASA⌕ Search

SEARCH · Search NASA

Results for “generational planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Goal-driven Automation of a Deep Space Communications Station: A Case Study in Knowledge Engineering for Plan Generation and Execution

This paper describes the application of Artificial Intelligence techniques for plan generation, plan execution, and plan monitoring to automate a Deep Space Communication Station. This automation allows a Communication station to respond to a set of tracking goals by appropriately reconfiguring the communications hardware and software to provide the requested communications services.

Artificial Intelligence↗

PLAN-IT-2: The next generation planning and scheduling tool

PLAN-IT is a scheduling program which has been demonstrated and evaluated in a variety of scheduling domains. The capability enhancements being made for the next generation of PLAN-IT, called PLAN-IT-2 is discussed. PLAN-IT-2 represents a complete rewrite of the original PLAN-IT incorporating major changes as suggested by the application experiences with the original PLAN-IT. A few of the enhancements described are additional types of constraints, such as states and resettable-depletables (batteries), dependencies between constraints, multiple levels of activity planning during the scheduling process, pattern constraint searching for opportunities as opposed to just minimizing the amount of conflicts, additional customization construction features for display and handling of diverse multiple time systems, and reduction in both the size and the complexity for creating the knowledge-base to address the different problem domains.

Eggemeyer, William C.↗

Identifying Executable Plans

Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the ~xec~~tieonfvii r~nm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.

Bedrax-Weiss, Tania↗

Challenges in building intelligent systems for space mission operations

The purpose here is to provide a top-level look at the stewardship functions performed in space operations, and to identify the major issues and challenges that must be addressed to build intelligent systems that can realistically support operations functions. The focus is on decision support activities involving monitoring, state assessment, goal generation, plan generation, and plan execution. The bottom line is that problem solving in the space operations domain is a very complex process. A variety of knowledge constructs, representations, and reasoning processes are necessary to support effective human problem solving. Emulating these kinds of capabilities in intelligent systems offers major technical challenges that the artificial intelligence community is only beginning to address.

Hartman, Wayne↗

A Comparison of Declarative and Hybrid Declarative-Procedural Models for Rover Operations

The MAPGEN [2] (Mixed-initiative Activity Plan GENerator) planning system is a great example of a hybrid procedural/declarative system where the advantages of each are leveraged to produce an effective planner/scheduler for Mars Exploration Rover tactical planning. We explore the adaptation of the same domain to an entirely declarative planning system (ASPEN [4] Activity Scheduling and Planning ENvironment), and demonstrate that, with some translation, much of the procedural knowledge encoding is amenable to a declarative knowledge encoding.

declarative domain representations↗

Avoiding Selection Bias in Generating Examples of Plans in the Presence of Heuristic Error

It is generally understood that heuristic error hurts the performance of search algorithms, measured in terms of search effort. Hence there is an interest in understanding how to reduce heuristic error. One way to do this is to learn a heuristic from a set of examples of plans generated offline, e.g. bootstrapping methods. In this paper, we consider how some methods for generating examples of plans may skew the training set in the presence of heuristic errors. Initial theoretical results show that duplicate detection is one source of selection bias in the canonical A* algorithm. We introduce a duplicate selection scheme for A* that avoids selection bias in generating cost-optimal examples, without compromising memory efficiency, and develop ideas in the satisficing setting. We evaluate our approach on n x m grids with multiple cost-optimal solutions and synthetic heuristic error. Finally, we attempt to extend these ideas to the problem of generating extreme examples of plans.

Alison S Paredes↗

Getting the Most from the Twin Mars Rovers

The report discusses the Mixed-initiative Activity Planning GENerator (MARGEN) automatically generates activity plans for rovers. Decision support system mixes autonomous planning/scheduling with user modifications. Accommodating change. Technology spotlight

Laufenberg, Larry↗

Architecture for spacecraft operations planning

A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

Davis, William S.↗

2nd Generation RLV Plans

This viewgraph presentation gives an overview of the Second Generation Reusable Launch Vehicle (RLV) plans, including details on the background of the RLV, goals and scheduling, program requirements and organization, technology drivers and interfaces, acquisition strategy and planning, and the status of the plans.

Dumbacher, Dan↗

Maintaining consistency between planning hierarchies: Techniques and applications

In many planning and scheduling environments, it is desirable to be able to view and manipulate plans at different levels of abstraction, allowing the users the option of viewing and manipulating either a very detailed representation of the plan or a high-level more abstract version of the plan. Generating a detailed plan from a more abstract plan requires domain-specific planning/scheduling knowledge; the reverse process of generating a high-level plan from a detailed plan Reverse Plan Maintenance, or RPM) requires having the system remember the actions it took based on its domain-specific knowledge and its reasons for taking those actions. This reverse plan maintenance process is described as implemented in a specific planning and scheduling tool, The Mission Operations Planning Assistant (MOPA), as well as the applications of RPM to other planning and scheduling problems; emphasizing the knowledge that is needed to maintain the correspondence between the different hierarchical planning levels.

Zoch, David R.↗

APGEN Version 5.0

Activity Plan Generator (APGEN), now at version 5.0, is a computer program that assists in generating an integrated plan of activities for a spacecraft mission that does not oversubscribe spacecraft and ground resources. APGEN generates an interactive display, through which the user can easily create or modify the plan. The display summarizes the plan by means of a time line, whereon each activity is represented by a bar stretched between its beginning and ending times. Activities can be added, deleted, and modified via simple mouse and keyboard actions. The use of resources can be viewed on resource graphs. Resource and activity constraints can be checked. Types of activities, resources, and constraints are defined by simple text files, which the user can modify. In one of two modes of operation, APGEN acts as a planning expert assistant, displaying the plan and identifying problems in the plan. The user is in charge of creating and modifying the plan. In the other mode, APGEN automatically creates a plan that does not oversubscribe resources. The user can then manually modify the plan. APGEN is designed to interact with other software that generates sequences of timed commands for implementing details of planned activities.

Maldague, Pierre↗

MAPGEN : mixed initiative planning and scheduling for the Mars '03 MER mission

The Mars Exploration Rovers Mars '03 mission is one of NASA's most ambitious science missions to date. The rovers will be launched in the summer of 2003 with each rover carrying instruments to conduct remote and in-situ observation to elucidate the planet's past climate, water activity, and habitability. Science is the primary driver of MER and, as a consequence, making best use of the scientific instruments, within the available resources, is a crucial aspect of the mission. To address this critically, the MER project has selected MAPGEN (Mixed-Initiative Activity Plan GENerator) as an activity planning tool. MAPGEN combines two exiting systems, each with a strong heritage: APGEN the Activity Planning tool from the Jet Propulsion Laboratory and the Europs Planning/Scheduling system from NASA Ames Research Center. This paper discusses the issues arising from combining these tools in the context of this mission.

planning and scheduling↗

Massively parallel support for a case-based planning system

Case-based planning (CBP), a kind of case-based reasoning, is a technique in which previously generated plans (cases) are stored in memory and can be reused to solve similar planning problems in the future. CBP can save considerable time over generative planning, in which a new plan is produced from scratch. CBP thus offers a potential (heuristic) mechanism for handling intractable problems. One drawback of CBP systems has been the need for a highly structured memory to reduce retrieval times. This approach requires significant domain engineering and complex memory indexing schemes to make these planners efficient. In contrast, our CBP system, CaPER, uses a massively parallel frame-based AI language (PARKA) and can do extremely fast retrieval of complex cases from a large, unindexed memory. The ability to do fast, frequent retrievals has many advantages: indexing is unnecessary; very large case bases can be used; memory can be probed in numerous alternate ways; and queries can be made at several levels, allowing more specific retrieval of stored plans that better fit the target problem with less adaptation. In this paper we describe CaPER's case retrieval techniques and some experimental results showing its good performance, even on large case bases.

Kettler, Brian P.↗

Centralized Planning for Multiple Exploratory Robots

A computer program automatically generates plans for a group of robotic vehicles (rovers) engaged in geological exploration of terrain. The program rapidly generates multiple command sequences that can be executed simultaneously by the rovers. Starting from a set of high-level goals, the program creates a sequence of commands for each rover while respecting hardware constraints and limitations on resources of each rover and of hardware (e.g., a radio communication terminal) shared by all the rovers. First, a separate model of each rover is loaded into a centralized planning subprogram. The centralized planning software uses the models of the rovers plus an iterative repair algorithm to resolve conflicts posed by demands for resources and by constraints associated with the all the rovers and the shared hardware. During repair, heuristics are used to make planning decisions that will result in solutions that will be better and will be found faster than would otherwise be possible. In particular, techniques from prior solutions of the multiple-traveling- salesmen problem are used as heuristics to generate plans in which the paths taken by the rovers to assigned scientific targets are shorter than they would otherwise be.

Estlin, Tara↗

Software for Planning Scientific Activities on Mars

Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.

Ai-Chang, Mitchell↗