Thermal mapping, geothermal source location, natural effluents and plant stress in the Mediterranean coast of Spain
There are no author-identified significant results in this report.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
Although no significant results were achieved during the report period, research continues. A sample of imagery showing thermal inertia and temperature differences over the northeastern United States and Europe was received. The project coordinator attended a TELLUS Project meeting in Ispra, Italy at which general guidelines for the future were established and the quality of the data received was discussed.
Data obtained by HCMM satellite over a complex area in eastern Spain were evaluated and found to be most useful in studying macrostructures in geology and in analyzing marine currents, layers, and areas (although other satellites provide more data). The upper scale to work with HCMM data appears to be 1:2.000.000. Techniques used in preprocessing, processing, and analyzing imagery are discussed as well as methods for pattern recognition. Surface temperatures obtained for soils, farmlands, forests, geological structures, and coastal waters are discussed. Suggestions are included for improvements needed to achieve better results in geographic areas similar to the study area.
Geothermal energy is considered an essential renewable resource to generate flexible electricity. Geothermal resource assessments conducted by the U.S. Geological Survey showed that the southwestern basins in the U.S. have a significant geothermal potential for meeting domestic electricity demand. Within these southwestern basins, play fairway analysis (PFA), funded by the U.S. Department of Energy’s (DOE) Geothermal Technologies Office, identified that the Tularosa Basin in New Mexico has significant geothermal potential. This short communication paper presents a machine learning (ML) methodology for curating and analyzing the PFA data from the DOE’s geothermal data repository. The proposed approach to identify potential geothermal sites in the Tularosa Basin is based on an unsupervised ML method called non-negative matrix factorization with custom k-means clustering. This methodology is available in our open-source ML framework, GeoThermalCloud (GTC). Using this GTC framework, we discover prospective geothermal locations and find key parameters defining these prospects. Our ML analysis found that these prospects are consistent with the existing Tularosa Basin’s PFA studies. This instills confidence in our GTC framework to accelerate geothermal exploration and resource development, which is generally time-consuming.
Exploration for uranium, thorium, oil, gas and geothermal activity through remote sensing techniques is considered; satellite monitoring of coal-derived CO2 in the atmosphere, and the remote assessment of strip mining and land restoration are also mentioned. Reference is made to color ratio composites based on Landsat data, which may aid in the detection of uranium deposits, and to computer-enhanced black and white airborne scanning imagery, which may locate geothermal anomalies. Other applications of remote sensing to energy resources management, including mapping of transportation networks and power plant siting, are discussed.
Skylab-4 X-5 thermal data of the geysers area was analyzed to determine the feasibility of using midday Skylab images to detect geothermal areas. The hottest ground areas indicated on the Skylab image corresponded to south-facing barren or sparsely vegetated slopes. A geothermal area approximately 15 by 30 m coincided with one of the hottest areas indicated by Skylab. This area could not be unambiguously distinguished from the other areas which are believed to be hotter than their surroundings as a result of their topography, and micrometeorological conditions. A simple modification of a previous thermal model was performed and the predicted temperatures for the hottest slopes using representative values was in general agreement with the observed data. It is concluded that data from a single midday Skylab pass cannot be used to locate geothermal areas.
This report analyzes potential collaborations between the geothermal and locatable mineral industries (focused on the portion of the Basin and Range Province within Nevada, United States of America). The objectives of this study included analyzing: 1. The type and quality of data collected by the locatable mineral industry to determine feasibility for geothermal resource exploration; 2. The regulatory pathways and potential barriers that could prevent development of geothermal resources discovered via a mining claim (and vice versa) in the United States; 3. The historical development of geothermal resources discovered via mineral exploration data in the United States and illustrations of co-located mining and geothermal power projects; 4. The value propositions for both the locatable mineral and the geothermal industries to collaborate. This article concludes that many of the data collected by the mining industry as part of locatable mineral exploration (e.g., copper, gold, lithium) would also be useful for identifying and developing previously unknown geothermal resources (and in some notable cases, already have led to geothermal resource development). In addition, for minimal costs, the mining industry could catalogue these data and potentially monetize the data itself or use the data in the future to develop a geothermal project. Leveraging these locatable mineral data to develop geothermal resources and/or co-located minerals and geothermal resources would represent significant cost savings when compared to developing geothermal resources under a business-as-usual scenario as well as compared to current generating technologies (e.g., diesel-powered generators) employed at remote mining operations. Ultimately, leveraging mining industry data, knowledge, and expertise serves to effectively expand the geothermal exploration workforce, increase the rate of geothermal resource discovery, and potentially reduce geothermal electricity's levelized cost of energy (LCOE) by 23%-29%.
The locatable mineral industry is shifting toward improving environmental performance and becoming more sustainable, with numerous mining companies shifting to renewable energy technologies to power mine operations and at least one company pledging net-zero emissions by 2050. One potential electricity source to help achieve improved environmental performance and decarbonization within the mining industry is geothermal energy. As part of a study into potential collaboration between the geothermal and locatable mineral industries (focused on the portion of the Basin and Range Province within Nevada), the National Renewable Energy Laboratory (NREL) with support from the U.S. Department of Energy (DOE) Geothermal Technologies Office (GTO), investigated data, economic, and regulatory factors that may contribute to or inhibit synergies between the two industries. The objectives of the study included analyzing: The type and quality of data collected by the locatable mineral industry to determine feasibility for geothermal resource exploration; The regulatory pathways and potential barriers that could prevent development of geothermal resources discovered via a mining claim (and vice versa); The historical development of geothermal resources discovered via mineral exploration data; The value propositions for both the locatable mineral and the geothermal industries to collaborate.
The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.
The Raft River geothermal field, located in Cassia County in southwestern Idaho, is the site of a Department of Energy Enhanced Geothermal System project. U.S. Geothermal, Inc. currently produces about 11 MWe from Precambrian metamorphic rocks. These lie beneath ~5,000 ft of Quaternary and Tertiary volcaniclastic and volcanic deposits. Maximum temperatures range from 271°F to 300°F. Well RRG-9 ST1, the well targeted for stimulation is located approximately 1 mile south of the main bore field. The open hole section of the well, from 5,551 to 5,900 ft MD, consists of Precambrian Elba Quartzite, the stimulation target, granite and minor diabase. Prior to setting the casing acoustic, gamma ray, and density logs were run. After completing the well, a step rate/step down test was conducted. The maximum injection rate achieved was 18 bpm at a wellhead pressure of 1,150 psig. A borehole televiewer run in the open hole section showed evidence of more than eighty fractures. The majority of these fractures trend from N20⁰W to N20°E and dip from 40° to 60°W. Permeable fractures were encountered in the Elba Quartzite at 5,640-5,660 ft MD. Analysis of the injection test indicates that the minimum in-situ principal stress in this zone is 3,050-3,200 psi, corresponding to a fracture gradient of 0.59-0.62 psi/ft. A discrete fracture network model was developed using measured and inferred fracture orientations, distributions and dimensions. A three-phase stimulation program is proposed for RRG-9 ST-1. During the first two stages, water at 140°F, and later 40°F, will be injected to pre-condition and thermally fracture the reservoir. Here, the third stage will consist of a high rate, large volume conventional hydraulic stimulation.
The Raft River geothermal system, located 160 km northwest of Salt Lake City, Utah is the site of a Department of Energy Enhanced Geothermal System (EGS) stimulation demonstration project. The target well RRG-9 ST-1, is roughly 1.6 km (1 mile) south of the power plant. This well has undergone a series of thermal and hydraulic stimulation treatments. Furthermore, the well passes through approximately 1,524 m MD (5,000 ft. MD) of laterally discontinuous Quaternary and Tertiary volcanoclastic and volcanic rocks that unconformably overlie the Precambrian basement. The Elba Quartzite formation located in the Precambrian basement is the target zone for the stimulation program. Fluid injected into the well exits through a fracture zone in the Elba Quartzite at 1,567 m TVD (5,140 ft. TVD). In June 2013 low-rate stimulation began at RRG-9 ST-1 using injection water from the geothermal plant. The average injection rate, temperature, and well head pressure of the low-rate stimulation was 163 Lpm (43 gpm), 34°C, and 1,931kPa (280 psig), respectively. This injection continued through late August of 2013 when wellhead pressures were intentionally increased to approximately 5,516 kPa (800 psig) at approximately 984 Lpm (260 gpm). From September 12 to September 24, 2013 cold well water was injected. The average surface injection temperature was approximately 12°C. On September 25, 2013 injection of the warmer plant water was resumed. This was continued through the rest of 2013 and into 2014. Between April 1, 2014 and April 4, 2014, a higher rate hydraulic stimulation was conducted. Colder water (~10°C) was injected at rates of 20 bpm to 30 bpm (3,178 Lpm to 4,770 Lpm) at wellhead pressures of 5,861 kPa (850 psig) over approximately 24 hours. Microseismic activity was recorded near the Tertiary-Precambrian contact. Subsequently, injection of water from the plant was resumed. As of mid-January, 2015, over 666 million liters (176 million gallons) have been injected into the well. The fate of this water is the subject of ongoing numerical analyses and continuous site monitoring. Various analyses have been implemented to monitor and assess the ongoing stimulation program. Modified Hall plot analysis shows increasing conductivity and/or a decreasing skin factor around the wellbore. Since April, 2014, the injectivity index has increased significantly from 0.28 Lpm/kPa (0.5 gpm/psig) to 0.93 Lpm/kPa (1.7 gpm/psig).
This is the Utah FORGE well 16A(78)-32 stimulation microseismic detection and location report from Silixa LLC. The stimulation was accomplished during April, 2022.
The availability of free and high temporal resolution satellite data and advanced SAR techniques allows us to analyze ground displacement cost-effectively. Our aim was to properly define subsidence and uplift areas to delineate a geothermal field and perform time-series analysis to identify temporal trends. A Persistent Scatterer Interferometry (PSI) algorithm was used to estimate vertical displacement in the Brady geothermal field located in Nevada by analyzing 70 Sentinel-1A Synthetic-Aperture Radar (SAR) images, between January 2017 and December 2019. To classify zones affected by displacement, an unsupervised Self-Organizing Map (SOM) algorithm was applied to classify points based on their behavior in time, and those clusters were used to determine subsidence, uplift, and stable regions automatically. Finally, time-series analysis was applied to the clustered data to understand the inflection dates. The maximum subsidence is –19 mm/yr with an average value of –6 mm/yr within the geothermal field. The maximum uplift is 14 mm/yr with an average value of 4 mm/yr within the geothermal field. The uplift occurred on the NE of the field, where the injection wells are located. On the other hand, subsidence is concentrated on the SW of the field where the production wells are located. The coupling of the PSInSAR and the SOM algorithms was shown to be effective in analyzing the direction and pattern of the displacements observed in the field.
Version 2 of the GeoRePORT protocols and excel-based reporting tools. Software allows users to grade the geologic, technical, and socio-economic conditions at a geothermal resource location for both electricity generation and direct-use. Includes tool and protocols for: * Geologic Assessment Tool * Technical Assessment Tool * Socio-Economic Assessment Tool * International Socio-Economic Assessment Tool In addition, GeoRePORT now includes a Resource Size Assessment tool and protocol.
The WHOLESCALE acronym stands for Water & Hole Observations Leverage Effective Stress Calculations and Lessen Expenses. The goal of the WHOLESCALE project is to simulate the spatial distribution and temporal evolution of stress in the geothermal system at San Emidio in Nevada, United States. To reach this goal, the WHOLESCALE team has developed a methodology to incorporate and interpret data from four methods of measurement into a multi-physics model that couples thermal, hydrological, and mechanical (T H-M) processes. The WHOLESCALE team has applied this methodology at the San Emidio geothermal field, located ~100 km north of Reno, Nevada in the northwestern Basin and Range province. The WHOLESCALE team includes 30 individuals working at two universities, two national laboratories, and one industry partner. Two master-degree students and five post-doctoral researchers have gained professional experience and earned partial financial support via the WHOLESCALE project. The WHOLESCALE team has taken advantage of the perturbations created by changes in pumping operations during planned shutdowns in 2016, 2021, and 2022 to infer temporal changes in the state of stress in the geothermal system at San Emidio, Nevada, U.S. The WHOLESCALE results support the working hypothesis that increasing pore-fluid pressure reduces the effective normal stress acting across fault zones. During normal operations, pumping in deep production wells decreases fluid pressures and thus increases the effective normal stresses on faults, reducing microseismicity. During planned shutdowns, the cessation of production increases pore-fluid pressure and reduces effective normal stress. The WHOLESCALE products generated during the 4-year period between 2020 and 2024 include: three articles published in the open-access, peer-reviewed scientific literature, two master’s theses, 20 presentations or papers at scientific conferences, and 17 data sets available on public repositories. The WHOLESCALE project has been completed in two phases that included three performance periods separated by two Go/No-go Stage Gate Reviews. Tasks were classified by data type (i.e., Geologic Structure, Borehole, Geodesy, Hydrology, Seismology, and Modeling). The first phase of the project started July 31, 2020 and included ongoing project coordination (Task 1), a project kickoff (Task 2), analysis of existing data (Task 3), development of the initial stress model & deployment design (Task 4), and Go/No-go Decision Point #1 (Task 5). Phase II began with implementing the 2022 deployment (Task 6), followed by Go/No-go Decision Point #2 (Task 7) The remainder of Phase II consisted of analyzing data collected during deployment (Task 8), calibration of the stress model on all observations (Task 9), and the Final Review (August 23, 2024) & Reporting (Task 10).
Geothermal project development in the United States may be subject to numerous permits, authorizations, and other regulatory requirements at the federal, state, and local level, which are necessary to address potential environmental and resource impacts at geothermal project sites. This report presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.
This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.