Search NASA⌕ Search

SEARCH · Search NASA

Results for “geothermal resource capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Introducing the GeoRePORT Resource Size Tool: Reporting on Geothermal Resource Size Estimations Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT): Preprint

The Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT) was developed with funding from the U.S. Department of Energy Geothermal Technologies Office to assist in identifying and pursuing long-term investment strategies through the development of a resource reporting protocol. The assessment protocols used in GeoRePORT allow for comparison of project attributes across locations and geological settings to understand the feasibility of geothermal development. This work introduces the Resource Size Tool, a new feature within the GeoRePORT package that compiles two independent methods for estimating geothermal resource size in terms of energy capacity in MW. Energy production potential for twenty-three case studies was estimated with the Resource Size Tool in order to 1) generate a reasonable range of resource size estimates for a particular geothermal field; 2) illustrate the advantages and limitations of each methodology (such as data input requirements, estimate accuracy and precision, and the appropriate circumstances of use); and 3) test the ability of the resource size tool to provide useful and accurate information for geothermal stakeholders. The tool employs two methods widely used in the geothermal industry: (1) USGS Volumetric and (2) Power Density. Results from our case studies show general overlap between these two methods in terms of resource size estimates; however, they also reveal key differences between the two approaches that should be considered when using such estimates to drive development. First, the two methods rely on different input parameters and therefore one method may be more appropriate and/or accurate for a given project than the other. Second, the Power Density method was found to generate wider ranges of resource size predictions, more consistently aligning with actual power production of the field but with larger scales of error; whereas the USGS Volumetric method predicts narrower ranges but tends to overestimate when compared to current MW production. Future work will refine variables used in the methods with input data from other sections of GeoRePORT and modify uncertainty levels based on the particular datasets used for a given project.

geological↗

Chapter 2: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

The global geothermal power market has shown significant growth since the last decade and is expected to reach a total installed capacity of 18.4 gigawatts electric (GWe) by the end of 2021 (GEA, 2016). The global geothermal power plant turbine market is dominated by a small number of manufacturers. Between 2005 and 2015, 82% of the geothermal steam turbines were manufactured in Japan, and 74% of the geothermal binary cycle turboexpanders were manufactured in Israel. During this period, the United States played an important role in the global trade flow of fully assembled turbine units and turbine parts, with a high volume of imports and exports. Another significant growth area was in Italian turbine/turboexpander manufacturers, who have increased their market share in the last couple of years. One other important change in the manufacturing market was in Turkey, where the bonus on feed-in-tariff (FIT) for domestic hardware components boosted the national manufacturing sector between 2010 and 2020. When planning geothermal power projects, developers customize their power plant size to fit the available geothermal resource capacity. The turbine is designed and sized to optimize the efficiency and utilization of resource and revenue production. The rest of the power plant components such as heat exchangers (HX), water-cooled cooling towers (WCCT), or air-cooled condensers (ACC) are then chosen to complement the turbine size and design. These one-off manufacturing custom design turbines have relatively higher manufacturing set-up costs, longer lead times, and higher capital costs than the standard design turbines manufactured in larger volumes. However, turbines produced in standard increments and in larger manufacturing volumes could result in lower costs per turbine, but potentially lower efficiency. Based on pipeline projects and resource assessments, there is significant potential value in creating standard turbine sizes that could offer an economic advantage, as is done for modular microturbines.

40 EE - Geothermal Technologies Office (EE-4G)↗

Hawthorne Nevada Deep Direct-Use Feasibility Study - Data Used for Geothermal Resource Conceptual Modeling and Power Capacity Estimates

This data submission includes several data components that were used to develop a conceptual model and power capacity-estimates of two low-temperature geothermal resources that define geothermal prospect A at Hawthorne, Nevada. Data are sourced from a combination of legacy publicly-available data and more recent data acquisition conducted by the US Navy Geothermal Program Office (2008-2013) and the Great Basin Center for Geothermal Energy at the University of Nevada, Reno (2008-2010). Data sets include compiled fluid geochemistry data, down-hole temperature logs for wells in the vicinity of prospect A, 2 meter temperature survey data, temperature-spinner logs acquired in well HWAAD-2A, fracture picks from image log data acquired in wells HWAAD-2 and HWAAD-3, and X-Ray Diffraction (XRD) analyses on cuttings from wells HWAAD-2A and HWAAD-3. These data have been reviewed for errors and inconsistencies, but it is possible that few errors could still remain. The resource conceptual model and power capacity estimates are included in the final report to the US Department of Energy, and are presented in a manuscript by Ayling and Hinz. A link to the manuscript published in Geothermics is linked below in this submission.

15 GEOTHERMAL ENERGY↗

Variability in Diurnal and Seasonal Ambient Conditions on Geothermal Plant Performance and Cost

Geothermal plant performance is bounded by the second law efficiency, which accounts for the quantity of exergy that can be converted into useful work. This, in turn, is dependent on the geothermal resource temperature and the temperature of the heat sink (i.e., the ambient temperature). In this study, we show that ambient temperature variability on a diurnal and seasonal basis can affect performance and cost estimations for geothermal plants. We have utilized the updated System Advisor Model (SAM) to assess nine geothermal sites with existing resource capacities across three climate zones. Our analysis shows that both evaporatively-cooled flash and air-cooled binary cycle plants are affected by temperature, with a slightly higher effect in enhanced geothermal system binary sites. By assuming an ambient (wet bulb) temperature baseline of 15.6 degrees C (60 degrees F) and comparing baseline results to those from site-specific data, we observe up to 15% underestimation of plant performance and up to 20% overestimation of cost. These results make a case for the inclusion of location-based weather data as inputs to supply curves that are used in capacity expansion models for the prediction of future geothermal deployment scenarios.

ambient temperature↗

Renewable Energy Potential Model: Geothermal Supply Curves

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. The included paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results provided here should be considered with care due to the high uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for three scenarios: two hydrothermal (3.5km depth, USGS heat flow & SMU temperatures respectively) and one EGS (4.5km depth, SMU temperatures). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

15 GEOTHERMAL ENERGY↗

Development of a Geothermal Module in reV: Quantifying the Geothermal Potential while Accounting for the Geospatial Intersection of the Grid Infrastructure and Land Use Characteristics

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. This paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results should be considered with care due to the highly uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for five scenarios: four hydrothermal (3.5km depth) and one EGS (4.5km depth). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

exclusions↗

Development of a Geothermal Module in reV: Quantifying the Geothermal Potential While Accounting for the Geospatial Intersection of the Grid Infrastructure and Land Use Characteristics: Preprint

The Renewable Energy Potential (reV) model is a geospatial platform for estimating technical potential and developing renewable energy supply curves, initially developed for wind and solar technologies. The model evaluates deployment constraints, considering land use, environmental, and cultural factors, and estimates the distance to existing grid features to connect future plants (Maclaurin et al., 2021). A pressing deficiency in the reV model, however, is representation of geothermal electricity generation technologies. To address this gap, we developed a novel geothermal generation module for reV that allows for representation and analysis at the same level of detail as other renewable technologies. This paper describes our process for evaluating data sources for the modeling, and presents five preliminary reV geothermal results. More specifically, we present two sets of resource data that represent upper and lower bounds for geothermal potential. We then present several sensitivity runs using the upper bound resource data; the results are encouraging that levelized cost of electricity (LCOE) can be reduced by optimizing the location and estimated capacity of the spatially diverse geothermal resource while considering the distance to existing grid infrastructure. Our preliminary supply curves and levelized cost of electricity (LCOE) results should be considered with care due to the highly uncertainty in geothermal resource potential data. We present median LCOE values for the conterminous U.S. for five scenarios: four hydrothermal (3.5km depth) and one EGS (4.5km depth). The capital and operating costs for each respective technology are modeled. We also compare results using two different resource data sources.

exclusions↗

Variability in Diurnal and Seasonal Ambient Conditions on Geothermal Plant Performance and Cost: Preprint

Geothermal plant performance is bounded by the second law efficiency, which accounts for the quantity of exergy that can be converted into useful work. This in turn is dependent on the geothermal resource temperature and the temperature of the heat sink (i.e., the ambient temperature). In this study we show that ambient temperature variability on a diurnal and seasonal basis can affect performance and cost estimations for geothermal plants. We have utilized the updated System Advisor Model (SAM) to assess nine geothermal sites with existing resource capacities across three climate zones. Our analysis shows that both evaporatively-cooled flash and air-cooled binary cycle plants are affected by temperature, with a slightly higher effect in EGS binary sites. By assuming an ambient (wet bulb) temperature baseline of 15.6 degrees C (60 degrees F) and comparing baseline results to those from site-specific data we observe up to 15% underestimation of plant performance and up to 20% overestimation of cost.

ambient temperature↗

Insights Into Seismicity Associated With Flexibly Operating Enhanced Geothermal System From Real‐Time Distributed Acoustic Sensing

Enhanced Geothermal Systems (EGS) have the capacity to broaden the accessible resource pool for geothermal power generation. Traditionally viewed as a “baseload” resource, their flexible operation might also enable dispatchable load‐following generation and long‐term energy storage, aligning them with the evolving landscape of decarbonized electricity systems. However, increasing permeability and extracting energy during EGS operations can induce microseismic events; for many prior EGS efforts, some associated seismicity has been observed. While energetically beneficial, the flexibility of EGS operations prompts our inquiry into whether new types of operations will yield previously unseen seismicity patterns. We demonstrate the use of distributed acoustic sensing (DAS) with real‐time edge computing to monitor seismicity during a pilot test of a cyclically operated EGS facility at the Blue Mountain geothermal field. Our focus lies in uncovering seismicity insights from the real‐time microseismic catalog, particularly during load‐following dispatchability tests simulating flexible EGS operation. Here, we find that variations in pore pressure consistently correlate with seismicity, and that controlling pressure cycles during flexible operations appears to constrain microseismic activity during subsequent cycles. The spatio‐temporal evolution of microseismic clouds recorded during cyclic injection cycles fits diffusive models over our available observation period. Additionally, seismicity elevation lags behind pore pressure increases, likely due to pressure diffusion to the fracture system boundary. Through real‐time monitoring, we offer novel insights into seismicity associated with flexibly operating EGS. Our findings suggest that leveraging DAS and edge computing can inform EGS operations and help mitigate induced seismicity.

Chamarczuk, Michal [Rice Univ., Houston, TX (Unite↗

Geothermal Uncertainty Representation in reV: the Renewable Energy Potential Model

We present a preliminary methodology for including geothermal resource uncertainty into the Renewable Energy Potential model, which estimates potential capacity and costs on a gridded surface at the national scale. The uncertainty outputs characterize the 10th, 50th and 90th percentile for geothermal resources using two energy capacity estimation equations. We then present a method and results that demonstrate how other geologic data layers, which may be indicative of permeability, can be used to inform the mean and standard deviation of the geothermal capacity. We demonstrate how the mean and standard deviation can be defined or partially informed by using collocated regression estimates and estimate errors, respectively . These regression results are from 36 observed geothermal power plants in the Great Basin region and are also used to benchmark the P10-P90 calculations.

exclusions↗

Geothermal Representation in Power System Models

Power system models generally fail to capture the range of characteristics geothermal resources provide and the value they potentially contribute to decarbonization and reliability of future electricity grids as firm, dispatchable, non-combustion power resources. This study reviews the results of power system modeling efforts to investigate geothermal deployment potential in the United States, including the U.S. DOE GeoVision analysis and ongoing modeling and analysis efforts to support planning and development of future grids with 100% renewable energy in California. Several themes are identified that could be implemented immediately to improve the accuracy of geothermal representation in power system models: consistency of model inputs, modeling of baseload and dispatchable geothermal resources, accurate valuation of grid services, improved representation of capacity factor, use of contemporary LCOE estimates, improved understanding of the evolution of geothermal value, and use of accurate resource potential constraints. Many of the models reviewed produced significantly different amounts of geothermal resource selection - even when modeling the same region and time period. This highlights the variability of inputs and assumptions among models, so creating a consistent set of geothermal inputs is a first step toward more accurate representation of geothermal in models. Research opportunities are identified that could help improve geothermal data inputs in modeling efforts, including analyses of historical data, sensitivity to model inputs, and comparative value of geothermal generators as baseload or dispatchable resources. Outcomes of such research can inform the geothermal community about how best to guide geothermal development toward wider deployment in support of future electricity grids through improved understanding of the evolution of geothermal value over time and the characteristics that contribute to that value.

capacity expansion models↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop: Preprint

Geothermal cost and performance evaluation implemented via technoeconomic assessment (TEA) modeling is critical for the Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for the Annual Technology Baseline (ATB). The ATB data are inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL’s reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the US generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on technoeconomic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next generation technologies such as closed loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

Annual Technology Baseline↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop

Geothermal cost and performance evaluation implemented via techno-economic assessment (TEA) modeling is critical for the U.S. Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for NREL's Annual Technology Baseline (ATB), which provides inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL's reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the U.S. generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on techno-economic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next-generation technologies such as closed-loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

annual technology baseline↗

Nationwide cost and capacity estimates for sedimentary basin geothermal power and implications for geologic CO 2 storage

Sedimentary basins are naturally porous and permeable subsurface formations that underlie approximately half of the United States. In addition to being targets for geologic CO 2 storage, these resources could supply geothermal power: sedimentary basin geothermal heat can be extracted with water or CO 2 and used to generate electricity. The geothermal power potential of these basins and the accompanying implication for geologic CO 2 storage are, however, understudied. Here, we use the Sequestration of CO 2 Tool (SCO2T PRO ) and the generalizable GEOthermal techno-economic simulator (genGEO) to address this gap by a) estimating the cost and capacity of sedimentary basin geothermal power plants across the United States and b) comparing those results to nationwide CO 2 sequestration cost and storage potential estimates. We find that across the United States, using CO 2 as a geothermal heat extraction fluid reduces the cost of sedimentary basin power compared to using water, and some of the lowest cost capacity occurs in locations not typically considered for their geothermal resources (e.g., Louisiana, South Dakota). Additionally, using CO 2 effectively doubles the sedimentary basin geothermal resource base, equating to hundreds of gigawatts of new capacity, by enabling electricity generation in geologies that are otherwise (with water) too impermeable, too thin, too cold, or not deep enough. We find there is competition for the best sedimentary basin resources between water- and CO 2 -based power, but no overlap between the lowest-cost resources for CO 2 storage and CO 2 -based power. In this way, our results suggest that deploying CO 2 -based power may increase the cost of water based systems (by using the best resources) and the cost of CO 2 storage (by storing CO 2 in locations that otherwise may not be targeted). As such, our findings demonstrate that determining the best role for sedimentary basins within the energy transition may require balancing tradeoffs between competing priorities.

CPG↗

GeoRePORT Protocol Volume VI: Resource Size Assessment Tool

GeoRePORT is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat ("Resource Grade") and the progress of research and development over the lifetime of the project ("Project Progress"). Resource grade and project progress are reported for three assessment categories: geologic, technical, and socio-economic. Each category has specific criteria and guidelines for assessing both resource grade and project progress, as outlined in each of the following assessment tools (and associated colors): (1) Geological Assessment Tool (representative colors: reds, oranges, browns); (2) Technical Assessment Tool (representative colors: blues, purples); (3) Socio-Economic Assessment Tool (representative colors: greens, yellows). Additionally, users may need to estimate the project size (often reported in MWe or MWth). The resource size assessment tool (RSAT) is an essential addition to GeoRePORT due to the economic and legal context of geothermal development. In order to utilize a geothermal resource, a competitive Power Purchase Agreement (PPA), or similar, often must be obtained, for which the resource's power capacity must be demonstrated. To determine that a geothermal heat or power project is worthy of development, investors or other funding mechanisms often require information on the anticipated heat and/or power potential of the reservoir. They might also be interested in the certainty of that estimate. However, proving the existence and size of a geothermal resource is comparatively expensive and risky relative to other renewable technologies; it can cost developers 5 to 10 million USD to demonstrate a financially viable geothermal resource (Young et al. 2017). GeoRePORT aims to address this barrier to development by providing a consistent and clear assessment of resource quality and certainty. The RSAT will enable GeoRePORT users to not only qualitatively report on a given a resource, but also to compare standard methodologies for quantitatively estimating a resource size in terms of potential heat and/or power output.

15 GEOTHERMAL ENERGY↗

Efficient data-driven models for prediction and optimization of geothermal power plant operations

Increasing the capacity of geothermal energy as a renewable resource calls for development and deployment of efficient control and optimization technologies for geothermal power plants. A data-driven prediction and optimization model is presented as a cost-effective and efficient alternative to physics-based approach. The model predicts power output and operational cost by propagating the influence of control and disturbance variables within an artificial neural network (ANN). Numerical experiments with simulated and field data from a real geothermal power plant are first used to demonstrate the prediction performance of the ANN model. The model is then adopted to maximize the net predicted power production by automatically adjusting the working fluid circulation rate. The optimization performance of the model in evaluated using a thermodynamic flowsheet simulation model. The workflow is applied to model and control the effect of ambient temperature on an air-cooled binary cycle power plant, which is complex and costly to perform using a physics-based predictive model. As a result, the performance of the method is demonstrated by applying it to both simulated and field datasets from a binary cycle geothermal power plant.

15 GEOTHERMAL ENERGY↗

Technical Geothermal Roadmap for Indonesia

The technical geothermal roadmapping exercise described by this report is part of the NZW Collaborative Work Program with the Government of Indonesia. Indonesia currently has the second largest installed geothermal power generation capacity in the world and has abundant undeveloped resources that allow for continued expansion of its geothermal resource development, which can serve to contribute to the country’s goal of achieving net zero emissions for power generation by 2060. The DOE GeoVision study (2019) highlighted the importance of technical improvements as the key for accelerating the development of geothermal resources in the United States by reducing the costs and risks to make geothermal more competitive, and this also applies to Indonesia. The main objective of the roadmap is to identify and discuss key technical challenges and discuss how implementation of geothermal technology advances could reduce the risks, costs, and time associated with geothermal exploration and development activities and expand the potential resource base to include unconventional resource types, thus accelerating geothermal deployment in Indonesia.

15 GEOTHERMAL ENERGY↗

Renewable Energy Potential Model: Priority Geothermal Leasing Areas ReEDs Results

This dataset contains the results of a study conducted by the National Renewable Energy Laboratory (NREL) to identify potential future priority geothermal leasing areas on Bureau of Land Management (BLM) and United States Forest Service (USFS) lands. The analysis uses the Regional Energy Deployment System (ReEDS) model to evaluate geothermal resource potential under different scenarios of resource depth and technology combinations through the year 2050. The study considers geothermal resource potential, natural resource conflicts, and transmission access to categorize areas into near, mid, and far deployment priorities. The dataset includes outputs from the ReEDS model, such as geothermal capacity, generation, system costs, and emissions under various economic and technical scenarios. Favorability site data with geographic coordinates and site-specific attributes (e.g., resource favorability, land type) are also provided. Supporting resources include a technical report detailing methodologies and assumptions, along with a link to the ReEDS model GitHub repository, which requires GAMS and Python software for execution.

15 GEOTHERMAL ENERGY↗