The NSF/RANN FY 1975 program for geothermal resources research and technology

The specific goal of the NSF geothermal program is the rapid development by industry of the nation's geothermal resources that can be demonstrated to be commercially, environmentally and socially acceptable as alternate energy sources. NSF, as the lead agency for the federal geothermal energy research program, is expediting a program which encompasses the objectives necessary for significant utilization. These include: acceleration of exploration and assessment methods to identify commercial geothermal resources; development of innovative and improved technology to achieve economic feasibility; evaluation of policy options to resolve environmental, legal, and institutional problems; and support of experimental research facilities for each type of geothermal resource. Specific projects in each of these four objective areas are part of the NSF program for fiscal year 1975.

Kruger, P.↗

Geothermal research and development program of the US Atomic Energy Commission

Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

Werner, L. B.↗

The initiatives of the Los Alamos Scientific Laboratory in the transfer of a new excavation technology

A system for making vertical or horizontal holes in rock or soil by progressive local melting is described. In one operation the three major tasks of excavation are performed with the Subterrene concept: (1) rock fracturing; (2) debris removal; and (3) wall stabilization. Potential applications of the Subterrene system are indicated, with emphasis on extraction of geothermal energy and development of superconduction transmission lines for electrical power. A program in technology dissemination implemented by the staff members is described. It is indicated that a large scale commercial utilization of the technology is required to complete the transfer of technology.

Hanold, R. J.↗

The National Geothermal Energy Research Program

The continuous demand for energy and the concern for shortages of conventional energy resources have spurred the nation to consider alternate energy resources, such as geothermal. Although significant growth in the one natural steam field located in the United States has occurred, a major effort is now needed if geothermal energy, in its several forms, is to contribute to the nation's energy supplies. From the early informal efforts of an Interagency Panel for Geothermal Energy Research, a 5-year Federal program has evolved whose objective is the rapid development of a commercial industry for the utilization of geothermal resources for electric power production and other products. The Federal program seeks to evaluate the realistic potential of geothermal energy, to support the necessary research and technology needed to demonstrate the economic and environmental feasibility of the several types of geothermal resources, and to address the legal and institutional problems concerned in the stimulation and regulation of this new industry.

Green, R. J.↗

Rock melting technology and geothermal drilling

National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.

Rowley, J. C.↗

Proceedings of the Conference on Research for the Development of Geothermal Energy Resources

The proceedings of a conference on the development of geothermal energy resources are presented. The purpose of the conference was to acquaint potential user groups with the Federal and National Science Foundation geothermal programs and the method by which the users and other interested members can participate in the program. Among the subjects discussed are: (1) resources exploration and assessment, (2) environmental, legal, and institutional research, (3) resource utilization projects, and (4) advanced research and technology.

Source record↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗