Search NASA⌕ Search

SEARCH · Search NASA

Results for “ghp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Summary and Analysis of Responses to Surveys on Experience with GHP Installations in Federal Facilities and Minimum Qualifications of GHP-related Professionals

To increase customer confidence in geothermal heat pump (GHP) technology, reduce the potential of improperly installed GHP systems, and ensure the quality and performance of GHP installations, the Geothermal Heat Pump Consortium (GHPC, now known as the Geothermal Exchange Organization or GEO) is leading an effort to develop the first national certification standard for all primary personnel involved in the implementation of GHP systems. This standard will be developed through a collaborative methodology that solicits information and input from consumers, industry stakeholders, and professional and trade organizations to identify the required qualifications of all the primary personnel and incorporate this information into the standard.

GSHP National Survey↗

NREL GHP [Geothermal Heat Pump] Showcase: GHP Installation and Intensive in situ and Performance Monitoring at NREL's Solar Radiation and Research Laboratory; Preprint

This document provides an overview of the geothermal heat pump (GHP) showcase at NREL and how it will help the SRRL site move forward with the goal of being a model of sustainability within the NREL campus, providing an effective demonstration of GHP systems and needed space conditioning for laboratory expansion.

15 GEOTHERMAL ENERGY↗

CNCC Craig Campus Geothermal Project: 82-well closed loop GHP well field to provide geothermal energy as a common utilitiy for a new community college campus

Colorado Northwestern Community College (CNCC) is working collaboratively with recipient vendor Chevron Energy Solutions, an energy services company (ESCO), to develop an innovative GHP project at the new CNCC Campus constructed in 2010/2011 in Craig, Colorado. The purpose of the CNCC Craig Campus Geothermal Program scope was to utilize an energy performance contracting approach to develop a geothermal system with a shared closed-loop field providing geothermal energy to each building's GHP mechanical system. Additional benefits to the project include promoting good jobs and clean energy while reducing operating costs for the college. The project has demonstrated that GHP technology is viable for new construction using the energy performance contracting model. The project also enabled the project team to evaluate several options to give the College a best value proposition for not only the initial design and construction costs but build high performance facilities that will save the College for many years to come. The design involved comparing the economic feasibility of GHP by comparing its cost to that of traditional HVAC systems via energy model, financial life cycle cost analysis of energy savings and capital cost, and finally by evaluating the compatibility of the mechanical design for GHP compared to traditional HVAC design. The project shows that GHP system design can be incorporated into the design of new commercial buildings if the design teams, architect, contractor, and owner coordinate carefully during the early phases of design. The public also benefits because the new CNCC campus is a center of education for the much of Northwestern Colorado, and students in K-12 programs (Science Spree 2010) through the CNCC two-year degree programs are already integrating geothermal and GHP technology. One of the greatest challenges met during this program was coordination of multiple engineering and development stakeholders. The leadership of Principle Investigator Pres. John Boyd of CNCC met this challenge by showing clear leadership in setting common goals and resolving conflicts early in the program.

15 GEOTHERMAL ENERGY↗

Hybrid Solar GHP Simulator

This project provides an easy-to-use, menu-driven, software tool for designing hybrid solar-geothermal heat pump systems (GHP) for both heating- and cooling-dominated buildings. No such design tool currently exists. In heating-dominated buildings, the design approach takes advantage of glazed solar collectors to effectively balance the annual thermal loads on the ground with renewable solar energy. In cooling-dominated climates, the design approach takes advantage of relatively low-cost, unglazed solar collectors as the heat rejecting component. The primary benefit of hybrid GHPs is the reduced initial cost of the ground heat exchanger (GHX). Furthermore, solar thermal collectors can be used to balance the ground loads over the annual cycle, thus making the GHX fully sustainable; in heating-dominated buildings, the hybrid energy source (i.e., solar) is renewable, in contrast to a typical fossil fuel boiler or electric resistance as the hybrid component; in cooling-dominated buildings, use of unglazed solar collectors as a heat rejecter allows for passive heat rejection, in contrast to a cooling tower that consumes a significant amount of energy to operate, and hybrid GHPs can expand the market by allowing reduced GHX footprint in both heating- and cooling-dominated climates. The design tool allows for the straight-forward design of innovative GHP systems that currently pose a significant design challenge. The project lays the foundations for proper and reliable design of hybrid GHP systems, overcoming a series of difficult and cumbersome steps without the use of a system simulation approach, and without an automated optimization scheme. As new technologies and design concepts emerge, sophisticated design tools and methodologies must accompany them and be made usable for practitioners. Lack of reliable design tools results in reluctance of practitioners to implement more complex systems. A menu-driven software tool for the design of hybrid solar GHP systems is provided that is based on mathematically robust, validated models. An automated optimization tool is used to balance ground loads and incorporated into the simulation engine. With knowledge of the building loads, thermal properties of the ground, the borehole heat exchanger configuration, the heat pump peak hourly and seasonal COP for heating and cooling, the critical heat pump design entering fluid temperature, and the thermal performance of a solar collector, the total GHX length can be calculated along with the area of a supplemental solar collector array and the corresponding reduced GHX length. An economic analysis module allows for the calculation of the lowest capital cost combination of solar collector area and GHX length.

Yavuzturk, Cy↗

End Use Load Profile (EULP) of US Building Sector resulting from mass GHP retrofits

This collection of datasets describes the change (difference) in hourly energy consumption of the U.S. residential and commercial building stock while replacing existing HVAC systems with ground source heat pumps for all the balancing areas in the US, for all buildings eligible for ground source heat pump replacement. Additional county-level data may be requested from the DOE Project Lead.

15 GEOTHERMAL ENERGY↗

Geothermal Academy: Focus Center for Data Collection, Analysis, and Dissemination

Geothermal Academy: A Pathway for Confirmation of Ground-Source Heat Pumps in the United States. In 2008, Oak Ridge National Laboratory issued a report on geothermal heats pumps (GHPs) focused on the market status, barriers to adoption, and actions to overcome these barriers (Hughes 2008). Of the barriers raised in this report, of the most pressing is the lack of performance and energy usage data for GHPs. Further, an associated barrier is a lack of a fair comparison of the energy usage of conventional heating and cooling systems for the same building. Because of these barriers, we are not able to say how much energy is used by well-designed GHP systems on a long-term basis, nor are we able to say how better their energy usage is compared to conventional systems. The need for a fair comparison with conventional systems is particularly relevant as modern versions of conventional air conditioners, gas furnaces, and boilers have also incorporated energy saving technologies. As a first step to address this barrier, the Geothermal Academy has developed a framework for data collection. This framework has already been applied to several geothermal installations in Colorado (Nakagawa etal. 2010). The framework classifies data into different categories based on the relevance of the dat to understanding the energy consumption of a GHP system. The categories are: direct energy consumption data, heat exchange performance data, and GHP design parameter data. The main recommendation of this project is to include a minimal data collection system on each heat pump installed in the U.S., capable of measuring the electrical energy consumed, the entering/exiting fluid temperatures, and circulation rates. This is a viable and cost effective solution which will provide performance data, as data collection systems are only a fraction of the cost of a GHP unit and modern GHP units already incorporate sensors to monitor energy usage and the entering and exiting fluid temperatures. Specifically, these sensors are used to control the GHP unit to provide the heat exchange required to provide a desired temperature within a building. Accordingly, it is straightforward for this operational data to be collected to start building a database of GHP performance such that can provide statistically relevant comparison with other heating and cooling systems. In addition to collecting the data, such a system could be easily implemented with a wireless transmitter so that data could be sent to a home PC where it could be transmitted to a central database. Display of the data on a user's PC would provide feedback on the performance of their system which could perhaps refine their use of the system to reach their personal energy goals. Although a system such as that described above has yet to be incorporated directly into commercial GHP systems, it is straightforward and inexpensive to outfit a GHP with a data acquisition system and supplemental sensors. A secondary recommendation is to consider funding a pilot effort that will collect the energy and performance time series data from a representative sample of installations. A preliminary pilot effort was undertaken by the Geothermal Academy at a middle school in Ft. Collins, Colorado, which demonstrated the feasibility and ease of such an effort. A full-scale pilot effort would be most suited to evaluate the performance of GHP installations in different climate settings, preferably focusing on residential, commercial, and public buildings. If a full-scale pilot effort were to be undertaken, it is recommended to also identify large buildings which may incorporate a back-up conventional heating and cooling system in order to provide statistically relevant comparison data to assess the improvement in GHP energy usage over other heating and cooling technologies. Such a data collection system would provide several benefits to the different sectors of society (consumers, installers, policy makers, researchers, utility companies, government regulators) which are concerned with GHP technology and implementation.

15 GEOTHERMAL ENERGY↗

National Certification Standard for Ground Source Heat Pump Personnel

The National Certification Standard for the Geothermal Heat Pump Industry adds to the understanding of the barriers to rapid growth of the geothermal heat pump (GHP) industry by bringing together for the first time an analysis of the roles and responsibilities of each of the individual job tasks involved in the design and installation of GHP systems. The standard addresses applicable qualifications for all primary personnel involved in the design, installation, commissioning, operation and maintenance of GHP systems, including their knowledge, skills and abilities. The resulting standard serves as a foundation for subsequent development of curriculum, training and certification programs, which are not included in the scope of this project, but are briefly addressed in the standard to describe ways in which the standard developed in this project may form a foundation to support further progress in accomplishing those other efforts. Follow-on efforts may use the standard developed in this project to improve the technical effectiveness and economic feasibility of curriculum development and training programs for GHP industry personnel, by providing a more complete and objective assessment of the individual job tasks necessary for successful implementation of GHP systems. When incorporated into future certification programs for GHP personnel, the standard will facilitate increased consumer confidence in GHP technology, reduce the potential for improperly installed GHP systems, and assure GHP system quality and performance, all of which benefit the public through improved energy efficiency and mitigated environmental impacts of the heating and cooling of homes and businesses.

15 GEOTHERMAL ENERGY↗

Analysis & Tools to Spur Increased Deployment of “Waste Heat” Rejection/Recycling Hybrid Ground-source Heat Pump Systems in Hot, Arid or Semiarid Climates Like Texas

This project team analyzed supplemental heat rejection/recovery (SHR) devices or systems that could be used in hybrid ground source heat pump (HGHP) systems located in arid or semi-arid regions in southwestern U.S. Identification of effective SHR solutions would enhance the deployment of ground source heat pumps (GHP) in these regions. In a parallel effort, the team developed integrated GHP models that coupled the building load, heat pump, and ground loop subsystems and which could be applied to residential and commercial office buildings. Then GHP and HGHP performances could be compared in terms of operational performance and life-cycle costs. Several potential SHR devices were analyzed by applying two strategies: 1) to remove heat directly from the water in the ground loop before it enters the ground and 2) to remove heat in the refrigerant loop of the vapor compression cycle (VCC) of the heat pump so less heat is transferred to the water loop at the condenser of the VCC. Cooling towers, adsorption coolers, and thermoelectric liquid coolers were included in strategy 1, and expanded desuperheaters, thermosyphons, and an optimized VCC were included in strategy 2. Of all SHR devices analyzed, only the cooling tower provided a cost-effective performance enhancement. For the integrated GHP model, the project team selected the building load model HAMBASE and its powerful computational Simulink/MatLab platform, empirical performance map models of the heat pumps based upon manufacturers’ performance data, and a ground loop model developed by Oklahoma State University and rewritten for this project in Simulink/MatLab. The design process used GLHEPRO, also from Oklahoma State University, to size the borehole fields. The building load and ground loop models were compared with simulations from eQuest, ASHRAE 140-2008 standards, EnergyPlus, and GLHEPRO and were found to predict those subsystems’ performance well. The integrated GHP model was applied to a 195m 2 (2100ft 2 ) residential building and a 4,982m 2 (53,628ft 2 ) three-story commercial office building, and it ran 10-15 year simulations. The integrated GHP model and its Simulink platform provided residential data, ranging from seconds to years, and commercial office building data, ranging from minutes to years. A cooling tower model was coupled to the base case integrated GHP model for the residential building and the resulting HGHP system provided a cost-effective solution for the Austin, TX location. Simulations for both the residential and commercial building models were run with varying degrees of SHR (device/system not identified) and the results were found to significantly decrease installation costs, increase heat pump efficiency (lower entering water temperature), and prolong the lifetime of the borehole field. Lifetime cycle costs were estimated from the simulation results. Sensitivity studies on system operating performance and lifetime costs were performed on design parameters, such as construction materials, borehole length, borehole configuration and spacing, grout conductivity, and effects of SHR. While some of the results are intuitive, these studies provided quantitative estimates of improved performance and cost. One of the most important results of this sensitivity study is that overall system performance is very sensitive to these design parameters and that modeling and simulation are essential tools to design cost-effective systems.

15 GEOTHERMAL ENERGY↗

Analysis of Ground Source Heat Pump ECMs: Implemented Under DOE ESPC IDIQ Contract

Several federal performance and decarbonization objectives are driving the U.S. government to transition to net-zero emissions across the federal building portfolio. The overarching purpose of this Federal Energy Management Program (FEMP)-Geothermal Technologies Office (GTO) work is to support federal facilities in accomplishing the administration’s federal building decarbonization goals. Creating awareness of existing geothermal (or ground-source) heat pump (GHP) systems deployed on federal property, implemented using performance contracts and evaluating the energy and environmental impacts of these systems, this work will assist federal facilities in considering inclusion of GHP technology energy conservation measures (ECMs) in future performance contracting project awards. This report summarizes analyses of data from GHP ECMs installed under the DOE ESPC IDIQ contract across various climate areas and geographic locations, agencies, and building use types. Through the analysis of proposed GHP ECMs and understanding key metrics on implemented GHP systems in a variety of applications, FEMP and GTO can further support federal agencies in meeting decarbonization and net-zero building goals by evaluating and incorporating GHP systems into performance contracts and communicate the benefits of this technology.

15 GEOTHERMAL ENERGY↗

Projected impacts of climate change on hydropower potential in China

Hydropower is an important renewable energy source in China, but it is sensitive to climate change, because the changing climate may alter hydrological conditions (e.g., river flow and reservoir storage). Future changes and associated uncertainties in China's gross hydropower potential (GHP) and developed hydropower potential (DHP) are projected using simulations from eight global hydrological models (GHMs), including a large-scale reservoir regulation model, forced by five general circulation models (GCMs) with climate data under two representative concentration pathways (RCP2.6 and RCP8.5). Results show that the estimation of the present GHP of China is comparable to other studies; overall, the annual GHP is projected to change by -1.7 to 2 % in the near future (2020–2050) and increase by 3 to 6 % in the late 21st century (2070–2099). The annual DHP is projected to change by -2.2 to -5.4 % (0.7–1.7 % of the total installed hydropower capacity (IHC)) and -1.3 to -4 % (0.4–1.3 % of total IHC) for 2020–2050 and 2070–2099, respectively. Regional variations emerge: GHP will increase in northern China but decrease in southern China – mostly in south central China and eastern China – where numerous reservoirs and large IHCs currently are located. The area with the highest GHP in southwest China will have more GHP, while DHP will reduce in the regions with high IHC (e.g., Sichuan and Hubei) in the future. The largest decrease in DHP (in %) will occur in autumn or winter, when streamflow is relatively low and water use is competitive. Large ranges in hydropower estimates across GHMs and GCMs highlight the necessity of using multimodel assessments under climate change conditions. This study prompts the consideration of climate change in planning for hydropower development and operations in China, to be further combined with a socioeconomic analysis for strategic expansion.

13 HYDRO ENERGY↗

System Modeling and Building Energy Simulations of Gas Engine Driven Heat Pump

To improve the system performance of a gas engine driven heat pump (GHP) system, an analytical modeling and experimental study has been made by using desiccant system in cooling operation (particularly in high humidity operations) and suction line waste heat recovery to augment heating capacity and efficiency. The performance of overall GHP system has been simulated with a detailed vapor compression heat pump system design model. The modeling includes: (1) GHP cycle without any performance improvements (suction liquid heat exchange and heat recovery) as a baseline (both in cooling and heating mode), (2) the GHP cycle in cooling mode with desiccant system regenerated by waste heat from engine incorporated, (3) GHP cycle in heating mode with heat recovery (recovered heat from engine). According to the system modeling results, by using the desiccant system the sensible heat ratio (SHR- sensible heat ratio) can be lowered to 40%. The waste heat of the gas engine can boost the space heating efficiency by 25% at rated operating conditions. In addtion,using EnergyPlus, building energy simulations have been conducted to assess annual energy consumptions of GHP in sixteen US cities, and the performances are compared to a baseline unit, which has a electrically-driven air conditioner with the seasonal COP of 4.1 for space cooling and a gas funace with 90% fuel efficiency for space heating.

building energy simulation↗

Challenges and Opportunities of Gas Engine Driven Heat Pumps: Two Case Studies

Gas engine driven heat pumps (GHP) currently hold a small market share. This share is considerably smaller than what the full potential of GHP technology can realize. Of the main benefits of the GHP technology is their better primary energy utilization mainly due to the ability to recover the engine heat. However, development and market penetration of GHP technology have been challenged by various market and technical barriers. The main barriers are the high initial cost, low awareness of the technology, and poor perception. On the other hand, several opportunities arise that the GHP technology can take advantage of to increase its market share. The most direct opportunity is the abundance of cheap natural gas. This translates directly into monetary savings and higher ROI. GHPs offer the advantage of reducing the peak demand by 80% compared to electric counterpart. From the point of view of utilities, this eliminates the need for lower-efficiency peaking power plants and over-expansion only to cover maximum peak times. From the point of view of renewable customers, GHPs eliminate the need to buy power from the grid at a high price. This is especially important in hot climates with high cooling loads. When built and operated as distributed generation, GHPs can improve the reliability of power delivery to consumers. The paper discusses the challenges and opportunities as seen during the development and commercialization of two different GHP products; a 10-ton packaged unit and 5-ton split unit.

Abu-Heiba, Ahmad↗

Development and Preliminary Analysis of a U.S. Geothermal Heat Pump Installation Database

This paper seeks to addresses the significant gap in the literature regarding the installation and adoption of geothermal heat pump (GHP) systems in the United States. While the "2021 U.S. Geothermal Power Production and District Heating Market Report" published by the National Renewable Energy Laboratory (NREL) focused on direct-use geothermal district heating systems, it did not include an analysis of GHP installations (Robins et al. 2021). To bridge this gap, NREL has compiled a novel database currently containing 70,470 records of GHP installations, primarily sourced from state well permits and small-scale studies. Our methodology emphasizes the collection, cleaning, and standardization of data, addressing challenges such as inconsistent reporting formats and privacy concerns. Despite limitations in data on capacity, costs, and performance, our preliminary geospatial analysis reveals insights into the distribution of GHP systems across urban and rural areas and climate zones. The paper highlights the importance of publicly accessible data for advancing GHP technology adoption with a discussion of existing data sources and their limitations, advocating for improved collaboration between NREL and industry stakeholders.

data collection↗

Impact analysis of heating electrification in US buildings with geothermal heat pumps

Few studies have investigated the impacts of large-scale deployment of geothermal heat pumps (GHPs, also called ground source heat pumps) on the electric grid. GHPs utilize the ground as a heat source to warm buildings more efficiently than other space-heating systems. The coupling with the ground offers seasonal thermal storage so that GHPs can also cool buildings in summer more efficiently than other space-cooling systems. This study simulated the performance of GHP systems for various commercial and residential buildings in 15 climate zones in the United States. Combined with the latest End-Use Load Profiles of the US building stock and grid modeling, this study aims to assess the impacts of a national deployment of GHP systems on the US electric grid in terms of energy consumption, emissions, and operational resilience. The preliminary results show that the GHP deployment can save 429 billion kWh of electricity (a 19% reduction from baseline) and reduce carbon emissions by 496 million tons per year (a 31 % reduction from baseline). A geographical view of the results indicates that retrofitting existing HVAC systems with new GHP systems can lead to further reductions in annual electricity consumption and peak electricity demand in the southern regions of the United States than in other parts of the country. On the other hand, GHP retrofits result in higher percentages of site energy savings and carbon emission reduction in the north (cold climates) than in the south (warm climates).

Liu, Xiaobing↗

System Modeling of Gas Engine Driven Heat Pump

To improve the system performance of the GHP, modeling and experimental study has been made by using desiccant system in cooling operation (particularly in high humidity operations) and suction line waste heat recovery to augment heating capacity and efficiency. The performance of overall GHP system has been simulated by using ORNL Modulating Heat Pump Design Software, which is used to predict steady-state heating and cooling performance of variable-speed vapor compression air-to-air heat pumps for a wide range of operational variables. The modeling includes: (1) GHP cycle without any performance improvements (suction liquid heat exchange and heat recovery) as a baseline (both in cooling and heating mode), (2) the GHP cycle in cooling mode with desiccant system regenerated by waste heat from engine incorporated, (3) GHP cycle in heating mode with heat recovery (recovered heat from engine). According to the system modeling results, by using desiccant system regenerated by waste heat from engine, the SHR can be lowered to 40%. The waste heat of the gas engine can boost the space heating efficiency by 25% in rated operating conditions.

Gas Driven Heat Pump↗