Direct Insertion Ground Loop Heat Exchanger
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Purpose: To counter the deleterious effects of weightlessness on the cardiopulmonary system, astronauts living on the International Space Station exercise on a variety of countermeasure equipment including the Cycle Ergometer Vibration Isolation and Stabilization System (CEVIS). Operational since 2001, the onboard CEVIS will be replaced by a new model, known as Teal CEVIS (TC). As a part of ground evaluation, TC hardware underwent human-in-the-loop (HITL) testing to verify the TC hardware produces workloads that elicit physiologic responses comparable to a laboratory cycle ergometer (LAB). Methods: Seven subjects (5 M/2 F) performed submaximal cycle ergometer testing with indirect calorimetry measures on TC and LAB on separate test days. Testing consisted of graded 30 watt increases in workload until subjects reached 85% of age-predicted max heart rate (HR). Exercise outcomes included rate of oxygen uptake (VO2; liters/min), rate of energy expenditure (REE; kcal/min), and HR (beats/min). Linear mixed models (LMM) were fitted to compare VO2, REE, and HR responses between devices across power outputs with fixed effects for power (P) and device (D) and with random effects for subject. LMM effect coefficients (β), std errors (SE), pseudo-partial R2 of effects (pR2), and model likelihood ratio statistics (χ2, Pr(> chisq); α<.05) are provided. Results: LMM main effects for P and D were observed for VO2 (βp=.0107, SE = .0002, pR2=0.97; βd = -0.075, SE = 0.019, pR2=0.14; χ2(1)= 13.57, p<.001), such that VO2 was higher across stages on TC. Main effects of P and D were observed for REE (βp= .0586, SE = 0.001, pR2= 0.97; βd = -0.33208, SE = 0.099, pR2= 0.056; χ2(1)=10.481, p < .01), such that REE was higher across power outputs on TC. A P x D interaction was observed for HR, along with main effects for P and D (βp x d =-0.048, SE = 0.02, pR2=0.048; βp= 0.42, SE = 0.016, pR2=0.87; χ2(1) = 5.398, p = 0.02), such that higher workloads elicited a greater difference in HR between devices. Conclusions: HITL results show, TC elicits greater physiologic responses across power outputs compared to LAB. However, pR2 for device effects show small differences between devices. Therefore, TC can be expected to provide appropriate physiological stimulus across workloads and be considered a reliable tool to mitigate the effects of weightlessness.
Systems for very long-duration human missions to Mars will be designed to operate reliably for many years and many of these systems will never be returned to Earth. The need for high reliability is driven by the requirement for safe functioning of remote, long-duration crewed systems and also by unsympathetic abort scenarios. Abort from a Mars mission could be as long as 450 days to return to Earth. The key to developing a human-in-the-loop architecture is a development process that allows for a logical sequence of validating successful development in a stepwise manner, with assessment of key performance parameters (KPPs) at each step; especially important are KPPs for technologies evaluated in a full systems context with human crews on Earth and on space platforms such as the ISS. This presentation will explore the implications of such an approach to technology development and validation including the roles of ground and space-based testing necessary to develop a highly reliable system for long duration human exploration missions. Historical development and systems testing from Mercury to the International Space Station (ISS) to ground testing will be reviewed. Current work as well as recommendations for future work will be described.
This paper is concerned with the application of optimal estimation and control concepts to the ground alignment of inertial platforms subjected to random sway motion. A seventh-order Kalman filter has been designed for estimating the platform misalignments and sway motion. Using the linear quadratic optimal regulator techniques, feedback controller gains have been designed to drive the initial misalignments to a small value. A reconfiguration of the filter controller scheme has been proposed and verified by Monte Carlo simulation for improving the speed of alignment without changing the alignment accuracy.
PhD project update for Graduate advisor at Texas Tech University.
This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.
This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.
This paper presents monthly performance metrics of a 7.56 kW (2.16 ton) GSHP serving the space conditioning loads of a 251m2 (2700ft2) residential home with a phase change material in its envelope, and a single vertical-bore 94.5m (310 ft) ground loop. The same ground loop also serviced a ground source heat pump water heater. Envelope characteristics are discussed briefly in the context of reducing thermal losses. Data on entering water temperatures, energy extracted from the ground, energy delivered/removed, compressor electricity use, COP, GSHP run times (low and high compressor stages), and the impact of fan and pump energy consumption on efficiency are presented for each month. Both practical as well as research and development issues are discussed. The findings suggest that GSHPs represent a practical technology option to reduce source energy reduction and greenhouse emissions under the IECC 2012 Standard, as well as the European Union (EU) 2020 target of generating over 25% of heat consumed in the EU from renewable energy.
The goal of this project was to assess the feasibility of utilizing mine water as a heat sink for a geothermal heat pump system to heat and cool the 74,000 sq. ft. Illinois National Guard State Headquarters’ building in Springfield Illinois. If successful, this type of system would be less expensive to install than a traditional closed loop geothermal (ground source) heat pump system by significantly reducing the size of the well field, thus shortening or eliminate the payback period compared to a conventional system. In the end, a conventional ground loop was used for the project.
The report presents the results of the development and field testing of a mobile test facility based on a helical magnetic cumulative generator (MCGTF). The system is designed for full-scale modeling of lightning currents to study the safety of power plants of any type, including nuclear power plants. Advanced technologies of high-energy physics for solving both engineering and applied problems underlie this pilot project. The energy from the magnetic cumulative generator (MCG) is transferred to a high-impedance load with high efficiency of more than 50% using pulse transformer coupling. Modeling of the dynamics of the MEG that operates in a circuit with lumped parameters allows one to apply the law of inductance output during operation of the MCG, thus providing the required front of the current pulse in the load without using any switches. The results of field testing of the MCGTF are presented for both the ground loop and the model load. The ground loop generates a load resistance of 2–4 Ω. In the tests, the ohmic resistance of the model load is 10 Ω. It is shown that the current pulse parameters recorded in the resistive-inductive load are close to the calculated values.
The ground source heat pump (GSHP) system is one of the most energy efficient HVAC technologies in the current market. However, the heat imbalance may degrade the ability of the ground loop heat exchanger (GLHX) to absorb or reject heat. The hybrid GSHP system, which combines a geothermal well field with a supplemental boiler or cooling tower, can balance the loads imposed on the ground loop heat exchangers to minimize its size while retaining superior energy efficiency. This paper presents a recent simulation-based study with an intention to compare multiple common control strategies used in hybrid GSHP systems, including fixed setpoint, outside air reset, load reset, and wetbulb reset. A small office in Oklahoma City conditioned by a hybrid GSHP system was simulated with the latest version of eQUEST 3.7[1]. The simulation results reveal that the hybrid GSHP system has the excellent capability to meet the cooling and heating setpoints during the occupied hours, balance thermal loads on the ground loop, as well as improve the thermal comfort of the occupants with the undersized well field.
The ground source heat pump (GSHP) system is one of the most energy efficient HVAC technologies in the current market. However, the heat imbalance may degrade the ability of the ground loop heat exchanger (GLHX) to absorb or reject heat. The hybrid GSHP system, which combines a geothermal well field with a supplemental boiler or cooling tower, can balance the loads imposed on the ground loop heat exchangers to minimize its size while retaining superior energy efficiency. This paper presents a recent simulation-based study with an intention to compare multiple common control strategies used in hybrid GSHP systems, including fixed setpoint, outside air reset, load reset, and wetbulb reset. A small office in Oklahoma City conditioned by a hybrid GSHP system was simulated with the latest version of eQUEST 3.7 [1]. In the end, the simulation results reveal that the hybrid GSHP system has the excellent capability to meet the cooling and heating setpoints during the occupied hours, balance thermal loads on the ground loop, as well as improve the thermal comfort of the occupants with the reduced size well field.
This project was initiated at a time when ground coupled heat pump systems in this region were limited in size and quantity. There were economic pressures with costs for natural gas and electric utilities that had many organizations considering ground coupled heat pumps; The research has added to the understanding of how ground temperatures fluctuate seasonally and how this affects the performance and operation of the heat pumps. This was done by using a series of temperature sensors buried within the middle of one of the vertical bore fields with sensors located at various depths below grade. Trending of the data showed that there is a lag in ground temperature with respect to air temperatures in the shoulder months, however as full cooling and heating season arrives, the heat rejection and heat extraction from the ground has a significant effect on the ground temps; Additionally it is better understood that while a large community geothermal bore field serving multiple buildings does provide a convenient central plant to use, it introduces complexity of not being able to easily model and predict how each building will contribute to the loads in real time. Additional controllers and programming were added to provide more insight into this real time load profile and allow for intelligent shedding of load via a dry cooler during cool nights in lieu of rejecting to the ground loop. This serves as a means to ‘condition’ the ground loop and mitigate thermal creep of the field, as is typically observed; and It has been observed when compared to traditional heating and cooling equipment, there is still a cost premium to use ground source heat pumps that is driven mostly by the cost for vertical bore holes. Horizontal loop systems are less costly to install, but do not perform as well in this climate zone for heating mode
Buildings consume large amounts of energy for heating and cooling, while peak electricity demand places significant stress on the power grid. This paper presents a reduced-order co-simulation framework and load-oriented supervisory control strategy for a geothermal-integrated thermally anisotropic building envelope with a ground loop (TABE+GL). In TABE+GL, a hydronic loop embedded in the building envelope is directly coupled with a geothermal ground loop, allowing for bidirectional heat exchange between the envelope, the ground, and the indoor environment. A hybrid co-simulation framework was established by coupling a reduced-order resistor–capacitor (RC) thermal network model with EnergyPlus augmented with GHEDesigner modules. The RC model generated feasible heat flux options under three operating modes, and EnergyPlus predicted sensible loads, energy use, and pump energy demand. At each simulation step, a supervisory control algorithm selected the optimal loop configuration and duty factor that maximizes useful TABE geothermal utilization without exceeding the predicted sensible load, thereby avoiding overheating or cooling. Case studies were conducted for Los Angeles, California, Charleston, South Carolina, and Denver, Colorado. Results showed that the proposed framework reduced HVAC electricity consumption by 43%–67%, natural gas use for space heating by 11%–38%, and peak electricity demand by 43%–88%. These results highlight the potential of combining reduced-order envelope modeling, direct geothermal coupling, and load-oriented supervisory control to improve whole building energy performance and reduce peak demand across diverse weather conditions.
Under the American Recovery and Reinvestment Act (ARRA), 26 ground source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects was proposed by Montana Tech of the University of Montana for a 56,000 sq ft, newly constructed, on-campus research facility – the Natural Resources Building (NRB) located in Butte, Montana. This demonstrated GSHP system consists of a 50 ton water-to-water heat pump and a closed-loop ground heat exchanger with two redundant 7.5 hp constant-speed pumps to use water in the nearby flooded mines as a heat source or heat sink. It works in conjunction with the originally installed steam HX and an air-cooled chiller to provide space heating and cooling. It is coupled with the existing hot water and chilled water piping in the building and operates in the heating or cooling mode based on the outdoor air temperature. The ground loop pumps operate in conjunction with the existing pumps in the building hot and chilled water loops for the operation of the heat pump unit. The goal of this demonstration project is to validate the technical and economic feasibility of the demonstrated commercial-scale GSHP system in the region, and illustrate the feasibility of using mine waters as the heat sink and source for GSHP systems. Should the demonstration prove satisfactory and feasible, it will encourage similar GSHP applications using mine water, thus help save energy and reduce carbon emissions. The actual performance of the system is analyzed with available measured data for January through July 2014. The annual energy performance is predicted and compared with a baseline scenario, with the heating and cooling provided by the originally designed systems. The comparison is made in terms of energy savings, operating cost savings, cost-effectiveness, and environmental benefits. Finally, limitations in conducting the analysis are identified and recommendations for improvement in the control and operation of such systems are made.
Grounding related issues are critical for safe and reliable operation of solid-state transformer (SST) in medium-voltage (MV) applications, e.g., solar photovoltaic and energy storage integration, date center, electric vehicle fast charging, etc. This article presents for the first time the issue of additional device voltage stress due to grounding-loop current in current-source SST, using the soft-switching solid-state transformer (S4T) as an example. The S4T features single-stage isolated AC-AC, AC-DC, or DC-DC conversion with full-range ZVS, derived from flyback converter or current-source converter (CSC). However, the flyback operation for CSC-based SST means that magnetizing current flows through the reverse-blocking devices on only one side of the medium-frequency transformer (MFT) at a time. Then, the voltages across the devices, especially those on the other side of the MFT, can be influenced by parasitic current. A parasitic model of a modular S4T (M-S4T) prototype is developed from direct measurements and datasheets. Using the developed parasitic model and equivalent circuits, the causes of the voltage stress are analyzed. A voltage-stress mitigation scheme of connecting additional grounding capacitors is proposed. Damping resistors are also installed to damp out the grounding-loop resonance. A robust parameter design of the proposed scheme is given. The existence of the voltage stress issue and the effectiveness of the proposed scheme are verified experimentally on an MV SiC M-S4T prototype with inherent parameter variations among the five modules in the prototype. Here, both single-module and stacked-module operation are demonstrated during steady state and dynamic conditions up to 4 kV peak.
Data Management for the Mars Exploration Rovers (MER) project is a comprehensive system addressing the needs of development, test, and operations phases of the mission. During development of flight software, including the science software, the data management system can be simulated using any POSIX file system. During testing, the on-board file system can be bit compared with files on the ground to verify proper behavior and end-to-end data flows. During mission operations, end-to-end accountability of data products is supported, from science observation concept to data products within the permanent ground repository. Automated and human-in-the-loop ground tools allow decisions regarding retransmitting, re-prioritizing, and deleting data products to be made using higher level information than is available to a protocol-stack approach such as the CCSDS File Delivery Protocol (CFDP).