Search NASA⌕ Search

SEARCH · Search NASA

Results for “ground loop”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Ground Loop

Presentation providing update on diagnostic test bed.

Aponte, Ivan A.↗

Building America Case Study: Simplified Air Distribution, Desuperheaters, and Sub-Slab Geothermal Heat Exchangers, Pittsburgh, Pennsylvania

This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.

Building America↗

Building America Case Study: Simplified Air Distribution, Desuperheaters, and Sub-Slab Geothermal Heat Exchangers, Pittsburgh, Pennsylvania

This report presents a cold-climate project that examines an alternative approach to ground source heat pump (GSHP) ground loop design. The innovative ground loop design is an attempt to reduce the installed cost of the ground loop heat exchange portion of the system by containing the entire ground loop within the excavated location beneath the basement slab.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MEASURED SPACE CONDITIONING PERFORMANCE OFA VERTICAL-BORE GROUND SOURCE HEAT PUMP (GSHP) OVER TWELVE MONTHS UNDER SIMULATED OCCUPANCY LOADS

This paper presents monthly performance metrics of a 7.56 kW (2.16 ton) GSHP serving the space conditioning loads of a 251m2 (2700ft2) residential home with a phase change material in its envelope, and a single vertical-bore 94.5m (310 ft) ground loop. The same ground loop also serviced a ground source heat pump water heater. Envelope characteristics are discussed briefly in the context of reducing thermal losses. Data on entering water temperatures, energy extracted from the ground, energy delivered/removed, compressor electricity use, COP, GSHP run times (low and high compressor stages), and the impact of fan and pump energy consumption on efficiency are presented for each month. Both practical as well as research and development issues are discussed. The findings suggest that GSHPs represent a practical technology option to reduce source energy reduction and greenhouse emissions under the IECC 2012 Standard, as well as the European Union (EU) 2020 target of generating over 25% of heat consumed in the EU from renewable energy.

Exergy↗

Geothermal Retrofit of Illinois National Guard's State headquarters Building

The goal of this project was to assess the feasibility of utilizing mine water as a heat sink for a geothermal heat pump system to heat and cool the 74,000 sq. ft. Illinois National Guard State Headquarters’ building in Springfield Illinois. If successful, this type of system would be less expensive to install than a traditional closed loop geothermal (ground source) heat pump system by significantly reducing the size of the well field, thus shortening or eliminate the payback period compared to a conventional system. In the end, a conventional ground loop was used for the project.

15 GEOTHERMAL ENERGY↗

A mobile test facility based on a magnetic cumulative generator to study the stability of the power plants under impact of lightning currents

The report presents the results of the development and field testing of a mobile test facility based on a helical magnetic cumulative generator (MCGTF). The system is designed for full-scale modeling of lightning currents to study the safety of power plants of any type, including nuclear power plants. Advanced technologies of high-energy physics for solving both engineering and applied problems underlie this pilot project. The energy from the magnetic cumulative generator (MCG) is transferred to a high-impedance load with high efficiency of more than 50% using pulse transformer coupling. Modeling of the dynamics of the MEG that operates in a circuit with lumped parameters allows one to apply the law of inductance output during operation of the MCG, thus providing the required front of the current pulse in the load without using any switches. The results of field testing of the MCGTF are presented for both the ground loop and the model load. The ground loop generates a load resistance of 2–4 Ω. In the tests, the ohmic resistance of the model load is 10 Ω. It is shown that the current pulse parameters recorded in the resistive-inductive load are close to the calculated values.

42 ENGINEERING↗

Recovery act: development of design and simulation tool for hybrid geothermal heat pump system

The ground source heat pump (GSHP) system is one of the most energy efficient HVAC technologies in the current market. However, the heat imbalance may degrade the ability of the ground loop heat exchanger (GLHX) to absorb or reject heat. The hybrid GSHP system, which combines a geothermal well field with a supplemental boiler or cooling tower, can balance the loads imposed on the ground loop heat exchangers to minimize its size while retaining superior energy efficiency. This paper presents a recent simulation-based study with an intention to compare multiple common control strategies used in hybrid GSHP systems, including fixed setpoint, outside air reset, load reset, and wetbulb reset. A small office in Oklahoma City conditioned by a hybrid GSHP system was simulated with the latest version of eQUEST 3.7[1]. The simulation results reveal that the hybrid GSHP system has the excellent capability to meet the cooling and heating setpoints during the occupied hours, balance thermal loads on the ground loop, as well as improve the thermal comfort of the occupants with the undersized well field.

15 GEOTHERMAL ENERGY↗

Comparative study of control strategies for hybrid GSHP system in the cooling dominated climate

The ground source heat pump (GSHP) system is one of the most energy efficient HVAC technologies in the current market. However, the heat imbalance may degrade the ability of the ground loop heat exchanger (GLHX) to absorb or reject heat. The hybrid GSHP system, which combines a geothermal well field with a supplemental boiler or cooling tower, can balance the loads imposed on the ground loop heat exchangers to minimize its size while retaining superior energy efficiency. This paper presents a recent simulation-based study with an intention to compare multiple common control strategies used in hybrid GSHP systems, including fixed setpoint, outside air reset, load reset, and wetbulb reset. A small office in Oklahoma City conditioned by a hybrid GSHP system was simulated with the latest version of eQUEST 3.7 [1]. In the end, the simulation results reveal that the hybrid GSHP system has the excellent capability to meet the cooling and heating setpoints during the occupied hours, balance thermal loads on the ground loop, as well as improve the thermal comfort of the occupants with the reduced size well field.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pioneering Heat Pump Project

This project was initiated at a time when ground coupled heat pump systems in this region were limited in size and quantity. There were economic pressures with costs for natural gas and electric utilities that had many organizations considering ground coupled heat pumps; The research has added to the understanding of how ground temperatures fluctuate seasonally and how this affects the performance and operation of the heat pumps. This was done by using a series of temperature sensors buried within the middle of one of the vertical bore fields with sensors located at various depths below grade. Trending of the data showed that there is a lag in ground temperature with respect to air temperatures in the shoulder months, however as full cooling and heating season arrives, the heat rejection and heat extraction from the ground has a significant effect on the ground temps; Additionally it is better understood that while a large community geothermal bore field serving multiple buildings does provide a convenient central plant to use, it introduces complexity of not being able to easily model and predict how each building will contribute to the loads in real time. Additional controllers and programming were added to provide more insight into this real time load profile and allow for intelligent shedding of load via a dry cooler during cool nights in lieu of rejecting to the ground loop. This serves as a means to ‘condition’ the ground loop and mitigate thermal creep of the field, as is typically observed; and It has been observed when compared to traditional heating and cooling equipment, there is still a cost premium to use ground source heat pumps that is driven mostly by the cost for vertical bore holes. Horizontal loop systems are less costly to install, but do not perform as well in this climate zone for heating mode

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Geothermal-integrated thermally anisotropic building envelope for energy and peak-demand reduction

Buildings consume large amounts of energy for heating and cooling, while peak electricity demand places significant stress on the power grid. This paper presents a reduced-order co-simulation framework and load-oriented supervisory control strategy for a geothermal-integrated thermally anisotropic building envelope with a ground loop (TABE+GL). In TABE+GL, a hydronic loop embedded in the building envelope is directly coupled with a geothermal ground loop, allowing for bidirectional heat exchange between the envelope, the ground, and the indoor environment. A hybrid co-simulation framework was established by coupling a reduced-order resistor–capacitor (RC) thermal network model with EnergyPlus augmented with GHEDesigner modules. The RC model generated feasible heat flux options under three operating modes, and EnergyPlus predicted sensible loads, energy use, and pump energy demand. At each simulation step, a supervisory control algorithm selected the optimal loop configuration and duty factor that maximizes useful TABE geothermal utilization without exceeding the predicted sensible load, thereby avoiding overheating or cooling. Case studies were conducted for Los Angeles, California, Charleston, South Carolina, and Denver, Colorado. Results showed that the proposed framework reduced HVAC electricity consumption by 43%–67%, natural gas use for space heating by 11%–38%, and peak electricity demand by 43%–88%. These results highlight the potential of combining reduced-order envelope modeling, direct geothermal coupling, and load-oriented supervisory control to improve whole building energy performance and reduce peak demand across diverse weather conditions.

Howard, Daniel [Southern Adventist University]↗

Case Study of The ARRA-Funded GSHP Demonstration at the Natural Sources Building, Montana Tech

Under the American Recovery and Reinvestment Act (ARRA), 26 ground source heat pump (GSHP) projects were competitively selected in 2009 to demonstrate the benefits of GSHP systems and innovative technologies for cost reduction and/or performance improvement. One of the selected demonstration projects was proposed by Montana Tech of the University of Montana for a 56,000 sq ft, newly constructed, on-campus research facility – the Natural Resources Building (NRB) located in Butte, Montana. This demonstrated GSHP system consists of a 50 ton water-to-water heat pump and a closed-loop ground heat exchanger with two redundant 7.5 hp constant-speed pumps to use water in the nearby flooded mines as a heat source or heat sink. It works in conjunction with the originally installed steam HX and an air-cooled chiller to provide space heating and cooling. It is coupled with the existing hot water and chilled water piping in the building and operates in the heating or cooling mode based on the outdoor air temperature. The ground loop pumps operate in conjunction with the existing pumps in the building hot and chilled water loops for the operation of the heat pump unit. The goal of this demonstration project is to validate the technical and economic feasibility of the demonstrated commercial-scale GSHP system in the region, and illustrate the feasibility of using mine waters as the heat sink and source for GSHP systems. Should the demonstration prove satisfactory and feasible, it will encourage similar GSHP applications using mine water, thus help save energy and reduce carbon emissions. The actual performance of the system is analyzed with available measured data for January through July 2014. The annual energy performance is predicted and compared with a baseline scenario, with the heating and cooling provided by the originally designed systems. The comparison is made in terms of energy savings, operating cost savings, cost-effectiveness, and environmental benefits. Finally, limitations in conducting the analysis are identified and recommendations for improvement in the control and operation of such systems are made.

15 GEOTHERMAL ENERGY↗

Device Voltage Stress from Ground Leakage Current in Medium-Voltage Solid-State Transformer

Grounding related issues are critical for safe and reliable operation of solid-state transformer (SST) in medium-voltage (MV) applications, e.g., solar photovoltaic and energy storage integration, date center, electric vehicle fast charging, etc. This article presents for the first time the issue of additional device voltage stress due to grounding-loop current in current-source SST, using the soft-switching solid-state transformer (S4T) as an example. The S4T features single-stage isolated AC-AC, AC-DC, or DC-DC conversion with full-range ZVS, derived from flyback converter or current-source converter (CSC). However, the flyback operation for CSC-based SST means that magnetizing current flows through the reverse-blocking devices on only one side of the medium-frequency transformer (MFT) at a time. Then, the voltages across the devices, especially those on the other side of the MFT, can be influenced by parasitic current. A parasitic model of a modular S4T (M-S4T) prototype is developed from direct measurements and datasheets. Using the developed parasitic model and equivalent circuits, the causes of the voltage stress are analyzed. A voltage-stress mitigation scheme of connecting additional grounding capacitors is proposed. Damping resistors are also installed to damp out the grounding-loop resonance. A robust parameter design of the proposed scheme is given. The existence of the voltage stress issue and the effectiveness of the proposed scheme are verified experimentally on an MV SiC M-S4T prototype with inherent parameter variations among the five modules in the prototype. Here, both single-module and stacked-module operation are demonstrated during steady state and dynamic conditions up to 4 kV peak.

42 ENGINEERING↗

Exergy Analysis of a Two-Stage Ground Source Heat Pump with a Vertical Bore for Residential Space Conditioning under Simulated Occupancy

This twelve-month field study analyzes the performance of a 7.56W (2.16- ton) water-to-air-ground source heat pump (WA-GSHP) to satisfy domestic space conditioning loads in a 253 m 2 house in a mixed-humid climate in the United States. The practical feasibility of using the ground as a source of renewable energy is clearly demonstrated. Better than 75% of the energy needed for space heating was extracted from the ground. The average monthly electricity consumption for space conditioning was only 40 kWh at summer and winter thermostat set points of 24.4°C and 21.7°C, respectively. The WA-GSHP shared the same 94.5 m vertical bore ground loop with a separate water-to-water ground-source heat pump (WW-GSHP) for meeting domestic hot water needs in the same house. Sources of systemic irreversibility, the main cause of lost work are identified using Exergy and energy analysis. Quantifying the sources of Exergy and energy losses is essential for further systemic improvements. The research findings suggest that the WA-GSHPs are a practical and viable technology to reduce primary energy consumption and greenhouse gas emissions under the IECC 2012 Standard, as well as the European Union (EU) 2020 targets of using renewable energy resources.

15 GEOTHERMAL ENERGY↗

Measured water heating performance of a vertical-bore water-to-water ground source heat pump (WW-GSHP) for domestic water heating over twelve months under simulated occupancy loads

This paper presents monthly performance metrics of a 5.275 kW (1.5 ton) WW-GSHP providing 227 L day-1 domestic hot water at 49 C. Daily water use is simulated as stipulated in the Building America Research Benchmark Definition capturing the living habits of the average U.S household. The 94.5m vertical-bore ground loop is shared with a separate GSHP for space conditioning the 251m2 residential home. Data on entering water temperatures, energy extracted from the ground, delivered energy, compressor electricity use, COP, WW-GSHP run times, and the impact of fan and pump energy consumption on efficiency are presented for each month. Factors influencing performance metrics are highlighted.

ground source↗

Performance assessment of a real water source heat pump within a hardware-in-the-loop (HIL) testing environment

Over the last decade, the global fight against climate change through electrification has led to an increase in research on building heating, ventilation, and air conditioning (HVAC) systems that utilize intelligent control algorithms to provide demand-side grid service while also maintaining the thermal comfort of building occupants. As the pivotal point between building electricity consumption and indoor thermal comfort, high-efficiency electrical vapor-compression heat pumps are at the center of these emerging studies, and various grid-interactive and occupant-comfort control algorithms have been developed for them. The impact of these algorithms on heat pump operation and performance when subjected to different weather conditions, building loads, and grid requests calls for investigation and verification via experimental testing with actual heat pumps integrated with real-time building and grid responses. This study introduces a Water-Source Heat Pump (WSHP) Hardware-in-The-Loop (HIL) Test Facility that is the first of its kind. This testbed utilizes a 2-ton variable speed water-to-air heat pump that is capable of interacting with a virtual environment currently comprised of an EnergyPlus (E+) building simulation, an agent-based occupant behavioral model, and a single U-tube ground-loop heat exchanger (GLHE) model. Detailed descriptions of the testbed’s physical design and operation, virtual environment, as well as their mutual communication is provided. An uncertainty analysis is also performed under manufacturer specified heating and cooling design conditions. This analysis shows that the total load across the WSHP’s demand side heat exchanger, i.e., the sum of its latent and sensible components, can be measured with a relative uncertainty of ± 10.4% and ± 3.6% in cooling and heating mode respectively. The WSHP’s coefficient of performance (COP) can be measured with relative uncertainties of ± 10.4% in cooling mode, and ± 3.7% in heating mode. A preliminary 24-h experimental demonstration is then performed utilizing the DOE prototype small commercial office building model in E+. The simulation takes place in Atlanta, GA on the date of 08/26/15 from 12:00 AM to 11:59 PM using TMY3 weather data. Here, the results from this demonstration show that over the course of this experiment the simulated outputs of zone dry-bulb temperature, zone humidity ratio, and WSHP inlet water temperature can be tracked by testbed emulators up to a root mean squared error (RMSE) of ± 0.27 °C, ± 0.376 g/kg, and ± 0.85 °C respectively. The WSHP’s dynamic behavioral characteristics and performance are also captured, and correspond well with the authors’ previous understanding of heat pump efficiency as a function of evaporator and condenser fluid inlet conditions respectively.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-Use Savings Shapes Measure Documentation: Console Water-to-Air Geothermal Heat Pump

Executive Summary Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy’s ResStock™ and ComStock™ models over the past several years, the objective of this work is to produce national datasets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover most of the high-impact, market-ready (or nearly market-ready) measures. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility measure applied. It results in a time series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual sub-hourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. This measure models the conversion of an existing heating, ventilating, and air-conditioning (HVAC) system to a series of “console” water-to-air heat pumps served by a ground heat exchanger. Console water-to-air geothermal heat pumps (GHP) are all-in-one packages that have no or minimal ductwork and serve individual spaces. Properly designed ground heat exchanger-coupled systems can offer benefits in energy efficiency relative to “conventional” HVAC systems, as well as facilitating beneficial electrification. Console GHPs can be coupled to a ground loop on the source side and can directly replace electric baseboard heaters or air-source packaged terminal heat pumps. Console GHPs can also bring in outdoor air for ventilation. This measure will be referred to throughout the document as the “Console GHP” upgrade.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗