Search NASA⌕ Search

SEARCH · Search NASA

Results for “hazard and risk assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

LDRD23-0184: Resilience and Hazard Risk Assessment to Prioritize Security Operations for Decisions and Impacts (RHAPSODI)

Recent examples provide a significant concern for the resilience of the U.S. electric grid and represent a need for enhanced decision-making to address an increasingly wide range of complex system interactions and potential consequences. In response, this LDRD project produced a proof-of-concept evaluation called the Resilience and Hazard Assessment to Prioritize Security Operations for Decisions and Impacts (RHAPSODI) methodology as an agile and flexible analytic framework capable of addressing multiple, diverse threats to desired electric grid performance. After empirically grounding needs for the future of U.S. electric grid resilience, this project employed the systems-theoretic process analysis (STPA) to develop a systems engineering risk model. The results of a completed feasibility study of a notional high voltage transmission system demonstrate an improved ability to incorporate both spatial (e.g., geographically distributed) and temporal (e.g., dynamic and time-dependent) elements of security risk to the gird. The success of this LDRD project provides the foundation for further evolution of the systems engineering risk model for the grid; derivation of quantitative approaches to evaluate risk and resilience performance; facilitation of agile experimenting and grid sensitivity to a range of vulnerabilities; and development of tools to assist decision-makers in enhancing U.S. electrical grid resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Nuclear Containment Vessel Modeling for Multi-Hazard Probabilistic Risk Assessment under Seismic Hazards and Concrete Degradation

The current practice for natural phenomena hazards (NPH) risk assessment of nuclear facilities is to compute the risk for each hazard independently and then compound the total risk as a combination of single hazard risks. This state of practice does not consider correlations between hazards and the cascading impacts to structures, systems, and components (SSCs), and could thus underestimate the NPH risk or overestimate the nuclear facility safety. Events such as the Fukushima Daiichi accident have highlighted the importance of multi-hazard risk considerations to nuclear power plants (NPPs) that quantify the cascading damage effects to SSCs in the risk models. Moreover, the current fleet of NPPs in the United States is aging; these NPPs are now expected to operate well beyond their initially planned design life. Aging-related deterioration can potentially decrease the capacity of critical structures such as containment vessels to withstand NPH. Such aging considerations may not be adequately accounted for by the current NPH risk assessment guidelines. This paper presents a preliminary modeling and simulation of a representative reinforced concrete containment vessel subjected to seismic mainshock and aftershock considering concrete degradation due to alkali silica reaction. The broader aim is to develop multi-hazard time-dependent fragility functions that could be subsequently used in the probabilistic risk assessment (PRA) model. The multi-hazard component comes into play due to the consideration of damage to the containment vessel under seismic loads and concrete degradation. Consideration of concrete degradation also brings into play the time-dependent nature of the containment vessel response. The response of the containment vessel under varying degrees of concrete degradation to seismic loads is investigated. The results presented are simulated using the Multi-hazard Analysis for STOchastic time-DOmaiN phenomena (MASTODON) software for seismic analysis and the Blackbear software for concrete degradation and damage modeling. Both software are open source and developed within the Multiphysics Object-Oriented Simulation Environment (MOOSE).

42 ENGINEERING↗

Identifying human failure events (HFEs) for external hazard probabilistic risk assessment

In recent years, several advancements in nuclear power plant (NPP) probabilistic risk assessment (PRA) have been driven by increased understanding of external hazards, plant response, and uncertainties. However, major sources of uncertainty associated with external hazard PRA remain. One important source is how risk-significant human actions that are carried out to enable plant response and recovery from natural hazards cause the close coupling of physical impacts on plants and overall plant risk during these hazard events. This makes human reliability and human-plant interactions important elements to consider in resolving PRA gaps in external hazards. One of the challenges in considering human response in external hazard probabilistic risk assessment (XHPRA) is that most existing human reliability analysis (HRA) models were not developed for assessing actions outside the control room (termed ex-control room actions) and hazard response. To support this new scope, HRA models will need to be developed or modified to support identification of human activities, causal factors, and uncertainties inherent in external hazard response, thereby providing insights regarding event timing and physical event conditions as they relate to human performance. In this study, there are two main objectives: (1) evaluate the applicability of an existing cognitive-based HRA method, Phoenix, to ex-control room actions, and (2) identify sources of uncertainty to be characterized or reduced in order to make this method suitable for XHPRA. The first step of such work is performed by assessing the suitability of existing HRA methods to support identifying human failure events (HFEs) for human response to flooding hazards. These HFEs are human actions or inactions that are involved in human responses to flooding hazards and could contribute to the loss of a critical function for the plant in the scenario being examined. Here, in this work, decomposition analyses using the cognitive-based Phoenix HRA model are used to identify HFEs. The Phoenix method was found to be suitable for analyzing ex-control room actions as well as identifying specific HFEs and underlying crew failure modes (CFMs). However, the method's suitability for use in ex-control room actions would benefit from expanding the available CFMs to accommodate a larger variety of physical and communication tasks.

42 ENGINEERING↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Hazards and Probabilistic Risk Assessments of Advanced Nuclear Reactors Coupled with Industrial Facilities

This report provides a roadmap and tool kit for site specific risk assessments across a broad range of industrial customers co-located with advanced nuclear power plants (ANPP) that are not currently built and operating in the U.S. This report builds upon the body of work sponsored by the Department of Energy (DOE) Integrated Energy Systems Pathway that has produced industrial requirements studies and techno-economic assessments on the topics of feasibility of ANPP supported industrial processes. This report also leverages the DOE Light Water Reactor Sustainability (LWRS) program that has presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors (LWRs) co-located with hydrogen production facilities. Many of the hazard assessments and risk assessments performed for the LWRS report are agnostic to whether the nuclear reactor is an ANPP or were adapted to the ANPP focus. The report performs hazards assessments to include industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, wood pulp and paper mills, and hydrogen production. Hydrogen production facilities are assessed in depth through prior reports in the LWRS program and the results are leveraged in this report. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the nuclear power plant by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. A modular high temperature gas-cooled reactor (MHTGR) PRA only existing on paper was modeled and verified in modern PRA software. This will provide a tool for representative ANPP probabilistic analyses for future research.

10 SYNTHETIC FUELS↗

Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Industrial Facilities

This report provides a roadmap and toolkit for site-specific risk assessments across a broad range of industrial customers co-located with nuclear power plants (NPPs). This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Plant Operation and Generation Pathway that presented hazards assessment and generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors co-located with hydrogen production facilities. The report expands the hazards assessments to include other industrial facilities: an oil refinery, a methanol plant, a synthetic fuel (synfuel) plant, the production of synthetic gas (syngas) as part of the methanol and synfuel plants, and wood pulp and paper mills. All these facilities are specified through industrial process and requirements research performed by national laboratories, universities, and interaction with industry. Many of the processes used in this report are pre-conceptual designs to use for decarbonization of the current technology facilities. A process of failure modes and effects analysis (what can go wrong) and accidentology (what has historically gone wrong) was used to determine the hazards presented to the NPP by the addition of the HES and the industrial customer. Chemical properties of feedstocks and products are summarized as part of the hazards assessment. Example analysis procedures are provided for each of the hazard types identified. These deterministic analyses can be used to assess adherence to licensing criteria. They can also be used to meet other safety goals like protection of the public, workers, or industrial facility equipment. The probabilistic analysis consisted of three sizes of HESs modeled in a PRA to assess the impact on the initiating events (IE) and results of the PRA. The PRA results conclude that the resulting increases in IE frequencies are below the limits required for small changes to existing NPPs under 10 CFR 50.59.

08 HYDROGEN↗

Safety and Security Defense-in-Depth for Nuclear Power Plants

This report describes the risk-informed technical elements that will contribute to a defense-in-depth assessment for cybersecurity. Risk-informed cybersecurity must leverage the technical elements of a risk-informed approach appropriately in order to evaluate cybersecurity risk insights. HAZCADS and HAZOP+ are suitable methodologies to model the connection between digital harm and process hazards. Risk assessment modeling needs to be expanded beyond HAZCADS and HAZOP+ to consider the sequence of events that lead to plant consequences. Leveraging current practices in PRA can lead to categorization of digital assets and prioritizing digital assets commensurate with the risk. Ultimately, the culmination of cyber hazard methodologies, event sequence modeling, and digital asset categorization will facilitate a defense-in-depth assessment of cybersecurity.

97 MATHEMATICS AND COMPUTING↗

Review of Release Behavior of Hydrogen & Natural Gas Blends from Pipelines

Hydrogen can be used to reduce carbon emissions by blending into other gaseous energy carriers, such as natural gas. However, hydrogen blending into natural gas has important implications for safety which need to be evaluated. Hydrogen has different physical properties than natural gas, and these properties affect safety evaluations concerning a leak of the blended gas. The intent of this report is to begin to investigate the safety implications of blending hydrogen into the natural gas infrastructure with respect to a leak event from a pipeline. A literature review was conducted to identify existing data that will better inform future hazard and risk assessments for hydrogen/natural gas blends. Metrics with safety implications such as heat flux and dispersion behavior may be affected by the overall blend ratio of the mixture. Of the literature reviewed, there was no directly observed separation of the hydrogen from the natural gas or methane blend. No literature was identified that experimentally examined unconfined releases such as concentration fields or concentration at specific distances. Computational efforts have predicted concentration fields by modified versions of existing engineering models, but the validation of these models is limited by the unavailability of literature data. There are multiple literature sources that measured flame lengths and heat flux values, which are both relevant metrics to risk and hazard assessments. These data can be more directly compared to the outputs of existing engineering models for validation.

03 NATURAL GAS↗

Limitations of traditional tools for beyond design basis external hazard PRA

Probabilistic risk assessment (PRA) is being used increasingly by the nuclear industry for safety during normal operations as well as for the protection against external hazards. Computation of total risk in an external hazard PRA is dependent on hazard assessment, fragility assessment, and systems analysis. A systems analysis for propagation of component fragilities is conducted using event and fault trees. The event and fault trees for an actual power plant can be fairly large in size, which imposes computational challenges. Hence, certain assumptions are employed for computational efficiency. These assumptions typically represent the conditions imposed during the design basis (DB) scenario. The traditional PRA tools based on these assumptions are also widely applied to perform risk assessment in the context of beyond design basis (BDB) scenarios. However, some of these assumptions may not be valid for certain BDB scenarios. In addition, the probability of dependent failures also increases in BDB scenarios due to common cause failures (CCF) which usually results from design modifications, human errors, etc. In this manuscript, a simple and a relatively more complex illustrative examples are used to show the limitation of these assumptions in the numerical quantification of risk for the case of BDB conditions. Case studies with CCF events across multiple fault trees are also presented to illustrate the effect of these assumptions when traditional approach is used in BDB risk assessment. It is shown that the assumptions are valid for the case of DB conditions but may lead to excessively conservative risk estimates in the case of BDB conditions. Finally, a Bayesian network based top-down algorithm is proposed as an alternative tool for accurate numerical quantification of total risk in systems analysis.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the $\textit{Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems}$ (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks

58 GEOSCIENCES↗

Soil Sample Plan in Support of the Site 300 Explosives Waste Treatment Facility Ecological Risk Assessment Pursuant to the Hazardous Waste Facility Permit, Part V, Special Condition #14 a-f. August 2020

The Department of Toxic Substances Control issued the Final Hazardous Waste Facility Permit to Lawrence Livermore National Laboratory, Site 300 in 2017. As part of the continual process to ensure waste treatment emissions are not impacting ecological receptors, LLNL analyzed soil samples in the vicinity of the Explosive Waste Treatment Facility (EWTF) Burn Units (i.e., Burn Cage and Burn Pan) and the Detonation Pad. Soil samples were analyzed by EPA Solid Waste 846 Methods for furans, explosives, metals, and semivolatile compounds. In all samples, furans, explosives, and semi-volatile organic compounds were not detected. Metals were detected at concentrations below background levels. This soil sample plan will sample the same four downwind areas of the Burn Units and the same downwind areas of the Detonation, as well as including four new sample locations. The four new locations will be located to the northeast and southwest of the Burn Units and Detonation (as shown in Figure 3). The constituents to be analyzed are in Tables 2 and 3. Perchlorate was not identified as a constituent of concern in the 2007 Soil Sampling Plan. However, for this plan, all soil samples will be analyzed for perchlorate. After completion of the sampling event, a soil sample report will be submitted to DTSC in accordance with requirements specified in the Hazardous Waste Facility Permit, Part V, Special Conditions 16 a-f. This proposed soil sampling plan will be fully implemented no later than one year after receiving DTSC approval, in accordance with the Hazardous Waste Facility Permit, Part V, Special Condition 15.

54 ENVIRONMENTAL SCIENCES↗

Soil Sample Workplan in Support of the Site 300 Explosives Waste Treatment Facility Ecological Risk Assessment Pursuant to the Hazardous Waste Facility Permit (Part V, Special Condition #14 a-f)

The Department of Toxic Substances Control issued the Final Hazardous Waste Facility Permit to Lawrence Livermore National Laboratory, Site 300 in 2017. As part of the continual process to ensure waste treatment emissions are not impacting ecological receptors, LLNL analyzed soil samples in the vicinity of the Explosive Waste Treatment Facility (EWTF) Burn Units (i.e., Burn Cage and Burn Pan) and the Detonation Pad. Soil samples were analyzed by EPA Solid Waste 846 Methods for furans, explosives, metals, and semi-volatile compounds. In all samples, furans, explosives, and semi-volatile organic compounds were not detected. Metals were detected at concentrations below background levels. This soil sample plan will sample the same four downwind areas of the Burn Units and the same downwind areas of the Detonation, as well as including four new sample locations. The four new locations will be located to the northeast and southwest of the Burn Units and Detonation (as shown in Figure 3). The constituents to be analyzed are in Tables 7 and 8. Perchlorate was not identified as a constituent of concern in the 2007 Soil Sampling Plan. However, for this plan, all soil samples will be analyzed for perchlorate. Nitrate and all CAM17 metals have been added to the sampling plan to comply with DTSC comments received in correspondence dated June 4, 2021. After completion of the sampling event, a soil sample report will be submitted to DTSC in accordance with requirements specified in the Hazardous Waste Facility Permit, Part V, Special Conditions 16 a-f. This proposed soil sampling plan will be fully implemented no later than one year after receiving DTSC approval, in accordance with the Hazardous Waste Facility Permit, Part V, Special Condition 15.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Quantitative evaluation of common cause failures in high safety-significant safety-related digital instrumentation and control systems in nuclear power plants

Digital instrumentation and control (DI&C) systems at nuclear power plants (NPPs) have many advantages over analog systems. They are proven to be more reliable, cheaper, and easier to maintain given obsolescence of analog components. However, they also pose new engineering and technical challenges, such as possibility of common cause failures (CCFs) unique to digital systems. Here this paper proposes a Platform for Risk Assessment of DI&C (PRADIC) that is developed by Idaho National Laboratory (INL). A methodology for evaluation of software CCFs in high safety-significant safety-related DI&C systems of NPPs was developed as part of the framework. The framework integrates three stages of a typical risk assessment—qualitative hazard analysis and quantitative reliability and consequence analyses. The quantified risks compared with respective acceptance criteria provide valuable insights for system architecture alternatives allowing design optimization in terms of risk reduction and cost savings. A comprehensive case study performed to demonstrate the framework's capabilities is documented here in this paper. Results show that the PRADIC is a powerful tool capable to identify potential digital-based CCFs, estimate their probabilities, and evaluate their impacts on system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cybersecurity Considerations for Hydrogen Infrastructure in Airport Environments

This report explores key cybersecurity concerns and best practices within environments that serve as reference points for the development of hydrogen fueling infrastructure for aviation. This cybersecurity analysis leverages prior NREL studies: 1) hydrogen fueling station component validation to identify vulnerabilities and failure events documented in physical equipment, and 2) electric aircraft charging infrastructure analysis to explore primary cybersecurity vulnerabilities. It reviews the criticality of digitized technologies in sustaining hydrogen fuel production, storage, and fueling systems, noting cybersecurity concerns that are universal to power systems and industrial control systems in general. In considering cybersecurity vulnerabilities within a future landscape of hydrogen energy for aviation applications, a reference architecture was intended to reveal the points of connection between assets and the potential sensors that are vulnerable to manipulation in the event of compromised access or communication within a SCADA system. A generalized reference architecture can help stakeholders, engineers, or strategists understand connections, criticalities, and standard practices when it comes to designing and planning for new systems. There are several gaps to account for in assessing the future of hydrogen production, storage, and fueling for aviation. Engaging stakeholders, including aircraft manufacturers, electric utilities, site property owners, and local communities, will inform decision-making around site structure, operations, and resources for future hydrogen fueling infrastructure to understand operational needs and cybersecurity awareness. Cybersecurity mitigation strategy must consider physical attack vectors that emerge with the integration of hydrogen systems into existing airport security requirements. The cybersecurity risk assessment contained in this report is an entry point into potential future granular-level analyses to be conducted as part of hazard and risk assessments for safe aviation hydrogen infrastructure, determining how the scale of hydrogen fuel infrastructure for aviation impacts the volume of cyber attack vectors, and what, if any, are the vulnerabilities associated with different types of on-board hydrogen systems. In this nascent development phase, assessing how best to integrate cybersecurity practices into an evolving U.S. aviation landscape provides critical insights into building increased awareness and stakeholder engagement to support a cyber-resilient infrastructure.

08 HYDROGEN↗