At least 19 records

EVs@Scale NextGen Profiles: EVSE Characterization 2024

As part of the U.S. Department of Energy's EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High power charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. EVSE characterization was conducted over a wide range of DC output current and DC voltage charging for nominal and off-nominal test conditions. Test plans and procedures were developed and refined to define the test configurations and requirements, measurement parameters, and test procedures used throughout NextGen Profiles testing.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVs@Scale: NextGen Profiles EVSE Characterization 2025

As part of the U.S. DOE EVs@Scale consortium, the Next-Generation Profiles (NextGen Profiles [NGP]) project presents analysis and results from the characterization of high-power conductive and wireless charging infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. Electric Vehicle Service Equipment (EVSE) characterization involves testing over a wide range of DC charging currents and voltages during nominal and off-nominal conditions. This testing allows for a better understanding of the impact that high-power charging will have on the electric grid. A common set of standard test plans, procedures, and data requirements were applied to the characterization in this document with minor updates and improvements. This report covers all conductive characterization activities performed between October 2024 and September 2025 on the Delta Electronics 350KW Electric Vehicle Charging System, consisting of power cabinet model EIDN-U350KTA01 and dispenser model EIDD-U350SSUUAEG-350.Key Findings include: Output regulation, Efficiency and power factor, Load management, Grid Resilience, Smart Charge Management (SCM) performance, Thermal control system performance, Multi-port simultaneous charging performance, and Selected performance comparisons with other EVSEs characterized in the NextGen Profiles project. Hot and cold temperature testing was not conducted on the Delta 350KW due to laboratory limitations. Future research could include continued testing the Delta hardware under off-nominal temperature conditions including multi-port/multi-session simultaneous charge testing, in addition to collecting data on other high-power conductive chargers to augment.

25 ENERGY STORAGE↗

EVs@Scale NextGen Profiles: High Level Analysis and Procedures Report

As part of the U.S. DOE EVs@Scale consortium, the NextGen Profiles (NGP) project presents analysis and results from the study of High Power Charging Electric Vehicles and Battery Charging Infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. The NextGen Profiles project has three pillars of investigation: Electric Vehicle Charging Profile Capture, Electric Vehicle Service Equipment Performance Characterization and Fleet Utilization analysis. All NextGen Profiles project testing was conducted under test conditions that comprise a diverse range of realistic real-world operating conditions including nominal conditions that should transfer the maximum allowable energy in the minimum time possible and off-nominal conditions that typify charging performance under suboptimal charging conditions. Results from 13 unique EVs, eight EVSEs and four electrified fleets are included in the NextGen Profiles project analysis.

33 ADVANCED PROPULSION SYSTEMS↗

Station Impact Analysis 2025

As part of the U.S. DOE EVs@Scale consortium, the NextGen Profiles (NGP) project presents analysis and results from the study of High Power Charging Electric Vehicles and Battery Charging Infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. The intent of the project is to further understand the most recent technological capabilities of the electric mobility industry related to charging performance. The project aims to develop EV, EVSE, and Fleet characterization testing practices and comprehensive analysis with inputs from key industry stakeholders. The results published in this NextGen Profiles project report provide data and insight for use by numerous entities including modeling and simulation organizations, policy makers, fleet planners, industry stakeholders and the general public involved with the development, deployment and operation of electrified transportation technologies. The factors influencing Electric Vehicle (EV) Direct Current Fast Charging (DCFC), including EV battery specifications, temperature effects on lithium-ion battery and power electronics performance, lithium-ion battery SOC bounding and charging station design considerations are specifically investigated to analyze their impacts on charging station operation and recommendations are made to minimize charge station dwell time, reduce charging costs and mitigate electric grid and charge station congestion. Additional high-power charging results are anticipated in future publications in support of the U.S. DOE EVs@Scale consortium NextGen Profiles project.

33 ADVANCED PROPULSION SYSTEMS↗

Consequence-Driven Cybersecurity for High-Power Electric Vehicle Charging Infrastructure

Cybersecurity of high-power charging infrastructure for electric vehicles (EVs) is critical to the safety, reliability, and consumer confidence in this publicly accessible technology. Cybersecurity vulnerabilities in high-power EV charging infrastructure may also present risks to broader transportation and energy-infrastructure systems. Here, this paper details a methodology used to analyze and prioritize high-consequence events that could result from cybersecurity sabotage to high-power charging infrastructure. The highest prioritized events are evaluated under laboratory conditions for the severity of impact and the complexity of cybersecurity manipulation. Mitigation solutions and strategies are presented to secure the vulnerabilities that potentially lead to high-consequence events. These mitigations can be immediately implemented by industry or executed during the design stage.

25 ENERGY STORAGE↗

A Threat Model of High-Power Electric Vehicle Charging Infrastructure

While electric vehicle powertrains have inherent efficiencies over their conventional counterparts, recharge time remains a significant concern. High power charging (HPC) alleviates the concerns by delivering greater power to speed charging. HPC requires communication among the vehicle, charging infrastructure, and electric supply to facilitate charging. Consequently, the transformation extends the reach and heightens the risks posed by cyberattacks, as an incident may threaten both the power grid and transportation systems. In this paper, a novel consequence-centric methodology is used to formulate an HPC infrastructure threat model. By linking threats to electricity and transportation impacts, a broad understanding of consequences is acquired.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Infrastructure Consequence Assessment

With consumers’ growing interest in electric vehicles, extreme fast charging stations are poised to provide high-power charging to rapidly recharge light-duty passenger vehicles. High-power charging requires high-level communication between vehicle and charger to govern the charging process. The coupling of power and communication increases the potential scale of cyberattacks. Using a full Western Electricity Coordinating Council planning model, load manipulation from high-power charging infrastructure is investigated. Two cases of load manipulation are studied: (i) a discrete, widespread system event and (ii) loads modulated near the Western Interconnect’s resonant frequency. In (i) some generation trips and in (ii) oscillations are observed on the California Oregon Intertie. Neither scenario results in significant adverse effects to the grid.

33 ADVANCED PROPULSION SYSTEMS↗

Development of a DC Distribution Testbed for High-Power EV Charging

This paper explores the design and implementation of a power hardware-in-the-loop (P-HIL) setup for DC distribution infrastructure integrated with high-power charging (HPC) of electric vehicles (EVs), DC loads, and sources. The utilization of DC distribution holds significant potential for enhancing the operation of a HPC station architecture. However, there are challenges establishing a DC charging hub including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products to evaluate different use cases at rated power and voltage levels. The developed P-HIL setup features a dedicated DC charging hub, DC-coupled chargers, DC loads/sources, DC protection, and a communication architecture. The integrated P-HIL system provides a versatile testing environment to address technology and interoperability gaps and implements a smart energy management system (SEMS). This platform enables comprehensive and robust testing of COTS devices, charger prototypes, SEMS controllers and protection schemes, which together will accelerate transition to EVs at scale. The setup is tested for various use-cases at full-scale, integrating 950 V DC bus voltage, 660 kW grid-tied inverter, 150 kW COTS charger, and 100 kW energy storage system within an open-source SEMS platform.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Development and Experimental Validation of a High-Power DC Distribution Testbed for Advanced Charging Infrastructure and Energy Management

This paper presents the development of a hardware testbed for DC-distributed high-power charging (HPC) stations. As DC distributed solutions emerge as a viable solution to optimize HPC site operations, challenges such as interoperability, protection, and seamless integration of distributed energy resources (DER) persist. These issues underscore the need for a robust testing facility to investigate compliance of available commercial off-the-shelf (COTS) market devices. The developed testbed features a DC-distributed charging hub including a charger, emulated energy storage system (ESS), and site level communication and controller implementation. It facilitates the testing of COTS hardware, charger prototypes, standards validation and site energy management system (SEMS) controllers at rated power. This paper details the development of the charging infrastructure platform, implementation of communication system, validation of different SEMS algorithms, and understanding improvements required for future expansion. Using the developed testbed, interoperability gaps for SEMS implementation with multi-vehicle concurrent charging via a multi-port charger are experimentally observed. Aimed at supporting the transition to large-scale EV charging infrastructure deployment and DER integration, this testbed plays a crucial role in conformity testing of COTS device interoperability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV SALaD 2023 Demonstration: Best Practices and Mitigations for Protecting EVSE Infrastructure

The Electric Vehicle Secure Architecture Laboratory Demonstration (EV SALaD) program is a demonstration of cybersecurity best practices for high-power electric vehicle (EV) charging infrastructure led by Idaho National Laboratory (INL), in collaboration with other DOE National Laboratories participating in the EVs at Scale Consortium.a Sandia National Laboratories (SNL) and Pacific Northwest National Laboratory (PNNL) participated in the first 2-year (FY22-23) demonstration cycle for EV SALaD. This report documents the FY23 demonstration, the second in a series of demonstrations and collaborations in deploying and operating cybersecure EV charging infrastructure. It includes a summary of improvements from the FY22 demonstration, technical analysis of the FY23 demonstration, how the research demonstrates cyber-physical and cybersecurity best practices for high-power EV charging infrastructure, and related impacts to national and energy security. For EV SALaD, the FY22 demonstration focused on the detection, ranking, and prioritization of anomalous events for high-power EV charging. The FY23 demonstration additionally included the demonstration of cybersecurity best practices, which included protection and mitigation solutions to prevent, respond, and recover from anomalous events. During the demonstrations, the multi-lab EV SALaD team conducted a Test Effect Payload (TEP)b evaluation on extreme fast charger (XFC) hardware equipped with Cerberus, a detection and response solution, to demonstrate anomaly detection and mitigation cybersecurity best practices against cyber-enabled events.

33 ADVANCED PROPULSION SYSTEMS↗

EVs@Scale Next-Gen Profiles - Fleet Utilization 2023

As U.S. fleet operators begin transitioning to electric vehicles (EVs), critical questions arise regarding how to manage this shift without disrupting fleet operations or placing undue stress on the electric grid. A major challenge for fleets is maintaining effective operational schedules while accommodating charging requirements, particularly with high-power charging (HPC) infrastructure, which presents grid stability concerns for utilities. Proposed solutions such as charging substations, megawatt charging systems (MCS), and smart charge management systems (SCMS) offer potential pathways forward, but their effectiveness depends on alignment with real-world fleet behavior and operational constraints. This report investigates the charging and utilization behavior of EV and EVSE fleets actively employing HPC technologies by conducting detailed case study analyses based on telematics data. A suite of predefined metrics—covering charging, routing, and other operational behaviors—is developed to evaluate the impact of fleet activities on grid infrastructure and identify opportunities for optimization. Results highlight variations in charging behavior across fleets, such as weekday versus weekend usage, diurnal charging trends, and the role of operational predictability in enabling SCMS effectiveness. While SCMS can help lower costs and improve energy efficiency for fleets with stable schedules, they may be insufficient for fleets with highly variable or long-haul operations, which may require more robust solutions like MCS. Visualization of aggregated hourly energy metrics reveals that while fleet behaviors are diverse, there are common temporal patterns that could inform infrastructure planning and energy management. These insights emphasize the need for fleet-specific charging strategies that minimize grid impact while supporting reliable fleet operations. Additionally, the report underscores the broader economic stakes of electrification, particularly in high-value markets such as freight, where misaligned transitions could stall EV adoption. By examining current EV and EVSE fleet deployments using predetermined standardized metrics, this study offers a foundation for developing technologies and operational frameworks that support scalable, grid-compatible electrification across a variety of fleet types while establishing a baseline understanding of operational behaviors. In doing so, we aim to ensure that future charging solutions reflect actual fleet needs and grid constraints—an essential step toward maintaining operational continuity and achieving a successful transition to electric fleet operations.

Charging↗

A Tradeoff Analysis of Series / Parallel Three-Phase Converter Topologies for Wireless Extreme Chargers

In this paper, extreme fast charging (XFC) technology is studied considering the charge rates of 300 kW for wireless power transfer (WPT) applications. Tradeoff analysis of series and parallel connection of three-phase WPT system are presented by comparisons of voltage and current stresses on power electronics active / passive components. In addition, star (Y) / delta (Δ) connection configurations for three-phase wireless power transfer coupling coils are analyzed with series and LCC resonant compensation circuits. The system series and parallel connection controllability is also reviewed considering voltage and current balance techniques with output control. In a conclusion of evaluation analysis, it is revealed that each component of 300 kW wireless charging network must be designed for high fast charging system and the overall system operation need to be strategically planned for high power charging and infrastructure deployment.

Asa, Erdem↗

Improving EV Charger Resiliency for MW Charging Systems

In this paper, the resiliency of a megawatt-scale EV charging station is investigated. Fault detection and tolerance methodologies are presented, based on monitoring the voltage offsets in DABs and switch-level currents in three-phase inverters, with the goal of maintaining operation at rated power during single faults and at reduced power under multiple fault conditions. To validate the effectiveness of the proposed strategy, simulation results at the rated 1 MW power of the charging station are carried out, followed by controller hardware-in-the-loop (CHIL) experiments on a 250 kW section of the station. The results highlight the feasibility of the integrated fault-tolerant methods for resilient, high-power EV charging infrastructure.

Adib, Aswad [ORNL] (ORCID:000000020997056X)↗

Electrification Annual Progress Report (FY2019)

During fiscal year 2019 (FY 2019), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance electric motors and power electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance grid modernization and electric vehicle charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Each of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2019.

25 ENERGY STORAGE↗

Electrification FY2020 Annual Progress Report

The Electric Drive Technologies (EDT) program’s mission is to conduct early-stage research and development on transportation electrification technologies that accelerate the development of cost-effective and compact electric traction drive systems that meet or exceed performance and reliability requirements of internal combustion engine (ICE)-based vehicles, thereby enabling electrification across all light-duty vehicle types.

33 ADVANCED PROPULSION SYSTEMS↗

EVSE Characterization: V2G EVSE Comparison

As part of the U.S. Department of Energy EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization is conducted over a wide range of direct current (DC) current and DC voltage operation for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2024 study conducted on electric vehicle supply equipment (EVSE) characterization by the Idaho National Laboratory (INL) include two bi-directional vehicle-to-grid (V2G) capable EVSEs. These EVSE are referred to as V2G-EVSE9 and V2G-EVSE10. Laboratory testing is conducted at nominal test conditions to characterize the power transfer capabilities, efficiency, power factor, and other power quality metrics of the two DC EVSEs capable of V2G bi-directional power transfer. Results from testing show the performance is consistent for V2G-EVSE9 and V2G-EVSE10 when comparing charging to discharging performance, except for V2G-EVSE10 for power transfer when operating above 70% of the rated DC current. V2G-EVSE10 efficiency is >98% while charging and <91% while discharging at the same operating conditions, near maximum-rated current, at 300VDC. In contrast, V2G-EVSE9 results are consistent for charging and discharging. This EVSE is nearly 96% efficient while charging or discharging when operating over 50% of rated AC power. V2G EVSE performance is also characterized during off-nominal AC grid conditions involving AC voltage deviation (426 VAC to 518 VAC), AC frequency deviation of +2% (58.8 Hz to 61.2 Hz), and AC voltage harmonics injection. Many test conditions have little-to-no impact on performance characteristics of the two EVSEs; however, there are a few notable findings with significant power transfer capability impacts. AC voltage harmonics injection resulted in negative impacts on power quality attributes for both EVSEs, but with no impact on power transfer capability. Off-nominal AC voltage and frequency conditions resulted in unstable or lack of power transfer capability for both EVSEs. V2G-EVSE9 is unable to transfer power when AC voltage is >300V L-N. V2G-EVSE10 is unable to transfer power when AC frequency deviation exceeds +0.8%. V2G energy management system transient response and latency are quantified during laboratory testing. V2G-EVSE9 and V2G-EVSE10 utilize cloud-based V2G energy management systems that command the power transfer level between the EVSE and EV. The latency and response characteristics of the entire systems (web-based user interface, V2G energy management system, cellular communications, and EVSE response) are quantified through laboratory testing for V2G-EVSE9 and V2G-EVSE10. V2G-EVSE9 latency ranges from 0.8 to 1.8 seconds, whereas V2G-EVSE10 latency ranges from 3.4 to 8.8 seconds. The ramp rate to a change in power transfer request also differs between the two EVSEs. V2G-EVSE10 ramp rate ranges from 50% to -250% of rated AC power per second, whereas V2G-EVSE9 rate ranges from 95% to -95% of rated AC power per second. At the highest rate of change in power transfer, V2G-EVSE10 can change from full charge power to full discharge power in less than one second. The V2G EVSE characterization presented in this report provides valuable insights and results for use by numerous entities. This includes modeling and simulation organizations, decision makers, fleet planning, industry stakeholders, and many others involved with the development and deployment of electrified transportation technologies. Additional high-power DC chargers, bidirectional chargers, and inductive power transfer EVSE characterization results are anticipated from additional EVSE brands and models, which will be detailed in future publications in support of the U.S. Department of Energy EVs@Scale consortium Next-Gen Profiles project.

25 ENERGY STORAGE↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗