High Pressure Fire Loop Analysis

The scope will be limited to analyzing the effect of the EFC within the system and how one improperly installed coupling affects the rest of the HPFL system. The discussion will include normal operations, impaired flow, and service interruptions. Normal operations are defined as two-way flow to buildings. Impaired operations are defined as a building that only has one-way flow being provided to the building. Service interruptions will be when a building does not have water available to it. The project will look at the following aspects of the reliability of the HPFL system: mean time to failure (MTTF) of EFCs, mean time between failures (MTBF), series system models, and parallel system models. These calculations will then be used to discuss the reliability of the system when one of the couplings fails. Compare the reliability of two-way feeds versus one-way feeds.

42 ENGINEERING↗

Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC (Final Report)

Alstom Power Inc., a wholly owned subsidiary of the General Electric Company (GE) recently completed “Advanced Ultrasupercritical (AUSC) Materials Thick-Walled Cycling Header Development for ComTest-AUSC” under Award No. DE-FE0026183 for the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL). This project developed a design for testing of a high temperature nickel-based superalloy thick-walled header to simulate cycling and flexible plant operation in new and existing plants. The objective was to simulate the expected thermal stresses of a new AUSC plant or a retrofit header in an existing plant to improve flexible dynamic operation while maintaining component integrity and overall power plant reliability. The high performance superalloy materials that enable higher operating temperatures and pressures can support future transformational power technologies including new AUSC plants at 4250-5000 psi, 730°C/760°C or will serve as a replacement component in a repowered or retrofit USC coal powered cycling plant at 3600 psi, 600°C. These alloys can also enable supercritical CO2 cycles, nuclear power, solar power and more efficient natural gas combined cycle units as targeted by the U.S. DOE/NETL Cross-Cutting Research Technology Program Plan. Recently developed advanced nickel alloys such as Inconel 740H (740H) and Haynes 282 (H282) have been successfully tested on a pilot scale for fireside corrosion using steam loop tubing at AUSC temperatures of 760°C in actual operating coal fired boiler. These high strength materials have been demonstrated their adequacy for use in other high temperature boiler components such as superheater tubes. Thick-walled superheater outlet headers which operate at high temperatures and pressure under severe cycling condition are considered as one of the most critical component in the AUSC coal fired boiler. Over the design life of a plant, these headers are exposed to the most severe fatigue and creep damage accumulation and need to be properly designed for the expected cycling in an AUSC plant with flexible operation. These materials need to demonstrate adequate design life of 20 to 30 years for creep and fatigue conditions. The following tasks were performed: 1. A conceptual design was developed of a thick-walled component representative of typical headers with several tube connections and proper flow rates (~100,000 lbs/hr) suitable for Phase II test at 760°C operation. This was based on a process analysis of expected full scale new and component retrofit designs for AUSC; 2. A multi-physics flow and heat transfer computational fluid dynamics (CFD) analysis of the component for proper layout of the header configuration, number and geometry (size) of tubes required for bypass flow, flow rates through the tubing, and sectional pressure drops was performed. Steam to header metal heat transfer film coefficients in the header section and the tubes during the two stages (half load and full load) of the cycling operation were evaluated and used in the stress analysis; 3. Detailed analytical evaluation of the thick-walled pipe and tube connections for mechanical integrity under cycling conditions was performed. This included transient thermal stress analysis and fatigue usage estimation including the tube-to-pipe weld geometries and weld materials; 4. A layout and design of the thick-walled test component was developed and instrumentation required for a test was identified; 5. Continuum Damage Mechanics (CDM) creep prediction models were extended to 740H and H282 and validated with public data on 740H and H282 for use in creep analysis. In addition, detailed creep analyses were performed separately for the design life of the conceptual AUSC superheater outlet header using these General Electric (GE) creep constitutive models. GE was the prime contractor for the project, which was directed by Principal Investigator Robert Schrecengost and Lead Scientist Dr. B. Reddy Ganta. Other collaborative participants in this project included GE Global Research, GE Boiler Engineering, and a Technical Consultant from EPRI.

01 COAL, LIGNITE, AND PEAT↗

High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters (Final Report)

The primary goal of this project was to prepare designs for indirect-heated, oxy-combustion-based, coal-fired, supercritical carbon dioxide (sCO 2 ) power plants, to assess the potential cost and performance benefits that this marriage of technologies might offer when compared to more conventional, oxy / coal-fired steam-Rankine power plants. The oxy-combustion technologies under investigation in this project were atmospheric-pressure, oxy-pulverized coal (PC) cases as well as chemical looping combustion cases. In addition, a smaller-scale air-PC plant without CO 2 capture integrated with a sCO 2 power cycle was also designed and compared to a comparable steam-Rankine cycle baseline.

Maxson, Andrew↗

LP CO 2 Compressor Final Technical Report

This report summarizes work performed by Dresser-Rand, A Siemens Business and subcontractors, under DOE award number DE-FE0026727, in pursuit of the design, construction and test of a 10:1 pressure ratio “Low Pressure” (LP) supersonic CO 2 compressor suitable for use as a first stage in a two stage 100:1 compression system. This LP compressor, in conjunction with a corresponding 10:1 high pressure compressor, provide the overall 100:1 compression ratio required to compress CO 2 from 22 psia (as generated by a CO 2 capture system) to the 2215 psia required to transport CO 2 via a pipeline to a suitable sequestration site. The compressor demonstrates application of Dresser-Rand’s supersonic compression technology at an industrial scale using CO 2 in a closed-loop testing facility. This scope of this technical report is to summarize all phases of the program executed from August 5, 2015 to the June 30, 2018. This program included the final testing of a “high pressure” (HP) compressor that had previously been built by Dresser-Rand and the design, fabrication, assembly and test of a corresponding LP compressor. In summary, the LP compressor exceeded the target pressure ratio and efficiency goals for the program at CO 2 flowrates suitable for those expected in coal fired power plant carbon capture systems. Initial and Final Techno-Economic Analysis reports were generated to show the value this compression solution brings to carbon capture and sequestration (CC&S) systems for the Case B12B coal fired power plant model. Integration of the DATUM S compression technology into a carbon capture and sequestration system was shown to result in a 27% reduction in the Cost of Electricity for the compression system, as well as a 21,500 gallon per hour reduction in required cooling water flow for the plant.

20 FOSSIL-FUELED POWER PLANTS↗

Preliminary Techno-Economic Assessment of Gas Switching Reforming (GSR) of Natural Gas for Pure Hydrogen Production and Power Generation with Integrated CO2 Capture

The increasing demand for hydrogen and the CO2 intensity of natural gas (NG) reforming motivate the development of low-carbon-emission hydrogen production technologies. Gas Switching Reforming (GSR) is an advanced auto-thermal reforming technology that produces hydrogen or syngas from natural gas. It integrates inherent CO2 capture by utilizing a specialized oxygen carrier in a single fluidized bed reactor, eliminating the need for complex, energy-intensive post-combustion separation. GSR technology builds upon Chemical Looping Reforming (CLR), an experimentally proven technology with strong potential for scaling up. In this study, select oxygen carriers (OC) (NiO/Al2O3, Fe2O3-CeO2/Al2O3, and magnetite) were tested in methane steam reforming in a fixed bed reactor to determine their relative reactivities under relevant conditions for GSR (800 °C, 7 bar total pressure). Process models were then developed to perform techno-economic analysis (TEA) of GSR for hydrogen production (GSR-H₂) and a combined cycle (GSR-CC) in which high-purity H₂ is fired in a gas turbine to produce electricity. Operating at 10 bar and 1100 °C and with the additional recovery steps implemented increased H₂ production by ~30% and improved efficiency relative to prior studies. For GSR-H₂, the levelized cost of hydrogen (LCOH) is 1.61–1.64 $/kg-H₂, competitive with a reference SMR case, though operating and maintenance costs are higher due to increased electricity demand. GSR-CC has a significantly higher levelized cost of electricity (LCOE) than its reference NGCC (natural gas combined cycle) plant, suggesting it is less competitive; however, increasing production scale could make it more attractive. Life-cycle results for GSR-H2 indicate NG consumption drives ~75% of total global warming impacts (~2.3 kg CO2 eq/kg H2). An environmental, health, and safety screening suggests iron-based carriers are comparatively safer, whereas NiO may pose greater risks. Overall, GSR-H2 is a scalable, competitive option for hydrogen production using nickel and non-nickel OC.

03 NATURAL GAS↗

Preliminary techno-economic assessment of gas switching reforming (GSR) of natural gas for pure hydrogen production and power generation with integrated CO2 capture

The increasing demand for hydrogen and the CO2 intensity of natural gas (NG) reforming motivate the development of low-carbon-emission hydrogen production technologies. Gas Switching Reforming (GSR) with integrated CO2 capture, a technology based on Chemical Looping Reforming (CLR), has been experimentally proven and shows potential for scale-up. In this study, select oxygen carriers (OC) (NiO/Al2O3, Fe2O3-CeO2/Al2O3, and magnetite) were tested in methane steam reforming in a fixed bed reactor to determine their relative reactivities under relevant conditions for GSR (800 °C, 7 bar total pressure). Process models were then developed to perform techno-economic analysis (TEA) of GSR for hydrogen production (GSR-H2) and a combined cycle (GSR-CC) in which high-purity H2 is fired in a gas turbine to produce electricity. Operating at 10 bar and 1100 °C and with the additional recovery steps implemented increased H2 production by ∼ 30% and improved efficiency relative to prior studies. For GSR-H2, the levelized cost of hydrogen (LCOH) is 1.61–1.64 $/kg-H2, competitive with a reference SMR case, though operating and maintenance costs are higher due to increased electricity demand. GSR-CC has a significantly higher levelized cost of electricity (LCOE) than its reference NGCC (natural gas combined cycle) plant, suggesting it is less competitive; however, increasing production scale could make it more attractive. Life-cycle results for GSR-H2 indicate NG consumption drives ∼ 75% of total global warming impacts (∼2.3 kg CO2 eq/kg H2). An environmental, health, and safety screening suggests iron-based carriers are comparatively safer, whereas NiO may pose greater risks. Overall, GSR-H2 is a scalable, competitive option for hydrogen production using nickel and non-nickel OC.

03 NATURAL GAS↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Comparative assessment of new oxygen carrier materials for gas switching reforming of natural gas: Techno-economics assessment, life cycle analysis, and experimental insights

The increasing demand for hydrogen and the CO 2 intensity of natural gas (NG) reforming motivate the development of low-carbon-emission hydrogen production technologies. Gas Switching Reforming (GSR) with integrated CO 2 capture, a technology based on Chemical Looping Reforming (CLR), has been experimentally proven and shows potential for scale-up. In this study, select oxygen carriers (OC) (NiO/Al 2 O 3 , Fe 2 O 3 -CeO 2 /Al 2 O 3 , and magnetite) were tested in methane steam reforming in a fixed bed reactor to determine their relative reactivities under relevant conditions for GSR (800 °C, 7 bar total pressure). Process models were then developed to perform techno-economic analysis (TEA) of GSR for hydrogen production (GSR-H 2 ) and a combined cycle (GSR-CC) in which high-purity H 2 is fired in a gas turbine to produce electricity. Operating at 10 bar and 1100 °C and with the additional recovery steps implemented increased H 2 production by ∼ 30% and improved efficiency relative to prior studies. For GSR-H 2 , the levelized cost of hydrogen (LCOH) is 1.61–1.64 $/kg-H 2 , competitive with a reference SMR case, though operating and maintenance costs are higher due to increased electricity demand. GSR-CC has a significantly higher levelized cost of electricity (LCOE) than its reference NGCC (natural gas combined cycle) plant, suggesting it is less competitive; however, increasing production scale could make it more attractive. Life-cycle results for GSR-H 2 indicate NG consumption drives ∼ 75% of total global warming impacts (∼2.3 kg CO 2 eq/kg H 2 ). An environmental, health, and safety screening suggests iron-based carriers are comparatively safer, whereas NiO may pose greater risks. Overall, GSR-H 2 is a scalable, competitive option for hydrogen production using nickel and non-nickel OC.

03 NATURAL GAS↗

An Integrated Supercritical System for Efficient Produced Water Treatment and Power Generation

The main goal of this project was to evaluate the feasibility of an integrated supercritical (SC) water desalination and power generation system for treatment of produced waters from CO 2 sequestration, oil production, and coal-bed methane recovery. This system may offer a transformative approach to generating power from coal or natural gas (NG) and purifying saline water or produced water with high total dissolved solids (TDS) in a zero-liquid discharge plant. The closed-loop steam cycle of conventional power plants was replaced with an open-loop steam cycle that heated the pretreated produced water above the SC point of water (374 °C and 221 bar) to precipitate and separate the salts dissolved in the water. After separation of the precipitated salt, the SC steam required further treatment to reduce the salt content from ~100 mg/L (ppm) to <1 ppm to make it suitable for use in turbines for power generation. A SC membrane distillation unit was used to polish the SC steam, which could be sent through a series of turbines for power generation, and the steam exiting the low-pressure turbine could be condensed by cooling water to produce pure water. Project tasks included a process simulation and a techno-economic evaluation of the integrated system; design and assembly of SC salt precipitation and membrane distillation systems; development and characterization of advanced carbon membranes for SC membrane distillation; and pretreatment, desalination, and purification of different produced water samples with salt concentrations of 30,000–200,000 ppm to a high-purity (<1 ppm) level. Process simulations were performed for 550 MW SC coal-fired or NG baseline cases and various scenarios for the proposed integrated SC system using produced water as the water source and coal or NG as the fuel source. Simulation results indicated that the net plant efficiency loss of the proposed SC cogeneration process would be in the range of <1% to ~4%, in which NG and lower TDS produced water cases would have higher efficiencies. The proposed process for coal-fired cases could provide all water needs for the power generation process and generate additional pure water for beneficial use. A techno-economic analysis was performed to estimate the cost of produced water treatment (dollars /kgal of treated water) by conventional treatment processes compared with the proposed cogeneration process. The cost estimation for the proposed cogeneration system included the cost of pretreatment, the cost of power loss to integrate the water desalination process into the power generation system, and the cost of plant modification or retrofitting. The cost of produced water treatment was calculated by assuming three different scenarios in which converting a baseline power plant to the proposed cogeneration plant would increase the cost of the boiler and feed water system by 10%, 50%, and 100%. Results indicated that the cost of produced water treatment, even with a 100% cost increase, was in the range of $8.6–11.6 dollars per kgal, which is about half of the treatment cost by conventional methods. The cost of produced water treatment by the proposed cogeneration system could be further reduced or a considerable income could be generated if the values of saltwater and freshwater products are considered. Overall, the techno-economic analysis results indicated that the proposed integrated SC system could potentially treat produced water at a cost significantly lower than the cost of produced water treatment by conventional technologies. To evaluate the feasibility of the proposed treatment system at a laboratory scale, a SC salt precipitation and membrane distillation system was designed and fabricated to treat a simulated brine or pretreated produced water by precipitating salts and further polishing the SC steam containing ~100 ppm salts to a high-purity steam. Through baseline tests with NaCl solutions, with concentrations ranging from 30,000 to 200,000 ppm, it was demonstrated that concentrated feed solutions could be treated by precipitating salt at SC conditions to a TDS level of 130 ppm. Produced water samples were collected from a potential CO 2 sequestration site, a coal-bed methane site, and an oilfield in Illinois. Representative samples were characterized for various water quality parameters, including pH; turbidity; conductivity; and concentrations of selected anions, cations, alkalinity, dissolved organic carbon, total suspended solids, TDS, and total petroleum hydrocarbons. The produced water samples were first treated by conventional pretreatment methods to remove residual oil, dissolved organic matter, and scale-forming species. Pretreatment methods included coagulation, sedimentation, filtration, activated carbon adsorption, and ion-exchange adsorption. Pretreated produced waters were treated at SC conditions in which salts were precipitated. Analysis of treated samples revealed that the concentration of Na (the main cation) in produced waters was reduced dramatically from 14,000–47,400 ppm in the feed to 21–80 ppm in treated waters. Concentrations of other main cations (Ca, Mg, Sr, K) also decreased significantly from initial values of ~1,000–22,000 ppm to ~1 ppm or less. However, a significant increase in the concentrations of Fe, Ni, Cu, and Co was observed, mainly caused by leaching of these elements from the system (vessels, filters, tubing), which is manufactured from alloys containing Fe, Ni, Cu, and Co. To polish the SC steam containing a salt content of ~100 ppm to a high-purity level of <1 ppm, a SC membrane distillation treatment using carbon membranes was employed. Different types of self-standing or supported carbon membranes were developed from graphite, graphene, carbon nanotubes, carbon nanofibers, and pyrolytic carbon. Screening tests revealed that only a limited number of developed carbon membranes were suitable for the purification of steam at SC conditions. Membranes that were either fragile and lacked mechanical strength or had large pores and showed limited salt rejection (<20%) were found to be unsuitable for the purification of SC steam. Promising carbon membranes that were successfully tested for purifying SC steam included two graphite membranes (i.e., AF-5, a porous graphite material, and FGS, a flexible graphite sheet) and a carbon nanotube membrane grown on a Hastelloy substrate and then further modified using a proprietary method (i.e., membrane C). The AF-5 membrane exhibited a stable water flux of ~50 kg/m 2 ∙h and ~40% salt rejection. The FGS membrane had a high salt rejection of 95%–98% but a lower water flux of ~15 kg/m 2 ∙h. Membrane C showed an extremely high flux of 200-800 kg/m 2 ∙h, which is one order of magnitude higher than the water flux of conventional membranes. Membrane C also exhibited 87%–93% salt rejection. Overall, a two-stage or multistage polishing treatment by these membranes could lower the salt content of the SC steam from initial values of ~100–200 ppm to the steam quality of <1 ppm or to parts per billion levels required for the power cycle.

20 FOSSIL-FUELED POWER PLANTS↗

Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants (Final Scientific / Technical Report)

Increasing the competitiveness of the existing pulverized-coal utility fleet in the United States may be achieved by decreasing heat rate, via increases in steam cycle efficiency through upgraded steam temperatures and use of latest technology available in steam turbine and blading design. The average net plant efficiency of the US coal-fired fleet is approximately 33% (HHV). Plant efficiency increases to approximately 41.4% (HHV) at 1,350°F (732°C) steam temperature. However, achieving these Advanced Ultra-Super Critical (AUSC) steam conditions requires the use of advanced high-temperature materials. While there has been a significant amount of DOE-funded materials R&D, most of the related design work has focused on new (greenfield) units, rather than on opportunities to retrofit this advanced technology to the existing utility fleet. If technology, based upon the advanced materials required for AUSC steam conditions, may be applied to the existing fleet, using an economically viable retrofit, a higher capacity factor can be expected as a result of the increased plant competitiveness. The Electric Power Research Institute (EPRI) was awarded a project by the US Department of Energy to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants: 2,400 psig (16.6 MPa) subcritical and 3,500 psig (24.1 MPa) supercritical pulverized coal units. The nine upgrade options that were originally being considered included increasing the main and reheat steam temperatures from 1,000°F (538°C) to 1,100°, 1,200°, and 1,350°F (593°C, 649°C, and 732°C) while holding the steam pressures constant at their original design values, and cases where just the main steam or reheat steam temperatures were increased. The objective was to minimize the modifications required to the existing power plant while still providing a significant improvement in heat rate. The upgrade options assumed that the boiler enclosure envelope remained unchanged from each base case, and that all applicable OEM design guidelines for normal commercial units were imposed. For the highest temperature supercritical case, an option of using a low-pressure molten salt loop to transfer heat from the furnace to the steam was examined. The first major task of the work scope was designed to examine the technical feasibility of various upgrade options, while the subsequent work determined economic viability of the technically feasible upgrade options. Prior to evaluating the effect of these increased temperatures, a “base case” model of a subcritical and supercritical PC boiler was created, which was used for comparative purposes. Upgrade options were evaluated at full-load, part-load and dynamic transient conditions. Once the technical feasibility of each upgrade option was evaluated, the economic value of the heat rate improvement of each feasible option was determined by detailed modeling of unit dispatch in several regional power markets. The dispatch model was used to estimate the amount of revenue from power sales the upgraded unit would receive in comparison to a non-upgraded version of the same power plant. As a parallel task to the dispatch analysis, the capital cost of implementing the upgrades was estimated. The capital cost estimates were then compared to the increased revenue estimated by the dispatch modeling to determine the economic attractiveness of each upgrade option. Several upgrade options were determined to be technically feasible. The net present value (NPV) of the costs for steam cycle upgrades considered in this study ranged from approximately $\$$111 to $\$$130 million. The economic modeling results show that the unit dispatch changes resulting from steam cycle upgrades are relatively small, due largely to heat rate (and operating cost) changes being relatively small. Additionally, the cost of each upgrade exceeds the net revenue increases associated with the upgrade case. Note that the breakeven values are higher for subcritical retrofits, but the capital costs for the subcritical upgrades are also slightly higher. In typical new pulverized coal plants, fuel accounts for approximately 25% of the cost of electricity (COE), while capital costs represent around 50% of the COE. Therefore, in order to improve the heat rate by 4% one can only afford to increase the capital cost by 2%, at the same cost of electricity. The conclusion of this study is that without a cost for emitting CO 2 , it will be difficult to pay for significant efficiency improvements on plants firing low cost coals.

01 COAL, LIGNITE, AND PEAT↗

NH 4 OH Looping with Membrane CO 2 Absorber and Distributed Stripper for Enhanced Algae Growth

The University of Kentucky Center for Applied Energy (UK CAER) has devised a unique, integrated CO2 capture and utilization technology. CO2 from coal-fired power generation flue gas is first captured at half the operating cost of a typical aqueous CO2 capture system (CCS), distributed in an aqueous stream and then fixed by algae in bioreactors where the algae production is increased by 50% over that with a typical intermittent nutrient feeding system. Lower CCS operating cost is achieved by eliminating the flue gas pretreatment step for cooling and SO2 removal, eliminating steam extraction from the power generation steam cycle for solvent regeneration, and eliminating CO2 compression. Higher algae production is achieved by continuous, just-in-time nutrient feed to the bioreactors directly from a distributed solvent regenerator, which maintains the bioreactor pH for optimum growth. The process starts with a uniquely configured membrane absorber, where the flue gas is indirectly contacted with an ammonium hydroxide (NH4OH) solvent. Dissolved NH3 is attractive for both CO2 capture and as an algae nutrient. For CO2 capture it is inexpensive, has a low regeneration energy, is thermally- and oxidatively-stable and has a viscosity near that of water, which makes is easy to transport. Numerous studies have shown that the scrubbing capacity of NH3 is approximately 0.9-1.2 kg of CO2/kg of NH3, with a CO2 removal efficiency of ~99% and half the solvent regeneration energy than that of 30 wt% MEA[1, 2, 3]. NH3 is attractive as an algae nutrient due to its low cost. The rich NH4OH solvent is pumped to a set of distributed regenerators which are co-located with the algae bioreactors. Solvent pumping, transport and distribution reduces the balance of plant (BOP) cost compared to a typical aqueous CCS related to the flue gas duct and boost fan required to transport the flue gas. The energy required for the distributed solvent regeneration is supplied by solar-thermal panels eliminating the need for steam extraction from the power generation steam cycle. After solvent regeneration, the product stream contains both the CO2 captured from the flue gas and volatized NH3 from the solvent. This product stream is fed directly to the bioreactors, eliminating the need for compression of the CO2 stream. The relative amounts of CO2 and NH3 in the product stream are adjusted and controlled by a controlling the regeneration conditions (pressure and temperature). The continuous feed of the right ratio of nutrients overcomes the typical inhibition of algae growth resulting from frequent pH swings in the bioreactor due to unbalanced (intermittent) feeding systems for CO2 and N. Also, because the regenerators will operate at pressure and be located in close proximity to the bioreactors, there is no worry about pressure drop when sparging the gas into the algae. Sparging produces small bubbles which is beneficial for mass transfer efficiency. One known challenge when using an NH4OH solvent is high NH3 emission. Hydrophobic membranes are used for CO2 capture using an aqueous NH3 solution[4, 5] without the direct contact between flue gas and aqueous solution. Additionally, UK CAER CO2 capture and utilization process manages NH3 slip in three extra measures. First, NH3 slip is minimized by working with minimal species partial pressure, which is proportional to the concentration in the liquid. Hence, lowering the capture solvent concentration will lower the NH3 partial pressure. Second, UK CAER’s previous work has demonstrated that the addition of Zn2+ into NH3 solutions to chelate the NH3 can reduce NH3 volatility. Third, the configuration of the membrane CO2 absorber utilizes condensed water from the flue gas to continually wash the gas-side of the membrane to reduce fouling and recapture NH3 slip. Additional details about the UK CAER unique, integrated CO2 capture and utilization technology will be presented along with technology development plans. Diao, N., Q. Li, and Z. Fang. 2004. Heat transfer in ground heat exchangers with groundwater advection. International Journal of Thermal Sciences. 43: 1203-1211, He, Q., M. Chen, L. Meng, K. Liu, and W. Pan. 2004. Study on Carbon Dioxide Removal from Flue Gas by Absorption of Aqueous Ammonia. Western Kentucky University. Yeh, A.C., and H. Bai. 1999. Comparison of ammonia and monoethanolamine solvents to reduce CO2 greenhouse gas emissions. The Science of the Total Environment. 228: 121-133, Villeneuve, K., D. Roizard, J.C. Remigy, M. Iacono, and S. Rode. 2018. CO2 capture by aqueous ammonia with hollow fiber membrane contactors: Gas phase reactions and performance stability. Separation and Purification Technology, 199: 189-197, Toro Molina, C., and C. Bouallou. 2016. Carbon dioxide absorption by ammonia intensified with membrane contactors. Clean Techn Environ Policy 18, 2133–2146 (2016)

20 FOSSIL-FUELED POWER PLANTS↗