Search NASASearch

SEARCH · Search NASA

Results for “hosting capacity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Large Load Impacts to Distribution System Hosting Capacity

This work examined the impact of large loads on utility distribution system models using the Sandia-developed open-source software DREAMS. It was shown that hosting capacity varies with location and changes after any asset is added to, or removed from, a system. Despite the tested models having similar rated voltages and other characteristics, their thermal and voltage constrained hosting capacity varied over 2 MW. The addition of a 3-phase balanced constant power large load with power factor of 1.0 exhibited non-linear reductions to all voltage constrained hosting capacities. The reductions to thermal constrained hosting capacity from a load with similar characteristics was more linear, related to the size of the added load, and did not impact all model buses. Co-located capacitors were shown to accommodate demand that was beyond the baseline voltage constrained hosting capacity limits, however, the costs and benefits from this approach were found to not be 1:1 and required additional available thermal capacity.

24 POWER TRANSMISSION AND DISTRIBUTION

Smart Meter Data: A Gateway for Reducing Solar Soft Costs with Model-Free Hosting Capacity Maps

Public-facing solar hosting capacity (HC) maps, which show the maximum amount of solar energy that can be installed at a location without adverse effects, have proven to be a key driver of solar soft cost reductions through a variety of pathways (e.g., streamlining interconnection, siting, and customer acquisition processes). However, current methods for generating HC maps require detailed grid models and time-consuming simulations that limit both their accuracy and scalability—today, only a handful out of almost 2,000 utilities provide these maps. This project developed and validated data-driven algorithms for calculating solar HC using data from AMI without the need of detailed grid models or simulations. The algorithms were validated on utility datasets and incorporated as an application into NRECA’s Open Modeling Framework (OMF.coop) for the over 260 coops and vendors throughout the US to use. The OMF is free and open-source for everyone.

14 SOLAR ENERGY

Improving photovoltaic hosting capacity of distribution networks with coordinated inverter control: A case study of the EPRI J1 feeder

Abstract Adding photovoltaic (PV) systems in distribution networks, while desirable for reducing the carbon footprint, can lead to voltage violations under high solar‐low load conditions. The inability of traditional volt‐VAr control in eliminating all the violations is also well‐known. This article presents a novel coordinated inverter control methodology that leverages system‐wide situational awareness to significantly improve hosting capacity (HC). The methodology employs a real‐time voltage‐reactive power (VQ) sensitivity matrix in an iterative linear optimizer to calculate the minimum reactive power intervention from PV inverters needed for mitigating over‐voltage without resorting to active power curtailing or requiring step voltage regulator setting changes. The algorithm is validated using the EPRI J1 feeder under an extensive set of realistic use cases and is shown to provide 3x improvement in HC under all scenarios.

Dalal, Dhaval [School of Electrical, Computer, and

Stepped hosting capacity for maximizing distributed solar on Guam

Guam Power Authority (GPA) sought national lab assistance through the Energy Technology Innovations Partnership Project as part of the second cohort of applicants (i.e. the program’s second year). GPA is leading an effort to evolve the island’s energy generation portfolio to 50% renewable by 2030, and 100% renewable by 2040. These goals for renewable penetration are a function of public law and GPA is legally required to comply, though GPA’s timeline is more aggressive by five years in each case than the law requires.

14 SOLAR ENERGY

Three-Dimensional Grid Visualization for Planning Activities: A Dubai Case Study

National Laboratory of the Rockies (NLR), in collaboration with the Dubai Electricity and Water Authority (DEWA) and Infra-X, has undertaken the Energy Visualization Analysis Project. The aim of this project is to enhance analytical and 3D visualization capabilities for distribution network planning and renewable energy integration. As modern grid continues to evolve with large-scale solar PV deployment and emerging distributed energy resources (DERs), the ability to effectively analyze, visualize, and communicate complex grid behaviors has become increasingly critical. The project focuses on developing empirical use cases based on real distribution feeder data and engineering workflows, ensuring the outcomes are directly aligned with operational environment. Through time-series power flow simulations and nodal hosting capacity analysis, the study quantifies the impacts of high PV penetration on voltage and thermal limits within representative 11 kV feeders. These analyses identify specific nodes and conditions where DER integration challenges arise. Furthermore, a Battery Energy Storage System (BESS) optimization algorithm was applied to determine the optimal size and placement of storage systems that can mitigate network constraints and enhance hosting capacity. The comparative results between base-case and BESS-augmented scenarios clearly demonstrate improvements in network stability and load management efficiency. In parallel, the NLR team developed an immersive 3D visualization framework, enabling interactive exploration of grid simulations using commodity head-mounted display (HMD) systems. This framework transforms conventional 2D simulation data into spatially intuitive visual environments - allowing engineers to analyze feeder conditions, PV hosting potential, and BESS effects in real time. This report represents the first foundational phase in establishing a visualization-driven analytical ecosystem. It provides a methodological foundation for data integration, visualization architecture, and simulation-based decision support, paving the way for large-scale adoption of immersive visualization across DEWA's Smart Grid Initiative, R&D activities, and future network resilience studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Deer Isle and Stonington Energy Reliability Opportunities

The towns of Deer Isle and Stonington, located on the island of Deer Isle in Maine, partnered with the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to examine options to enhance energy resilience, reduce dependence on imported fuels, and mitigate high energy costs. With technical support from the National Laboratory of the Rockies (NLR), Lawrence Berkeley National Laboratory (LBNL), and regional partner the Island Institute, the project focused on evaluation of the local electricity distribution infrastructure, examination of ongoing activities to reduce the frequency of outages, review of the applicable policy and regulatory environment, and identification of potential on-site energy solutions. Key findings revealed the island's reliance on a single distribution line, and limited hosting capacity for additional distributed energy resources. Solar photovoltaics (PV) technology, with and without battery storage, was found to be the most viable technology given economic, technical, and social considerations. While also technically feasible, wind energy faces more difficult siting and less public acceptance compared to PV. Marine energy technologies were determined to be infeasible due to technology immaturity and lengthy permitting timelines. Modeling of potential building-scale PV plus storage systems resulted in successful grant applications for installations at two local facilities. Analysis of community scale energy generation and storage options resulted the local utility, Versant, submitting a grant application for a proposed community-scale battery storage system to increase grid resilience and hosting capacity. This initiative has strengthened the communities' energy planning capabilities and laid the groundwork for future clean energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on Banshee Distribution Network

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Use of Digital Real-Time Simulation and Optimization to Identify Maximum Real Power Injection on the Banshee Distribution Network: Preprint

This study investigates the hosting capacity of the Banshee Distribution Network by optimizing the real power injection at carefully selected Distributed Energy Resource (DER) locations. The analysis is conducted within the framework of power system operational constraints, including bus voltage ranges, thermal line ratings, and transformer loading limits. A Python-based Genetic Algorithm (GA), implemented using the PyGAD library, is employed to iteratively identify the optimal power injection configuration that maximizes network utilization while preserving system reliability. The methodology integrates a real-time simulation environment using the Real-Time Digital Simulator (RTDS), allowing high-fidelity evaluation of power flow and voltage behavior under each proposed injection scenario. By coupling the optimization algorithm with real-time simulation feedback, this approach ensures that both static and dynamic constraints are enforced during the evaluation process. The GA leverages evolutionary operators such as selection, crossover, and mutation to navigate the nonlinear search space efficiently. The results of the study delineate the feasible hosting capacity at three targeted buses, reflecting maximum real power levels that can be injected without causing voltage violations, transformer overloading, or line congestion. These findings provide a decision- support tool for distribution planners and utilities aiming to integrate higher penetrations of DERs in existing infrastructure. Additionally, the work lays the foundation for extending such optimization techniques to multi-objective formulations, including economic dispatch and reactive power coordination, in future studies.

24 POWER TRANSMISSION AND DISTRIBUTION

Distributed Energy Resource Integration

This webinar focuses on the subject of DER integration, outlining the current industry state of the art and status of DER adoption in the US, a holistic view and roadmap of DER integration, DER interconnection standards, interconnection screening and study processes, interconnection automation, DER hosting capacity, AMI analytics, and non-wires alternatives.

29 ENERGY PLANNING, POLICY, AND ECONOMY

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

Sizing and Location Selection of Medium‐Voltage Back‐to‐Back Converters for DER‐Dominated Distribution Systems

Medium‐voltage back‐to‐back (MVB2B) converters can connect two distribution systems and quantifiably transfer power between them. This function can enable the MVB2B converter to exchange distributed energy resource (DER)‐generated power between two systems and bring significant value to enhancing distribution system DER adoption. Our previous work analysed and demonstrated the value MVB2B converter can bring to DER integration. As continuous work, this paper presents a methodology that helps address the MVB2B converter sizing and location selection problem in distribution systems with high DER penetrations. The proposed methodology aims to address three critical problems for MVB2B converter implementation in the real world: (1) which distribution systems are better to be connected, (2) what converter size is appropriate for connecting the distribution systems, and (3) where the optimal connection points are in the systems for connecting the MVB2B converter. The proposed methodology has been demonstrated by case studies that include various scenarios involving distribution systems with different dominated load types and high photovoltaic penetrations. The results demonstrate that selecting the optimal converter size based on net revenue and time of return considerations leads to a balance between maximizing energy savings and minimizing financial payback periods. Furthermore, feeder pair selection based on load profile standard deviation effectively identifies systems that derive the greatest value from MVB2B integration. Finally, an optimized connection point selection approach using a voltage load sensitivity matrix ensures minimal system impact while facilitating efficient power exchange. These findings provide practical insights for the real‐world deployment of MVB2B converters to enhance DER hosting capacity and improve grid resilience.

14 SOLAR ENERGY

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION

Graph-Learning-Assisted State and Event Tracking for Solar-Penetrated Power Grids with Heterogeneous Data Sources

Unlike transmission systems, distribution systems do not typically contain sufficient metering to enable real-time state estimation. The lack of sufficient real-time measurements prohibits accurate and timely monitoring of the state of distribution systems. As a result, control and optimal operation of distribution systems, especially those containing large numbers of renewable generation units are not possible without proper data and information about the current state of the system. The main motivation of this project is to address this shortcoming by developing an approach which provides “predicted” real-time measurements so that they can be used to execute a distribution system state estimator. Thus, the objective of the project is to make the distribution systems fully observable, such that the hosting capacity for solar generation can be accurately estimated, and unnecessary solar curtailments can be avoided. In order to accomplish this goal, the project investigated the use of a grid-model-informed machine learning (ML) tool which integrates heterogeneous data streams obtained from AMI meters, SCADA as well as PMU measurements and created synchronous measurement snapshots for the state estimator (SE); and developed a hybrid robust SE which provides not only accurate state estimates but also real-time feedback for the ML model refinement.

14 SOLAR ENERGY

Considerations for Distributed Edge Data Centers and Use of Building Loads to Support Large Interconnections

The rapid expansion of artificial intelligence (AI) and machine learning is driving unprecedented electricity demand from data centers. It is predicted that by 2030, 90% of AI workloads will be inference-based, requiring interconnection of multiple low-latency edge data centers (<20 MW) sited closer to end users - often on already constrained distribution feeders. Although individually small, these loads can aggregate to large loads per feeder, straining infrastructure, creating multi-year interconnection delays, and driving up customer costs. This paper proposes a data center-focused grid-integration framework that combines feeder hosting capacity analysis with building energy efficiency, building load flexibility, and waste heat reuse to expand effective feeder and substation headroom. Such approaches can reduce interconnection delays, lower costs for ratepayers, and accelerate AI-ready infrastructure deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

American-Made Solar Prize: Edgeli Enables DER Integration (CRADA 615) (Final Report)

The purpose of this project was to demonstrate how granular time series data and automated data transformation, and impact assessment tools could speed interconnection approvals for distributed energy resource projects of various types and sizes. Types included community solar, rooftop solar, and EV charging projects. Using software routines to automate the transformation of data (e.g. GIS) to a network database and power flow model then applying scenarios to create hourly (8760) hosting capacity values and voltage and thermal impacts for specific projects, we were able to demonstrate the feasibility of quickly assembling and analyzing key utility data sets for interconnection purposes. The outcomes of this effort will become the foundation for future work that will enhance and encapsulate the software components developed as part of this project, into web services (e.g. APIs) that can be integrated into queue management systems and automate interconnection screening processes.

14 SOLAR ENERGY