Search NASA⌕ Search

SEARCH · Search NASA

Results for “hydraulic containment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Systematic Method for Evaluating Extraction and Injection Flow Rates for 100-KR-4 and 100-HR-3 Groundwater Operable Unit Pump-and-Treat Interim Actions for Hydraulic Containment

This document describes a systematic method to develop flow rate recommendations for Pump-and-Treat (P&T) extraction and injection wells in 100-KR-4 and 100-HR-3 Groundwater Operable Units (OU) of the Hanford Site. Flow rate recommendations are developed as part of ongoing performance monitoring and remedy optimization of the P&T interim actions to develop hydraulic containment of the dissolved chromium plume in groundwater and protect the Columbia River from further discharges of groundwater from inland. This document details the methodology and data required to infer the influence of individual wells near the shoreline on hydraulic containment and river protection and develop flow rate recommendations to improve system performance and mitigate potential shortcomings of the system configuration in place.

54 ENVIRONMENTAL SCIENCES↗

Interim Measures Work Plan: South Repeater Building: Solid Waste Management Unit 121: Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances: Kennedy Space Center, Florida

This document presents the design details of a granular activated carbon (GAC) hydraulic containment and groundwater treatment system Interim Measures Work Plan for the South Repeater Building site (South Repeater, Solid Waste Management Unit 121), located at John F. Kennedy Space Center (KSC), Florida. The interim measures (IM) treatment area includes the source area and downgradient property boundary, which have been impacted by per- and polyfluoroalkyl substances (PFAS). The objectives of the IM are to treat the source area and mitigate PFAS migration to areas outside of KSC boundaries. This document was prepared by AECOM Technical Services, Inc., for the National Aeronautics and Space Administration under Contract 80KSC019D0010, Task Order 80KSC021F0096. The IM consists of the installation and operation of 19 extraction wells and an associated groundwater treatment system. A total of 13 wells will be installed to a depth of 34 feet below land surface (bls) to target the upper medium-grained sand with shell layer. A total of six wells will be installed to a depth of 56 feet bls to target the lower layer of poorly graded sand with shell fragments. The system will be designed to operate each extraction well simultaneously using submersible pumps at flow rates of 5 or 10 gallons per minute (gpm), excluding one extraction well with a flow rate of 30 gpm. The extracted groundwater will be conveyed to a groundwater treatment system, where it will be treated via GAC prior to disposal via infiltration. To evaluate treatment system performance, baseline groundwater sampling will be conducted prior to treatment system startup. Performance monitoring will be completed quarterly for the first year. A total of eight performance monitoring wells will be installed to a depth of 12 feet bls, and eight performance monitoring wells will be installed to a depth of 30 feet bls. In addition to the installation of 16 performance monitoring wells, 12 existing monitoring wells will be incorporated into the performance monitoring program.

groundwater treatment↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Development of an Automated Remedy Performance Evaluation Program - 13622

Performance monitoring is a vital element of groundwater remediation. Unfortunately, the enormous efforts and costs that are expended procuring, managing, processing and storing monitoring data are often not subject to correspondingly rigorous evaluation. This is despite the fact that many steps in the process are predictable and are repeated many times over the remedy life cycle. At the Department of Energy (DOE) Hanford Site, a program is underway to automate many of these steps - processing, formatting any analyzing large volumes of heterogeneous data associated with the operation of several groundwater pump-and-treat (P and T) and in-situ remedies. The Automated Remedy Performance Evaluation Program (ARPEP) was developed from a work-flow process designed to deliver (a) monthly data summaries and preliminary analysis, (b) quarterly performance assessments, and (c) annual roll-up analyses that detect changes in long-term monitoring datasets and support remedy optimization. The intent of the ARPEP is to provide detailed, systematic and traceable data summaries, depictions and analyses that can be used by project scientists to complete their evaluation of remedy performance. The ARPEP work-flow was formalized following extensive review of applicable guidance, regulation and industry standards. The ARPEP incorporates disparate data types collected over different frequencies, such as water levels and pumping rates recorded every minute, and groundwater sample results obtained on quarterly, annual or irregular intervals. The data are processed, reduced to frequencies suitable for assessment, and combined in various ways leading to performance indicators such as (a) pumped well capacities and system downtime that reflect operational performance; (b) hydraulic gradients and areas of hydraulic containment that reflect hydraulic performance; and (c) time-series (longitudinal) and geo-statistical (spatial) trend analyses that reflect progress toward attainment of Remedial Action Objectives (RAOs). The entire sequence of data processing and analysis is undertaken within the R programming environment, an open-source environment for statistical computing and graphics, and is summarized in a comprehensive PDF project report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identifying the Technical Basis for Technical Impracticability Waivers for Recalcitrant Radionuclides at Department of Energy Sites - 19055

Injection wells are currently used to hydraulically contain the leading edge of a radioactive iodine-129 ({sup 129}I) groundwater plume that underlies the Hanford Site's 200-UP-1 Operable Unit within the Central Plateau. Hydraulic containment has been implemented because to date, no viable treatment technologies have been identified that can achieve the federal drinking water standard of 1 pCi/L. The large spatial extent of the {sup 129}I plume limits the practical implementation of readily available remedy options, and the presence of large amounts of natural stable {sup 127}I as well as multiple iodine species (iodate, iodide, and organic-iodine complexes) in the groundwater present challenges for remedy performance. As evaluations of potential remediation technologies proceed, risk-informed remediation endpoints and alternatives- such as applicable or relevant and appropriate requirements technical impracticability (TI) waivers-are being evaluated as specified in the interim Record of Decision. A TI waiver may be necessary for {sup 129}I at 200-UP-1 to achieve a plume condition that is still protective of human health and the environment. Nearly 100 TI waivers have been granted at sites across the U.S.; however, a TI waiver has not yet been granted for a radionuclide nor has one been granted for a U.S. Department of Energy (DOE)-managed site. This situation underscores the importance of developing a methodology for risk-based decision-making for iodine and other contaminants of concern at DOE sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process for Obtaining TI Waiver for Recalcitrant Radionuclides at DOE Sites - 18225

The current plan for treating radioactive iodine-129 ({sup 129}I) at the 200-UP-1 operable unit (OU) within the Central Plateau at the Hanford Site is to hydraulically contain the groundwater plume using injection wells placed at the leading edge of the plume. In the previous feasibility study for the OU, no treatment technologies were identified that could achieve the federal drinking water standard of 1 pCi/L. In addition to further study to identify viable remediation technology options, efforts were initiated to assess the potential human health and environmental risks associated with using hydraulic containment of {sup 129}I, and to refine transport estimates based on evidence of attenuation. An initial step was to develop and apply a waste-site scale integrated vadose zone-aquifer model. Because viable {sup 129}I remediation technologies for the OU may not be identified in current efforts, a process to facilitate examining the suitability of a technical impracticability waiver for the OU conditions was initiated by defining the monitoring data analysis, documentation, and simulation support that would be needed for obtaining a waiver. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Components Refurbishment and Chemical Analysis Facility Hot Spot 1 Year 2 Annual Performance Monitoring Report

The Performance Monitoring Report presents the Year 2 operations, maintenance, and monitoring (OM&M) activities for the hydraulic containment system (HCS) Interim Measures (IM) at the Components Refurbishment and Chemical Analysis (CRCA) Facility located at John F. Kennedy Space Center (KSC), Florida. Year 2 operations extended from September 2020 to August 2021 and included: operation, maintenance and monitoring of the HCS; performance monitoring through collection of groundwater samples; and sub-slab gas and ambient air sampling. The existing hydrogeologic model was also updated. The system is performing as designed, and groundwater data demonstrate contaminant reduction.

CRCA↗

Hybrid Sorbents for 129 I Capture from Contaminated Groundwater

Radioiodine ( 129 I) poses a risk to the environment due to its long half-life, toxicity, and mobility. It is found at the U.S. Department of Energy Hanford Site due to legacy releases of nuclear wastes to the subsurface where 129 I is predominantly present as iodate (IO 3 – ). To date, a cost-effective and scalable cleanup technology for 129 I has not been identified, with hydraulic containment implemented as the remedial approach. Here, novel high-performing sorbents for 129 I remediation with the capacity to reduce 129 I concentrations to or below the US Environmental Protection Agency (EPA) drinking water standard and procedures to deploy them in an ex-situ pump and treat (P&T) system are introduced. Furthermore, this includes implementation of hybridized polyacrylonitrile (PAN) beads for ex-situ remediation of IO 3 – -contaminated groundwater for the first time. Iron (Fe) oxyhydroxide and bismuth (Bi) oxyhydroxide sorbents were deployed on silica substrates or encapsulated in porous PAN beads. In addition, Fe–, cerium (Ce)–, and Bi–oxyhydroxides were encapsulated with anion-exchange resins. The PAN–bismuth oxyhydroxide and PAN–ferrihydrite composites along with Fe- and Ce-based hybrid anion-exchange resins performed well in batch sorption experiments with distribution coefficients for IO 3 – of >1000 mL/g and rapid removal kinetics. Of the tested materials, the Ce-based hybrid anion-exchange resin was the most efficient for removal of IO 3 – from Hanford groundwater in a column system, with 50% breakthrough occurring at 324 pore volumes. The functional amine groups on the parent resin and amount of active sorbent in the resin can be customized to improve the iodine loading capacity. These results highlight the potential for IO 3 – remediation by hybrid sorbents and represent a benchmark for the implementation of commercially available materials to meet EPA standards for cleanup of 129 I in a large-scale P&T system.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Preliminary design of propulsion system for V/STOL research and technology aircraft

The V/STOL Research and Technology Aircraft (RTA)propulsion system design effort is limited to components of the lift/cruise engines, turboshaft engine modifications, lift fan assembly, and propulsion system performance generation. The uninstalled total net thrust with all engines and fans operating at intermediate power was 37,114 pounds. Uninstalled system total net thrust was 27,102 pounds when one lift/cruise is inoperative. Components have lives above the 500 hours of the RTA duty cycle. The L/C engine used in a fixed nacelle has the cross shaft forward of the reduction gear whereas the cross shaft is aft of the reduction gear in a tilt nacelle L/C engine. The lift/cruise gearbox contains components and technologies from other DDA engines. The rotor has a 62-inch diameter and contains 22 composite blades that have a hub/tip ratio of 0.454. The blade pitch change mechanism contains hydraulic and mechanical redundancy. The lift fan assembly is completely self-contained including oil cooling in 10 exit vanes.

Source record↗

Portable Hydraulic Powerpack

Rechargeable hydraulic powerpack functions as lightweight, compact source of mechanical energy. Self-contained hydraulic powerpack derives energy from solid chemical charge. Combustion of charge initiated by small hammer, and revolving feeder replaces charges expended. Combustion gases cool during expansion in turbine and not too hot for release to atmosphere. Unit has applications driving wheelchairs and operating drills, winches, and other equipment in remote areas. Also replaces electric motors and internal-combustion engines as source of power in explosive atmospheres.

Anderson, L. A.↗

Metaanalysis of liana and tree functional traits

The objectives of this project were (i) to determine how tropical trees and lianas differed in terms of their functional traits, and (ii) to parameterize a computational model of tree-liana competition. We carried out a meta-analysis of tree and liana functional traits in order to achieve these goals. First, we downloaded functional trait data from the TRY database during November and December 2019. Traits of interest included leaf, wood, and root functional traits. We included only angiosperm tree and liana species that are found in tropical biomes. We then computed the species average for each trait. The results are included in “TRY_traits_metaanalysis.csv”. We also conducted a second meta-analysis focused on the hydraulic traits of tropical trees and lianas. We used Google Scholar and Web of Science to identify papers that contained hydraulic trait values. The papers that we found were all published between 1997-2019. As with our TRY-based meta-analysis, we included only angiosperm tree and liana species that are found in the tropics, and we computed species averages. The results are contained in the file “hydraulic_traits_metaanalysis.csv”. Both files are in csv format, so they can be read with any plain text editor, as well as programs like R or Excel.

54 ENVIRONMENTAL SCIENCES↗

Tilting table for ergometer and for other biomedical devices

The apparatus is for testing the human body in a variety of positions, ranging from the vertical to the supine, while exercising on an ergometer; and can also be used for angular positioning of other biomedical devices. It includes a floor plate and a hinged plate upon which to fix the ergometer, a back rest and a head rest attached at right angles to said hinged plate and behind the seat of the ergometer, dual hydraulic cylinders for raising and lowering the hinged plate through 90 deg by means of a self contained hydraulic system, with valve means for control and positive stops on the apparatus to prevent over travel. Tests can be made with the subject positioned on the seat of the ergometer, through the various angles, with a substantially normal body attitude relative to the seat and ergometer.

Gause, R. L.↗

The Influence of Hydraulic Fracturing on Carbon Storage Performance: Hydraulic Fracturing in Carbon Storage

We report that conventional principles of the design and operation of geologic carbon storage (GCS) require injecting CO 2 below the caprock fracturing pressure to ensure the integrity of the storage complex. In nonideal storage reservoirs with relatively low permeability, pressure buildup can lead to hydraulic fracturing of the reservoir and caprock. While the GCS community has generally viewed hydraulic fractures as a key risk to storage integrity, a carefully designed stimulation treatment under appropriate geologic conditions could provide improved injectivity while maintaining overall seal integrity. A vertically contained hydraulic fracture, either in the reservoir rock or extending a limited height into the caprock, provides an effective means to access reservoir volume far from the injection well. Employing a fully coupled numerical model of hydraulic fracturing, solid deformation, and matrix fluid flow, we study the enabling conditions, processes, and mechanisms of hydraulic fracturing during CO 2 injection. A hydraulic fracture's pressure-limiting behavior dictates that the near-well fluid pressure is only slightly higher than the fracturing pressure of the rock and is insensitive to injection rate and mechanical properties of the formation. Although a fracture contained solely within the reservoir rock with no caprock penetration, would be an ideal scenario, poroelastic principles dictate that sustaining such a fracture could lead to continuously increasing pressure until the caprock fractures. We also investigate the propagation pattern and injection pressure responses of a hydraulic fracture propagating in a caprock subjected to heterogeneous in situ stress. In conclusion, the results have important implications for the use of hydraulic fracturing as a tool for managing storage performance.

58 GEOSCIENCES↗

Device having hybrid hydraulic-electric architecture

A device having a hybrid hydraulic-electric architecture includes a hydraulic pump/motor having first and second ports, and an electric motor. The device is configured to connect to two or more pressure rails, each pressure rail containing hydraulic fluid at a different pressure than the other pressure rails. A flow of hydraulic fluid from one of the pressure rails is driven through the hydraulic pump/motor, and a pressure difference exists between the first and second ports. The electric motor is configured to control a flow rate of the flow of hydraulic fluid and/or the pressure difference.

Li, Perry Yan-Ho↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗