Search NASA⌕ Search

SEARCH · Search NASA

Results for “hydroelectricity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Modeling and Assessment of Integrated Hydroelectric Power and Hydrogen Energy Storage

Environmental and regulatory constraints are increasingly posing challenges to the optimal operation of hydroelectric facilities. Hydrogen energy storage (HES) is well-suited to address these challenges.Using excess or low-cost hydroelectric power during off-peak hours to produce hydrogen can help reduce water spills and unlock opportunities for energy arbitrage. Moreover, the oxygen byproduct of electrolysis can be used to improve the dissolved oxygen (DO) levels in tailrace water. %, a key water quality metric for hydroelectric facilities.This paper presents an innovative framework for modeling and assessing the integrated hydroelectric-hydrogen system, considering subsystem constraints and coupling, benefits in spill water reduction and DO mitigation, as well as diverse hydrogen utilization, including re-electrification, blending with natural gas, and direct sales. Comprehensive case studies were conducted to assess the techno-economic performance of the integrated system in different deployment scenarios.

Energy storage, Hydrogen, Hydropower, Optimization↗

Impact of the Number of Applied Current Meter Sensors on the Accuracy of Flow Rate Measurements across a Range of Hydroelectric Facilities Indicative of the Domestic Hydroelectric Fleet

The following paper represents the results of an investigation into the impact of the number and placement of Current Meter (CM) flow sensors on the accuracy to which they are capable of predicting the overall flow rate. Flow measurement accuracy is of particular importance in multiunit plants because it plays a pivotal role in determining the operational efficiency characteristics of each unit, allowing the operator to select the unit (or combination of units) which most efficiently meet demand. Several case studies have demonstrated that optimization of unit dispatch has the potential to increase plant efficiencies from between 1 to 4.4 percent [2] [3]. Unfortunately current industry standards do not have an established methodology to measure the flow rate through hydropower units with short converging intakes (SCI); the only direction provided is that CM sensors should be used. The most common application of CM is horizontally, along a trolley which is incrementally lowered across a measurement cross section. As such, the measurement resolution is defined horizontally and vertically by the number of CM and the number of measurement increments respectively. There has not been any published research on the role of resolution in either direction on the accuracy of flow measurement. The work below investigates the effectiveness of flow measurement in a SCI by performing a case study in which point velocity measurements were extracted from a physical plant and then used to calculate a series of reference flow distributions. These distributions were then used to perform sensitivity studies on the relation between the number of CM and the accuracy to which the flow rate was predicted. The following research uncovered that a minimum of 795 plants contain SCI, a quantity which represents roughly 12% of total domestic hydropower capacity. In regards to measurement accuracy, it was determined that accuracy ceases to increase considerably due to strict increases in vertical resolution beyond the application of 49 transects. Moreover the research uncovered that the application of 5 CM (when applied at 49 vertical transects) resulted in an average accuracy of 95.6% and the application of additional sensors resulted in a linear increase in accuracy up to 17 CM which had an average accuracy of 98.5%. Beyond 17 CM incremental increases in accuracy due to the addition of CM was found decrease exponentially. Future work that will be performed in this area will investigate the use of computational fluid dynamics to acquire a broader range of flow fields within SCI.

Flow Measurement↗

Hydroelectric Cybersecurity Response and Recovery Overview

Protecting hydroelectric plants from incidents that adversely impact their cyber-physical systems presents unique challenges due to the plants’ widely dispersed geographic locations and varied configurations as well as the relative nascent nature of the cyberattacks targeting these facilities. To help hydroelectric plants better respond to and mitigate cybersecurity incidents, this Department of Energy Water Power Technologies Office Cyber Response & Recovery Overview document discusses the process of defining how a hydroelectric plant might respond to and recover from an anomalous event. In addition to this product, there are three other products meant to be distributed to a hydroelectric plant to assist in their cyber incident response and recovery. The first, a handy flip book that guides an operator in the midst of a cyber event through the R&R process of the incident and if the event warrants, through an emergency action plan to recover the plant itself. The second, a handy guide of hydroelectric and cyber guidance in responding to the cyber and physical systems within a hydroelectric plant. And the third is a correlated alignment of the steps an hydroelectric plant operator would take for both a cyber incident as well as an emergency response process if the event rises to a cyber incident affecting the safe and reliable operations of a hydroelectric plant.

13 HYDRO ENERGY↗

Drought Impacts on Hydroelectric Power Generation in the Western United States

The Western United States experiences large fluctuations in rain and snowfall from year to year, affecting river flows and reservoir levels throughout the region. This interannual variability in water resources leaves a strong signature on total annual energy generated by the region’s fleet of hydroelectric dams. In a wet year, like 2011, hydroelectric power can meet 30 percent of annual western electricity demand. That contribution can drop below 20 percent during severe drought years. Characterizing the contribution of hydroelectric power to the western generation portfolio during drought is crucial to understanding the resilience of the hydropower sector to climate-related risk, both now and in the future. This report analyzes the impacts of historical western droughts on hydroelectric power production by combining two decades’ worth of annual generation—recorded at more than 600 hydroelectric power plants—with historical climate data developed for distinct hydropower subregions of the West. The most extreme impacts of drought on hydroelectric power are found at individual dams where reservoir levels are so low that released water and thus generation becomes severely restricted. These isolated cases often receive widespread media attention, leading to a common misconception that hydroelectric power is an unreliable technology whose role will diminish over time as the western climate produces longer and more severe droughts. Yet, when aggregated to the scale of the West, the observational records of hydropower generation reveal a different story. Even during the most severe droughts experienced since the turn of the century, the western hydropower fleet sustained more than 80% of its typical annual generation. Observational data indicate that drought in 2021 led to the worst year for hydropower generation in the West since 2001, with total generation approximately 16 percent below the 21st century two-decade average. The year 2021 was particularly severe in California (second worst hydro year of last two decades, ~48 percent below average) and Oregon (worst hydro year of last two decades), while generation in Washington and Idaho was affected to a lesser degree (~12 percent below average for combined region). The year 2001 remains the year of lowest western hydropower generation of the twenty-first century so far, owing to extreme drought in the Pacific Northwest, where about two-thirds of western hydropower capacity is located. The primary reason for this relative stability is the diversity of weather across the West; drought rarely impairs hydroelectric power across all river basins at the same time.

13 HYDRO ENERGY↗

Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.

13 HYDRO ENERGY↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

Assessment of Opportunities for New United States Pumped Storage Hydroelectric Plants Using Existing Water Features as Auxiliary Reservoirs

In this assessment of opportunities for new pumped storage hydroelectric plants performed in support of the U.S. Department of Energy Water Power Program, the characteristics of existing U.S. pumped storage hydroelectric plants (PSHs) are reviewed to define criteria for selecting candidate sites for new pumped storage plants. These characteristics are discussed and are presented in an appendix table. Candidate sites for new PSHs using existing U.S. hydroelectric plants, non-powered dams, greenfield hydroelectric plant sites, and natural waterbodies as base plant locations and natural waterbodies as auxiliary reservoirs are identified using criteria based on PSHs. Characteristics of the candidate sites are discussed and their characteristic features are provided in the appendix tables and spreadsheets.

13 HYDRO ENERGY↗

Hydroelectric Power and Hydrogen Production Integration

Hydropower-based hydrogen production could introduce opportunities for new revenue streams for hydropower plants, including from energy storage and regeneration as well as from sale of the hydrogen product to external markets. Hydrogen-based energy storage and regeneration could also help support Idaho Power’s decarbonization goals by decreasing dependence on fossil-based peaking power plants. Additionally, integration of hydrogen production with hydropower generation could help address the issue of low dissolved oxygen river water conditions that commonly accompany hydropower plant operations by utilizing the oxygen byproduct from an electrolytic hydrogen production process as a resource for mitigation of low dissolved oxygen water conditions. Comprehensive techno-economic analysis of the hybrid hydroelectric and hydrogen energy storage system has revealed critical insights into the pathways and considerations for optimizing the economic value and environmental benefits of such systems. Among the three identified pathways of natural gas blending, regeneration, and direct sale of hydrogen, the direct sale of hydrogen emerges as the most profitable, particularly given the current pricing dynamics of hydrogen and electricity. However, as we anticipate a future grid characterized by higher renewable energy penetration, the landscape may evolve, featuring lower average electricity prices, heightened fluctuations, and more significant seasonal variations. Consequently, the attractiveness of electricity regeneration through hydrogen and the benefits of long-duration hydrogen storage are expected to increase substantially in such a dynamic energy scenario. The careful selection of component sizes within the hybrid system proves to be paramount for ensuring cost-effectiveness. Notably, the size of the hydrogen market has emerged as a critical determinant for the optimal size of the electrolyzer. Hydrogen storage should be sized to meet energy shifting requirements. The appropriate size of the fuel cell/microturbine generator hinges on the shape of electricity prices and the available revenue streams derived from participating in grid services. Striking the right balance among these components is essential for maximizing the overall efficiency and profitability of the hydrogen facility. Furthermore, the by-product of electrolysis, namely oxygen, introduces an additional dimension to the system's functionality. The oxygen generated can be effectively utilized for dissolved oxygen (DO) mitigation, particularly with larger electrolyzer sizes capable of satisfying the complete oxygen demand for this purpose. While the economic benefits derived from saved oxygen purchase costs may be relatively modest compared to other revenue streams, the environmental advantages of repurposing oxygen for DO mitigation could help Idaho Power meet their environmental obligations. In addition to the identified factors shaping the viability of hybrid hydrogen production and hydroelectric generation, it is noteworthy that the integration of hydrogen energy storage offers a unique advantage during unusually wet years. In such periods of increased water inflow, the hydrogen storage capacity serves as a valuable supplement to the reservoir. By utilizing hydrogen energy storage as a complementary reservoir, the system gains flexibility in reservoir management when dealing with fluctuations in water availability.

08 HYDROGEN↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

Impact of High Wind Power Penetration on Hydroelectric Unit Operations

The Western Wind and Solar Integration Study (WWSIS) investigated the operational impacts of very high levels of variable generation penetration rates (up to 35% by energy) in the western United States. This work examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators. The cost impacts of maintaining hydro unit flexibility are assessed and compared for a number of different modes of system operation.

13 HYDRO ENERGY↗

A hybrid robust-stochastic optimization approach for day-ahead scheduling of cascaded hydroelectric system in restructured electricity market

Uncertainties arising from complicated natural and market environments pose great challenges for the efficient operation of cascaded hydroelectric systems. To overcome these challenges, this paper studies the day-ahead scheduling of cascaded hydroelectric systems in a restructured electricity market with the presence of uncertainties in electricity price and natural water inflow. To properly model the uncertainty, we consider the unique characteristics of these two types of uncertainties and capture them via the uncertainty set and stochastic scenarios, respectively. Further, a hybrid robust-stochastic optimization model is developed to simultaneously hedge against these two types of uncertainties, which is formulated as a large-scale non-convex optimization problem with mixed integer recourse. After introducing linearization of nonlinear terms, a tailored hybrid decomposition scheme combining Lagrangian relaxation and Dantzig-Wolfe decomposition is adopted to achieve efficient computation of the proposed model. Two real-world cases are conducted to demonstrate the capability and characteristics of the proposed model and algorithms.

13 HYDRO ENERGY↗

Robust Optimization for the Day-Ahead Scheduling of Cascaded Hydroelectric Systems

Uncertain electricity prices resulting from the re-structuring of electricity market have brought new opportu-nities and challenges for hydroelectric producers. This paper presents a data-driven robust optimization approach for the day-ahead scheduling of cascaded hydroelectric systems (CHS) with electricity price uncertainty. In this paper, a minimum volume enclosing ellipsoid (MVEE) is adopted to construct an ellipsoidal uncertainty set that fully identifies and exploits the historical characteristics data. Here, a second-order conic optimization formulation of the robust counterpart is derived for efficient computation. A real-world case study is conducted to demonstrate the capability of the proposed optimization approach compared with the traditional robust optimization approach.

13 HYDRO ENERGY↗

Underground Pumped Hydroelectric Energy Storage

Underground pumped hydroelectric energy storage (UPHES) is an adaptation of conventional surface-pumped hydroelectric that uses an underground cavern or water structure as a lower reservoir. Conceptually, this seems a logical and sound solution to energy storage. The practical design and actual construction of large UPHES systems represent challenging tasks. Smaller UPHES systems may be more easily built, especially if existing underground and surface structures can be used. To date, no UPHES system, commercial or otherwise, has ever been installed and used. This chapter will overview concepts and design considerations for UPHES systems, both large and small.

25 ENERGY STORAGE↗

Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

13 HYDRO ENERGY↗