Search NASA⌕ Search

SEARCH · Search NASA

Results for “in-space construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

An integrated in-space construction facility for the 21st century

Preliminary results are presented of studies being conducted by NASA on the construction of very large spacecraft. The various approaches are discussed for constructing spacecraft and their relative merits. It is observed that the Space Station Freedom has all of the basic design characteristics to permit its growth into an in-space construction facility for very large spacecraft. Also it is noted that if disturbances from construction operations are intolerable to other Space Station experiments, a co-orbiting construction facility could be built using previously developed Space Station truss hardware and systems. A discussion is also presented of a new PATHFINDER research initiative on on-orbit construction. This research effort is aimed at developing construction methods for very large spacecraft and includes the development of a 100 meter long space crane.

Mikulas, Martin M., Jr.↗

The versatility of a truss mounted mobile transporter for in-space construction

The Mobile Transporter (MT) evolution from early erectable structures assembly activities is detailed. The MT operational features which are required to support astronauts performing on-orbit structure construction or spacecraft assembly functions are presented and discussed. Use of the MT to perform a variety of assembly functions is presented. Estimated EVA assembly times for a precision segmented reflector approximately 20 m in diameter are presented. The EVA/MT technique under study for construction of the reflector (and the entire spacecraft) is illustrated. Finally, the current status of development activities and test results involving the MT and Space Station structural assembly are presented.

Bush, Harold G.↗

Solar power satellite construction concepts

In-space construction of a photovoltaic solar power satellite that is 5 1/2 by 25 km in size and weighs 81,000 tons is discussed. One of the construction approaches being considered requires 1/8-size power collection satellite modules to be constructed in low earth orbit (LEO) and transported to geosynchronous orbit (GEO) using self-powered electric thrusters. At GEO, these 1/8-size modules are connected and the antenna is constructed and attached. This construction approach will require about 300 people at LEO and 380 people at GEO working 10 hour shifts for 90 day staytimes. This paper describes the construction operations and construction equipment. Also discussed are some of the human factors considerations.

Miller, K. H.↗

Orbital construction support equipment - Manned remote work station

The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

Nassiff, S. H.↗

Space construction results - The EASE/ACCESS flight experiment

NASA ground and flight test activities aimed at the development of in-space construction techniques for the assembly of Space-Station-sized structures are described. In particular, attention is given to the EASE and ACCESS flight experiments, the ground and water tank program, and operations in-flight including instrumentations. The baseline experiments demonstrate that erectable structures can be assembled effectively by astronauts in EVA. The average assembly time for a 45-foot truss was 25.5 minutes; the assembly rate was 3.6 struts per minute.

Bekey, I.↗

A space crane concept: Preliminary design and static analysis

Future in-space construction and assembly facilities will require the use of space cranes capable of supporting and manipulating large and massive loads. The large size of the space components being considered for construction will require that these cranes have a reach on the order of 100 meters. A space crane constructed from an erectable four-longeron truss beam with 19 5-sq-m truss bays is considered. This concept was selected to be compatible with the Space Station truss. This truss is hinged at three locations along its bottom edge and attached at one end to a rotary joint cantilevered to the assembly depot's main truss structure. The crane's boom sections are rotated by extensible longeron actuators located along the top edge of the beam. To achieve maximum position maneuvering capability for the crane requires that the individual sections be capable of rotating 180 degrees about the hinge point. This can only be accomplished by offsetting the hinges from the longeron axes. Since offset hinges introduce bending moments in the truss members, an analysis of the effect of hinge offsets on the load-carrying capacity of the structure is required. The objective of the static finite element analysis described is to determine the effect of various offset lengths on the overall bending stiffness of the crane and on the maximum stresses.

Mikulas, Martin M., Jr.↗

Structural concepts for very large (400-meter-diameter) solar concentrators

A general discussion of various types of large space structures is presented. A brief overview of the history of space structures is presented to provide insight into the current state-of-the art. Finally, the results of a structural study to assess the viability of very large solar concentrators are presented. These results include weight, stiffness, part count, and in-space construction time.

Mikulas, Martin M., Jr.↗

On trajectory generation for flexible space crane: Inverse dynamics analysis by LATDYN

For future in-space construction facility, one or more space cranes capable of manipulating and positioning large and massive spacecraft components will be needed. Inverse dynamics was extensively studied as a basis for trajectory generation and control of robot manipulators. The focus here is on trajectory generation in the gross-motion phase of space crane operation. Inverse dynamics of the flexible crane body is much more complex and intricate as compared with rigid robot link. To model and solve the space crane's inverse dynamics problem, LATDYN program which employs a three-dimensional finite element formulation for the multibody truss-type structures will be used. The formulation is oriented toward a joint dominated structure which is suitable for the proposed space crane concept. To track a planned trajectory, procedures will be developed to obtain the actuation profile and dynamics envelope which are pertinent to the design and performance requirements of the space crane concept.

Chen, G.-S.↗

Laser Beam Welding Advancements for In-Space Servicing, Assembly, and Manufacturing

NASA is currently working to develop in-space servicing, assembly, and manufacturing (ISAM) capabilities for low Earth orbit and the lunar surface. One crucial technology for this effort is laser beam welding. Laser systems can perform joining, cleaning, cutting, and repair activities, which will enable the construction of large in-space structures that could not fit on a single launch vehicle, such as trusses for solar panels, radiators, or communications infrastructure. Multiple projects studying laser welding for space applications are currently underway at NASA Marshall Space Flight Center. One of these, the DIsk-Shaped Configurable and Modular vAcuum uNit (DISCMAN), is a compact vacuum chamber designed to support parameter development for laser welding in microgravity. It contains a rotating platen with weld samples made from aluminum, steel, and titanium, a high-power infrared laser, and integrated pumps for pulling vacuum inside the sample cartridge. The DISCMAN payload is planned to launch to the International Space Station, where welds will be performed under sustained microgravity inside the Bishop Airlock. Another effort underway at Marshall is the Lunar Assembly and Servicing by Autonomous Robotics (LASAR) initiative. This project uses a space-rated robotic arm equipped with a laser weld head, wire feeder, and multiple cameras to perform welds in a thermal vacuum chamber simulating the lunar surface environment. Some of these welds are done on snowflake joints, which are specially designed to slot together to join segments of trussN structures, allowing for the construction of tall surface infrastructure. DISCMAN, LASAR, and other projects are being carried out to advance the technological maturity of in-space laser beam welding, collect data to inform computational models, and learn reliable processes for creating weld joints in space. This work supports NASA’s greater goals to expand humanity’s presence in low Earth orbit, establish a permanent moon base, and eventually send crewed missions to Mars and beyond.

Manufacturing↗

Laser Beam Welding Advancements for In-Space Servicing, Assembly, and Manufacturing

NASA is currently working to develop in-space servicing, assembly, and manufacturing (ISAM) capabilities for low Earth orbit and the lunar surface. One crucial technology for this effort is laser beam welding. Laser systems can perform joining, cleaning, cutting, and repair activities, which will enable the construction of large in-space structures that could not fit on a single launch vehicle, such as trusses for solar panels, radiators, or communications infrastructure. Multiple projects studying laser welding for space applications are currently underway at NASA Marshall Space Flight Center. One of these, the DIsk-Shaped Configurable and Modular vAcuum uNit (DISCMAN), is a compact vacuum chamber designed to support parameter development for laser welding in microgravity. It contains a rotating platen with weld samples made from aluminum, steel, and titanium, a high-power infrared laser, and integrated pumps for pulling vacuum inside the sample cartridge. The DISCMAN payload is planned to launch to the International Space Station, where welds will be performed under sustained microgravity inside the Bishop Airlock. Another effort underway at Marshall is the Lunar Assembly and Servicing by Autonomous Robotics (LASAR) initiative. This project uses a space-rated robotic arm equipped with a laser weld head, wire feeder, and multiple cameras to perform welds in a thermal vacuum chamber simulating the lunar surface environment. Some of these welds are done on snowflake joints, which are specially designed to slot together to join segments of trussN structures, allowing for the construction of tall surface infrastructure. DISCMAN, LASAR, and other projects are being carried out to advance the technological maturity of in-space laser beam welding, collect data to inform computational models, and learn reliable processes for creating weld joints in space. This work supports NASA’s greater goals to expand humanity’s presence in low Earth orbit, establish a permanent moon base, and eventually send crewed missions to Mars and beyond.

Robotics↗

Enabling technologies for transition to utilization of space-based resources and operations

This article explores a potential scenario for the further development of space infrastructure resources and operations management. It is a scenario that transitions from the current ground-based system to an architecture that is predominantly space-based by exploiting key mission systems in an operational support role. If this view is accurate, an examination of the range of potential infrastructure elements and how they might interact in a maximally productive space-based operations complex is needed, innovative technologies beyond the current Shuttle and Space Station legacy need to be identified, and research programs pursued. Development of technologies within the areas of telerobotics, machine autonomy, human autonomy, in-space manufacturing and construction, propulsion and energy is discussed.

Sadin, S. R.↗

Specific SPS construction studies: Operations and maintenance

Surface as well as in-space operations of the solar power satellite program are addressed. The primary end products of SPS industrial enterprise are shown SPS and its ground receiving antenna every six months; and (3) construction of electric cargo orbital transfer vehicles. The production of photovoltaic cells and solar blankets is also considered.

Miller, K. H.↗

The Lidar In-Space Technology Experiment (LITE)

A spaceborne lidar system is presently being constructed for flight aboard the U. S. Space Shuttle in early 1991. The experiment, Lidar In Space Technology Experiment (LITE), utilizes a neodymium:YAG laser and 0.85 meter effective diameter Cassegranian-configured telescope receiver for making elastic backscatter measurements. The laser will be frequency doubled and tripled simulataneously producing a 10 Hz rate of 200 mJ at 1064 nm, 400 mJ at 532 nm, and 150 mJ at 355 nm. The technological objectives of LITE are to evaluate lidar system operations in space, lidar techniques in space, and to provide a test bed for new lidar technologies in later flights. The measurement objectives include the determination of cloud top and planetary boundary layer heights, the measurement of tropospheric and stratospheric aerosols, and the measurement of temperature and density between 10 to 40 km altitude. Detailed simulations will be presented showing the errors associated with each of these measurement objectives. In addition, the experiment scenario will be described including measurement times, data flow, processing and archival, and initial plans for validation of the LITE data set with correlative measurements.

Mccormick, M. P.↗

Solar power satellite system definition study, phase 2. Part 1: Midterm briefing

An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.

Source record↗

Moisture loss from graphite structures for the Hubble Space Telescope

The construction and telescope assembly of the NASA's Hubble Space Telescope (HST) is described with particular reference to the features of its construction material. Due to the hygroscopic nature of the graphite-fiber reinforced epoxy, used for much of the structure of the HST, the telescope, when in orbit, suffers losses of water, absorbed during on-ground procedures, accompanied by shrinkage of the epoxy matrix, and needs periodic realignment. Using a combination of analytic, laboratory measured, and in-space measured data, an operational plan for adjusting the alignment of the HST is presented. The refocusing plan must take into account the preceding ground environment, as well as the prelaunch, lift-off, and predeployment environments of the HST-bearing Space Shuttle.

Facey, T. A.↗

A mobile work station concept for mechanically aided astronaut assembly of large space trusses

This report presents results of a series of truss assembly tests conducted to evaluate a mobile work station concept intended to mechanically assist astronaut manual assembly of erectable space trusses. The tests involved assembly of a tetrahedral truss beam by a pair of test subjects with and without pressure (space) suits, both in Earth gravity and in simulated zero gravity (neutral buoyancy in water). The beam was assembled from 38 identical graphite-epoxy nestable struts, 5.4 m in length with aluminum quick-attachment structural joints. Struts and joints were designed to closely simulate flight hardware. The assembled beam was approximately 16.5 m long and 4.5 m on each of the four sides of its diamond-shaped cross section. The results show that average in-space assembly rates of approximately 38 seconds per strut can be expected for struts of comparable size. This result is virtually independent of the overall size of the structure being assembled. The mobile work station concept would improve astronaut efficiency for on-orbit manual assembly of truss structures, and also this assembly-line method is highly competitive with other construction methods being considered for large space structures.

Heard, W. L., Jr.↗

A telerobotic system for automated assembly of large space structures

Future space missions such as polar platforms and antennas are anticipated to require large truss structures as their primary support system. During the past several years considerable research has been conducted to develop hardware and construction techniques suitable for astronaut assembly of truss structures in space. A research program has recently been initiated to develop the technology and to demonstrate the potential for automated in-space assembly of large erectable structures. The initial effort will be focussed on automated assembly of a tetrahedral truss composed of 2-meter members. The facility is designed as a ground based system to permit evaluation of assembly concepts and was not designed for space qualification. The system is intended to be used as a tool from which more sophisticated procedures and operations can be developed. The facility description includes a truss structure, motionbases and a robot arm equipped with an end effector. Other considerations and requirements of the structural assembly describe computer control systems to monitor and control the operations of the assembly facility.

Rhodes, Marvin D.↗