Search NASA⌕ Search

SEARCH · Search NASA

Results for “infrastructure planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Geologic Maps for Civil Engineering and Infrastructure Planning

The Artemis Program mandate for sustainable, long-term presence on the Moon requires learning to "Live Off the Land". Geologic maps enable a paradigm shift to model the development and scaling of infrastructure for robotic and human exploration inside a bounded system on the lunar surface. Relying on geologic maps produced from orbital data and robotic precursor missions, in-situ resource utilization (ISRU) will be required to produce infrastructure, building materials and consumables. The ISRU value chain must be mapped to identify linkages of resources, producers, processes and equipment capabilities for transforming excavated regolith into usable feedstocks. Coordination will be required to balance supply and demand across the whole system of lunar infrastructure and operations, at each stage of development.

Geologic Mapping↗

Civil tiltrotor missions and applications

In 1983, an FAA-sponsored National Rotorcraft Program sought to identify improvements to the national interurban transportation networks and determined that conventional helicopters did not have the potential to satisfy requirements because of a lack of capacity, high operational costs, and high noise levels. Tiltrotors, it was felt offered a better potential to improve interurban air transport service. In 1985, the FAA proposed a joint civil tiltrotor study with NASA and DOD that would capitalize on development of the military V-22 tiltrotor and document the potential of the commercial tiltrotor transport market. The results of a study on the mission and application of a civil tiltrotor is presented. This study addresses national issues and includes a market summary. A technical summary provides information on six design configurations and potential risk areas are identified. The development of a National Plan for a tiltrotor transportation system is recommended including civil tiltrotor technology development, infrastructure planning and development, a flight technology demonstration plan, and near term actions.

Clay, Bill↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Infrastructure dynamics: A selected bibliography

The term infrastructure is used to denote the set of life support and public service systems which is necessary for the development of growth of human settlements. Included are some basic references in the field of dynamic simulation, as well as a number of relevant applications in the area of infrastructure planning. The intent is to enable the student or researcher to quickly identify such applications to the extent necessary for initiating further work in the field.

Dajani, J. S.↗

Sensible Success

Commercial remote sensing uses satellite imagery to provide valuable information about the planet's features. By capturing light reflected from the Earth's surface with cameras or sensor systems, usually mounted on an orbiting satellite, data is obtained for business enterprises with an interest in land feature distribution. Remote sensing is practical when applied to large-area coverage, such as agricultural monitoring, regional mapping, environmental assessment, and infrastructure planning. For example, cellular service providers use satellite imagery to select the most ideal location for a communication tower. Crowsey Incorporated has the ability to use remote sensing capabilities to conduct spatial geographic visualizations and other remote-sensing services. Presently, the company has found a demand for these services in the area of litigation support. By using spatial information and analyses, Crowsey helps litigators understand and visualize complex issues and then to communicate a clear argument, with complete indisputable evidence. Crowsey Incorporated is a proud partner in NASA's Mississippi Space Commerce Initiative, with research offices at the John C. Stennis Space Center.

Source record↗

Anthropogenic Land-use Change and the Dynamics of Amazon Forest Biomass

This project was focused on assessing the effects of prevailing land uses, such as habitat fragmentation, selective logging, and fire, on biomass and carbon storage in Amazonian forests, and on the dynamics of carbon sequestration in regenerating forests. Ancillary goals included developing GIs models to help predict the future condition of Amazonian forests, and assessing the effects of anthropogenic climate change and ENS0 droughts on intact and fragmented forests. Ground-based studies using networks of permanent plots were linked with remote-sensing data (including Landsat TM and AVHRR) at regional scales, and higher-resolution techniques (IKONOS imagery, videography, LIDAR, aerial photographs) at landscape and local scales. The project s specific goals were quite eclectic and included: Determining the effects of habitat fragmentation on forest dynamics, floristic composition, and the various components of above- and below-ground biomass. Assessing historical and physical factors that affect trajectories of forest regeneration and carbon sequestration on abandoned lands. Extrapolating results from local studies of biomass dynamics in fragmented and regenerating forests to landscape and regional scales in Amazonia, using remote sensing and GIS. Testing the hypothesis that intact Amazonian forests are functioning as a significant carbon sink. Examining destructive synergisms between forest fragmentation and fire. Assessing the short-term impacts of selective logging on aboveground biomass. Developing GIS models that integrate current spatial data on forest cover, deforestation, logging, mining, highway and roads, navigable rivers, vulnerability to wild fires, protected areas, and existing and planned infrastructure projects, in an effort to predict the future condition of Brazilian Amazonian forests over the next 20-25 years. Devising predictive spatial models to assess the influence of varied biophysical and anthropogenic predictors on Amazonian deforestation.

Laurance, William F.↗

LUNAR REGOLITH:SMALL SCALE ROBOTIC SITE PREPARATION AND GEOTECHNICAL EXPERIMENTSWITH SCOOPS

NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. In addition, the use of Taguchi methods will minimize the number of needed experiments to explore critical input parameters.

R. P. Mueller↗

Experimental Considerations for Ground-Based Testing of Lunar Construction Technologies

NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed - Ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities - Use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameter

Moon↗

Lunar Regolith: Small Scale Robotic Site Preparation and Geotechnical Experiments with Scoops

- NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. - The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. - In addition, the use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameters. - The Jet Propulsion Lab is preparing to fly the COLDarm payload on a CLPS lunar mission with a geotechnical measurement scoop

Regolith↗

From Regolith to Living Off the Land: Formulating a Data Model to Catalog Lunar Construction Materials

Artemis Program objectives for sustainable, long-term presence on the Moon and more distant planetary surfaces will require learning to “Live off the Land”, relying on in-situ resource utilization to produce infrastructure and building materials from lunar regolith, icy subsurface deposits, and residual waste materials. Meeting demand for consumables while scaling development with resources found within the landing zone will require detailed data on the geology and environment of the lunar surface. Lunar infrastructure development will generate vast amounts of new engineering data regarding availability of processed feedstocks and their performance in building materials. Lunar engineering data accessible to program partners, research institutions and industry may help situate processes and specifications within the in-situ GIS context. Lunar missions to date have generated geological and ice favorability maps of the lunar surface, and recent technology studies have tested automated construction systems and novel material formulations using regolith simulants and binders. Current discussions focus on identifying key feedstocks, quantities required for nominal mission scenarios and infrastructure plans, and mapping the value chain from regolith to feedstock to consumables and construction materials.

lunar construction↗

From Regolith to Living Off the Land: Formulating a Data Model to Catalog Lunar Construction Materials

Artemis Program objectives for sustainable, long-term presence on the Moon and more distant planetary surfaces will require learning to “Live off the Land”, relying on in-situ resource utilization to produce infrastructure and building materials from lunar regolith, icy subsurface deposits, and residual waste materials. Meeting demand for consumables while scaling development with resources found within the landing zone will require detailed data on the geology and environment of the lunar surface. Lunar infrastructure development will generate vast amounts of new engineering data regarding availability of processed feedstocks and their performance in building materials. Lunar engineering data accessible to program partners, research institutions and industry may help situate processes and specifications within the in-situ GIS context. Lunar missions to date have generated geological and ice favorability maps of the lunar surface, and recent technology studies have tested automated construction systems and novel material formulations using regolith simulants and binders. Current discussions focus on identifying key feedstocks, quantities required for nominal mission scenarios and infrastructure plans, and mapping the value chain from regolith to feedstock to consumables and construction materials.

lunar construction↗

Technology requirements for an orbiting fuel depot: A necessary element of a space infrastructure

Advanced planning within NASA has identified several bold space exploration initiatives. The successful implementation of these missions will require a supporting space infrastructure which would include a fuel depot, an orbiting facility to store, transfer and process large quantities of cryogenic fluids. In order to adequately plan the technology development programs required to enable the construction and operation of a fuel depot, a multidisciplinary workshop was convened to assess critical technologies and their state of maturity. Since technology requirements depend strongly on the depot design assumptions, several depot concepts are presented with their effect on criticality ratings. Over 70 depot-related technology areas are addressed.

Stubbs, R. M.↗

Technology requirements for an orbiting fuel depot - A necessary element of a space infrastructure

Advanced planning within NASA has identified several bold space exploration initiatives. The successful implementation of these missions will require a supporting space infrastructure which would include a fuel depot, an orbiting facility to store, transfer and process large quantities of cryogenic fluids. In order to adequately plan the technology development programs required to enable the construction and operation of a fuel depot, a multidisciplinary workshop was convened to assess critical technologies and their state of maturity. Since technology requirements depend strongly on the depot design assumptions, several depot concepts are presented with their effect of criticality ratings. Over 70 depot-related technology areas are addressed.

Stubbs, R. M.↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

NASA Platform for Autonomous Systems (NPAS)

NASA Platform for Autonomous Systems (NPAS) is a disruptive software platform and processes being developed by the NASA Stennis Space Center (SSC) Autonomous Systems Laboratory (ASL). Autonomous operations are critical for the success, safety and crew survival of NASA deep space missions beyond low Earth orbit, including the Gateway, and for the future of cost-effective ground mission operations. NPAS represents the embodiment of an innovative paradigm for “thinking” autonomy in contrast to brute-force autonomy. NPAS uniquely addresses the requirements and integrates the primary functionalities for autonomous operations, in one platform that includes: (1) Integrated System Health Management (ISHM); (2) autonomy strategies, guided by system health and concepts of operations; (3) domain objects (system elements) and infrastructure to create complete application domain knowledge models (4) infrastructure to create, schedule, and execute mission plans; (5) infrastructure to develop user interfaces for comprehensive awareness; and (6) infrastructure to integrate distributed autonomous applications across networks. NPAS is a single platform that can be used to make any system operate with any desirable degree of autonomy, as well as provide comprehensive system awareness to operators and users.

Figueroa, Fernando↗

Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project focused on a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project aimed to study new methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars.

Infrastructure↗

NASA In Situ Data Needs to Support the Operational Calibration and Validation of Ocean Color Satellite Data Products

Calibrating ocean color satellite instruments and validating their data products requires temporal and spatial abundances of high quality in situ oceanographic data. The Consortium for Ocean Leadership Ocean Observing Initiative (OOl) is currently implementing a distributed array of in-water sensors that could provide a significant contribution to future ocean color activities. This workshop will scope the optimal way to use and possibly supplement the planned OOl infrastructure to maximize its utility and relevance for calibration and validation activities that support existing and planned NASA ocean color missions. Here, I present the current state of the art of NASA validation of ocean color data products, with attention to autonomous time-series (e.g., the AERONET -OC network of above-water radiometers), and outline NASA needs for data quality assurance metrics and adherence to community-vetted data collection protocols

Werdel, P. Jeremy↗

NASA STI Program Coordinating Council Eleventh Meeting: NASA STI Modernization Plan

The theme of this NASA Scientific and Technical Information Program Coordinating Council Meeting was the modernization of the STI Program. Topics covered included the activities of the Engineering Review Board in the creation of the Infrastructure Upgrade Plan, the progress of the RECON Replacement Project, the use and status of Electronic SCAN (Selected Current Aerospace Notices), the Machine Translation Project, multimedia, electronic document interchange, the NASA Access Mechanism, computer network upgrades, and standards in the architectural effort.

Source record↗