Search NASA⌕ Search

SEARCH · Search NASA

Results for “infrastructure upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Study to Compare the Failure Rates of Current Space Shuttle Ground Support Equipment with the New Pathfinder Equipment and Investigate the Effect that the Proposed GSE Infrastructure Upgrade Might Have to Reduce GSE Infrastructure Failures

The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.

Kennedy, Barbara J.↗

Infrastructure for Training and Partnershipes: California Water and Coastal Ocean Resources

The purpose of this project was to advance the existing ICESS/Bren School computing infrastructure to allow scientists, students, and research trainees the opportunity to interact with environmental data and simulations in near-real time. Improvements made with the funding from this project have helped to strengthen the research efforts within both units, fostered graduate research training, and helped fortify partnerships with government and industry. With this funding, we were able to expand our computational environment in which computer resources, software, and data sets are shared by ICESS/Bren School faculty researchers in all areas of Earth system science. All of the graduate and undergraduate students associated with the Donald Bren School of Environmental Science and Management and the Institute for Computational Earth System Science have benefited from the infrastructure upgrades accomplished by this project. Additionally, the upgrades fostered a significant number of research projects (attached is a list of the projects that benefited from the upgrades). As originally proposed, funding for this project provided the following infrastructure upgrades: 1) a modem file management system capable of interoperating UNIX and NT file systems that can scale to 6.7 TB, 2) a Qualstar 40-slot tape library with two AIT tape drives and Legato Networker backup/archive software, 3) previously unavailable import/export capability for data sets on Zip, Jaz, DAT, 8mm, CD, and DLT media in addition to a 622Mb/s Internet 2 connection, 4) network switches capable of 100 Mbps to 128 desktop workstations, 5) Portable Batch System (PBS) computational task scheduler, and vi) two Compaq/Digital Alpha XP1000 compute servers each with 1.5 GB of RAM along with an SGI Origin 2000 (purchased partially using funds from this project along with funding from various other sources) to be used for very large computations, as required for simulation of mesoscale meteorology or climate.

Siegel, David A.↗

NASA STI Program Coordinating Council Eleventh Meeting: NASA STI Modernization Plan

The theme of this NASA Scientific and Technical Information Program Coordinating Council Meeting was the modernization of the STI Program. Topics covered included the activities of the Engineering Review Board in the creation of the Infrastructure Upgrade Plan, the progress of the RECON Replacement Project, the use and status of Electronic SCAN (Selected Current Aerospace Notices), the Machine Translation Project, multimedia, electronic document interchange, the NASA Access Mechanism, computer network upgrades, and standards in the architectural effort.

Source record↗

The Engineering Review Board

The NASA Engineering Review Board (ERB) is a permanent panel established to create an information infrastructure upgrade plan to support modernization efforts. The ERB looks at concepts and proposals from a system-wide perspective and identifies critical review milestones in the modernization plan. The background, role, and future directions of the ERB are described.

Hunter, Judy↗

Modular, Adaptive, Reconfigurable Systems: Technology for Sustainable, Reliable, Effective, and Affordable Space Exploration

In order to execute the Vision for Space Exploration, we must find ways to reduce cost, system complexity, design, build, and test times, and at the same time increase flexibility to satisfy multiple functions. Modular, Adaptive, Reconfigurable System (MARS) technologies promise to set the stage for the delivery of system elements that form the building blocks of increasingly ambitious missions involving humans and robots. Today, space systems are largely specialized and built on a case-by-case basis. The notion of modularity however, is nothing new to NASA. The 1970's saw the development of the Multi-Mission Modular spacecraft (MMS). From 1980 to 1992 at least six satellites were built under this paradigm, and included such Goddard Space Flight Center missions as SSM, EUVE, UARS, and Landsat 4 and 5. Earlier versions consisted of standard subsystem "module" or "box" components that could be replaced within a structure based on predefined form factors. Although the primary motivation for MMS was faster/cheaper integration and test, standardization of interfaces, and ease of incorporating new subsystem technology, it lacked the technology maturity and programmatic "upgrade infrastructure" needed to satisfy varied mission requirements, and ultimately it lacked user buy-in. Consequently, it never evolved and was phased out. Such concepts as the Rapid Spacecraft Development Office (RSDO) with its regularly updated catalogue of prequalified busses became the preferred method for acquiring satellites. Notwithstanding, over the past 30 years since MMS inception, technology has advanced considerably and now modularity can be extended beyond the traditional MMS module or box to cover levels of integration, from the chip, card, box, subsystem, to the space system and to the system-of-systems. This paper will present the MARS architecture, cast within the historical context of MMS. Its application will be highlighted by comparing a state-of-the-art point design vs. a MARS-enabled lunar mission, as a representative robotic case design.

Esper, Jaime↗

Alternative Fuels Research Laboratory

NASA Glenn has invested over $1.5 million in engineering, and infrastructure upgrades to renovate an existing test facility at the NASA Glenn Research Center (GRC), which is now being used as an Alternative Fuels Laboratory. Facility systems have demonstrated reliability and consistency for continuous and safe operations in Fischer-Tropsch (F-T) synthesis and thermal stability testing. This effort is supported by the NASA Fundamental Aeronautics Subsonic Fixed Wing project. The purpose of this test facility is to conduct bench scale F-T catalyst screening experiments. These experiments require the use of a synthesis gas feedstock, which will enable the investigation of F-T reaction kinetics, product yields and hydrocarbon distributions. Currently the facility has the capability of performing three simultaneous reactor screening tests, along with a fourth fixed-bed reactor for catalyst activation studies. Product gas composition and performance data can be continuously obtained with an automated gas sampling system, which directly connects the reactors to a micro-gas chromatograph (micro GC). Liquid and molten product samples are collected intermittently and are analyzed by injecting as a diluted sample into designated gas chromatograph units. The test facility also has the capability of performing thermal stability experiments of alternative aviation fuels with the use of a Hot Liquid Process Simulator (HLPS) (Ref. 1) in accordance to ASTM D 3241 "Thermal Oxidation Stability of Aviation Fuels" (JFTOT method) (Ref. 2). An Ellipsometer will be used to study fuel fouling thicknesses on heated tubes from the HLPS experiments. A detailed overview of the test facility systems and capabilities are described in this paper.

Surgenor, Angela D.↗

Using GPS Receiver 1PPS Output to Verify Time Stamp Accuracy and Measure Propagation Delay

A simple pulse overlay circuit using a logic OR gate was developed to overlay a precise leading edge 1 pulse per second time reference marker from a global positioning system receiver onto a non-return -to- zero-level pulse code modulation telemetry data stream to validate time stamp accuracy and measure propagation delay in telemetry equipment. A pulse overlay (PO) circuit was designed to produce a time reference marker within a pulse code modulation (PCM) telemetry data stream that was recorded and analyzed to validate an IRIG Standard 106-17 Chapter 10 recorder’s time stamp accuracy [1]. A manufacturer of a newly purchased Chapter 10 recorder claimed the time stamp accuracy to be better than 10 microseconds (μs) with only IRIG-B120 (IRIG-B) input and better than 1 μs with IRIG-B and one pulse per second (1PPS) inputs. The PO circuit and a Chapter 10 recorder test setup were used to verify the vendor’s data-time synchronization claims and to justify infrastructure upgrade costs to connect additional cables to each purchased recorder. The circuit was also used to measure the propagation delay (PD) of a long distance Telemetry multiplexer/demultiplexer telecommunication system which the manufacturer did not provide a PD specification. Using the one pulse per second time reference marker of the global positioning system receiver and the pulse overlay circuit to overlay the one pulse per second variable pulse width signal into a pulse code modulation telemetry stream provided an excellent means to validate time stamp accuracy within a Chapter 10 recorder and to measure propagation delays within a normal telemetry operating environment. The positive results from the Chapter 10 recorder tests validated the vendor’s claims and justified the implementation to add the one pulse per second signal to the range Chapter 10 recorders. The pulse overlay circuit and test setups defined in this paper can easily be used to measure other telemetry equipment.

Knudtson, Kevin↗

Airports as Energy Nodes Activity Summary

Advanced aircraft concepts that use non-traditional aviation energy storage methods such as batteries or cryogenic hydrogen are in development and expected to enter regular service at airports worldwide within the next decade. The energy needs for these aircraft may quickly overwhelm the existing energy infrastructure at airports, particularly at smaller and more remote facilities. Without energy upgrades, these airports will not be able to host these advanced vehicles, but without the advanced vehicle traffic, these airports will not have the rationale or funding to build up their energy infrastructure. The Airports as Energy Nodes (ÆNodes) activity, a collaboration between the National Aeronautics and Space Administration (NASA) and the National Renewable Energy Laboratory (NREL), was executed to understand and model the energy needs that advanced aircraft concepts may levy on these smaller airports, determine cost-effective approaches to enhance the airport energy infrastructure, and demonstrate the enhanced resilience of these energy infrastructure upgrades to the airport and surrounding community via “digital twin” simulation at relevant energy and dynamic time scales. The ÆNodes team also investigated future reference aircraft designs and materials to enable cryogenic hydrogen storage for aircraft. The ÆNodes team conducted analysis at two U.S. airport partner sites — Winchester Regional Airport in Winchester, Virginia, and Tweed/New Haven Airport in New Haven, Connecticut. The goal of this partnership was to develop data and reference infrastructure designs that could accommodate advanced aircraft in the future at these airports while also enhancing the resiliency of the energy supply to the surrounding airport community, which could be used to capture funding to enable the infrastructure upgrades. Over the course of the study, a method was developed to estimate air traffic requiring advanced energy services over the course of a year using a mix of historical data and companion studies on advanced aircraft transportation networks. The study has concluded at NASA but continues at NREL, who will develop a final report discussing the energy infrastructure upgrades and digital twin results. Preliminary results indicate that unrestricted adoption of advanced battery-electric aircraft may double traffic at these airports and increase peak daily power usage by an order of magnitude, while increase electricity energy needs by a factor of two to four. The infrastructure upgrades necessary to accommodate these increased energy needs could be used to provide enhanced energy services to the airport community to offset the cost and increase the utility of the upgrades, which will be described in the NREL final report.

Airports↗

James Webb Space Telescope - L2 Communications for Science Data Processing

JWST is the first NASA mission at the second Lagrange point (L2) to identify the need for data rates higher than 10 megabits per second (Mbps). JWST will produce approximately 235 Gigabits of science data every day that will be downlinked to the Deep Space Network (DSN). To get the data rates desired required moving away from X-band frequencies to Ka-band frequencies. To accomplish this transition, the DSN is upgrading its infrastructure. This new range of frequencies are becoming the new standard for high data rate science missions at L2. With the new frequency range, the issues of alternatives antenna deployment, off nominal scenarios, NASA implementation of the Ka-band 26 GHz, and navigation requirements will be discussed in this paper. JWST is also using Consultative Committee for Space Data Systems (CCSDS) standard process for reliable file transfer using CCSDS File Delivery Protocol (CFDP). For JWST the use of the CFDP protocol provides level zero processing at the DSN site. This paper will address NASA implementations of Ground Stations in support of Ka-band 26 GHz and lesson learned from implementing a file base (CFDP) protocol operational system.

Johns, Alan↗

EDOS Evolution to Support NASA Future Earth Sciences Missions

This paper presents a ground system architecture to service future NASA decadal missions and in particular, the high rate science data downlinks, by evolving EDOS current infrastructure and upgrading high rate network lines. The paper will also cover EDOS participation to date in formulation and operations concepts for the respective missions to understand the particular mission needs and derived requirements such as data volumes, downlink rates, data encoding, and data latencies. Future decadal requirements such as onboard data recorder management and file protocols drive the need to emulate these requirements within the ground system. The EDOS open system modular architecture is scalable to accommodate additional missions using the current sites antennas and future sites as well and meet the data security requirements and fulfill mission's objectives

Cordier, Guy R.↗

Upgrading the 14x22 Data Acquisition System (DAS)

The 14-by 22-Foot Subsonic Tunnel recently completed development and installation of a new Data Acquisition System for use in the tunnel and in the Rotor Test Cell (RTC). Planning and development of this new system has been ongoing for several years, and installation was performed over this past year. This effort also required an upgrade of the facility infrastructure to support the upgraded power and cooling requirements. This presentation summarizes the new data acquisition system, improved capabilities, challenges of installation, and proposed future enhancements to the system.

wind tunnel↗

Evolution of the Lunar Network

The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.

Gal-Edd, Jonathan↗

The Small Aircraft Transportation System for America: A Case in Public Infrastructure Change

The National Aeronautics and Space Administration (NASA), U.S. Department of Transportation, Federal Aviation Administration, industry stakeholders, and academia, have joined forces to pursue the NASA National General Aviation Roadmap leading to a Small Aircraft Transportation System (SATS). This strategic undertaking has a 25-year goal to bring next-generation technologies and improve travel between remote communities and transportation centers in urban areas by utilizing the nation's 5,400 public-use general aviation airports. To facilitate this initiative, a comprehensive upgrade of public infrastructure must be planned, coordinated, and implemented within the framework of the national air transportation system. The Nebraska NASA EPSCoR Program has proposed to deliver research support in key public infrastructure areas in coordination with the General Aviation Program Office at the NASA Langley Research Center. Ultimately, SATS may permit tripling aviation system throughput capacity by tapping the underutilized general aviation facilities to achieve the national goal of doorstep-to-destination travel at four times the speed of highways for the nation's suburban, rural, and remote communities.

Bowen, Brent D.↗

Space Station evolution

The Space Station that will be launched and made operational in the early 1990s should be viewed as a beginning, a facility that will evolve with the passing of time to better meet the needs and requirements of a diverse set of users. Evolution takes several forms, ranging from simple growth through addition of infrastructure elements to upgrading of system capability through inclusion of advanced technologies. Much of the early considerations of Space Station evolution focused on physical growth. However, a series of recent workshops have revealed that the more likely mode of Space Station evolution will not be through growth but rather through a process known as 'branching'.

Black, David C.↗

NASA EPSCoR Nebraska Preparation Grant: Year 1. Research Cluster: Small Aircraft Transportation System/Nebraska Implementation Template (SATS-NIT)

NASA, the U.S. Department of Transportation/Federal Aviation Administration, industry stakeholders, and academia have joined forces to pursue the NASA National General Aviation Roadmap leading to a Small Aircraft Transportation System (SATS). This strategic undertaking has a 25-year goal to improve air access and bring next-generation technologies to small communities. The envisioned outcome is to improve travel between remote communities and transportation centers in urban areas by utilizing the nation's 5,400 public use general aviation airports. To facilitate this initiative, SATS stakeholders must plan, coordinate, and implement a comprehensive upgrade of public infrastructure within the framework of the national air transportation system. Ultimately, SATS may permit tripling aviation system throughput capacity by tapping the under-utilized airspace and general aviation facilities. The SATS investments, which begin in FY 2001, are designed to support the national goal of doorstep-to-destination travel at four times the speed of highways for the nation's suburban, rural, and remote communities.

Bartle, John R.↗

Development of a 21st Century Small Aircraft Transportation System

The National Aeronautics and Space Administration (NASA), U.S. Department of Transportation, Federal Aviation Administration, industry stakeholders, and academia, have joined forces to pursue the NASA National General Aviation Roadmap leading to a Small Aircraft Transportation System (SATS). This strategic undertaking has a 25-year goal to bring the next-generation technologies and improve travel between remote communities and transportation centers in urban areas by utilizing the nation's 5,400 public use general aviation airports. To facilitate this initiative, a comprehensive upgrade of public infrastructure must be planned, coordinated, and implemented within the framework of the national air transportation system. The Nebraska NASA EPSCoR Program has proposed to deliver research support in key public infrastructure areas in coordination with the General Aviation Program Office at the NASA Langley Research Center. Ultimately, SATS may permit tripling aviation system throughput capacity by tapping the underutilized general aviation facilities to achieve the national goal of doorstep-to-destination travel at four times the speed of highways for the nation's suburban, rural, and remote communities.

Bowen, Brent D.↗

National General Aviation Roadmap for a Small Aircraft Transportation System (SATS)

The National Aeronautics and Space Administration (NASA), Federal Aviation Administration, as well as state, industry, and academia partners have joined forces to pursue the NASA National General Aviation Roadmap leading to a Small Aircraft Transportation System (SATS). This long-term strategic undertaking has a goal to bring next-generation technologies and improve air access to small communities. The envisioned outcome is to improve travel between remote communities and transportation centers in urban areas by utilizing a new generation of single-pilot light planes for personal and business transportation between the nation's 5,400 public use general aviation airports. Current NASA investments in aircraft technologies are enabling industry to bring affordable, safe, and easy-to-use features to the marketplace, including "Highway in the Sky" glass cockpit operating capabilities, affordable crash worthy composite airframes, more efficient IFR flight training, and revolutionary engines. To facilitate this initiative, a comprehensive upgrade of public infrastructure must be planned, coordinated, and implemented within the framework of the national air transportation system. State partnerships are proposed to coordinate research support in key public infrastructure areas. Ultimately, SATS may permit more than tripling aviation system throughput capacity by tapping the under-utilized general aviation facilities to achieve the national goal of doorstep-to-destination travel at four times the speed of highways for the nation's suburban, rural, and remote communities.

Holmes, Bruce J.↗