Search NASASearch

SEARCH · Search NASA

Results for “integrated distribution system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Interfacing Space Communications and Navigation Network Simulation with Distributed System Integration Laboratories (DSIL)

NASA's planned Lunar missions will involve multiple NASA centers where each participating center has a specific role and specialization. In this vision, the Constellation program (CxP)'s Distributed System Integration Laboratories (DSIL) architecture consist of multiple System Integration Labs (SILs), with simulators, emulators, testlabs and control centers interacting with each other over a broadband network to perform test and verification for mission scenarios. To support the end-to-end simulation and emulation effort of NASA' exploration initiatives, different NASA centers are interconnected to participate in distributed simulations. Currently, DSIL has interconnections among the following NASA centers: Johnson Space Center (JSC), Kennedy Space Center (KSC), Marshall Space Flight Center (MSFC) and Jet Propulsion Laboratory (JPL). Through interconnections and interactions among different NASA centers, critical resources and data can be shared, while independent simulations can be performed simultaneously at different NASA locations, to effectively utilize the simulation and emulation capabilities at each center. Furthermore, the development of DSIL can maximally leverage the existing project simulation and testing plans. In this work, we describe the specific role and development activities at JPL for Space Communications and Navigation Network (SCaN) simulator using the Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) tool to simulate communications effects among mission assets. Using MACHETE, different space network configurations among spacecrafts and ground systems of various parameter sets can be simulated. Data that is necessary for tracking, navigation, and guidance of spacecrafts such as Crew Exploration Vehicle (CEV), Crew Launch Vehicle (CLV), and Lunar Relay Satellite (LRS) and orbit calculation data are disseminated to different NASA centers and updated periodically using the High Level Architecture (HLA). In addition, the performance of DSIL under different traffic loads with different mix of data and priorities are evaluated.

Traffic Measuring and Monitoring

Towards G2G: Systems of Technology Database Systems

We present an approach and methodology for developing Government-to-Government (G2G) Systems of Technology Database Systems. G2G will deliver technologies for distributed and remote integration of technology data for internal use in analysis and planning as well as for external communications. G2G enables NASA managers, engineers, operational teams and information systems to "compose" technology roadmaps and plans by selecting, combining, extending, specializing and modifying components of technology database systems. G2G will interoperate information and knowledge that is distributed across organizational entities involved that is ideal for NASA future Exploration Enterprise. Key contributions of the G2G system will include the creation of an integrated approach to sustain effective management of technology investments that supports the ability of various technology database systems to be independently managed. The integration technology will comply with emerging open standards. Applications can thus be customized for local needs while enabling an integrated management of technology approach that serves the global needs of NASA. The G2G capabilities will use NASA s breakthrough in database "composition" and integration technology, will use and advance emerging open standards, and will use commercial information technologies to enable effective System of Technology Database systems.

Maluf, David A.

Automated Planning and Scheduling for Planetary Rover Distributed Operations

Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

Backes, Paul G.

Autonomous mission planning and scheduling: Innovative, integrated, responsive

Autonomous mission scheduling, a new concept for NASA ground data systems, is a decentralized and distributed approach to scientific spacecraft planning, scheduling, and command management. Systems and services are provided that enable investigators to operate their own instruments. In autonomous mission scheduling, separate nodes exist for each instrument and one or more operations nodes exist for the spacecraft. Each node is responsible for its own operations which include planning, scheduling, and commanding; and for resolving conflicts with other nodes. One or more database servers accessible to all nodes enable each to share mission and science planning, scheduling, and commanding information. The architecture for autonomous mission scheduling is based upon a realistic mix of state-of-the-art and emerging technology and services, e.g., high performance individual workstations, high speed communications, client-server computing, and relational databases. The concept is particularly suited to the smaller, less complex missions of the future.

Sary, Charisse

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.

A failure management prototype: DR/Rx

This failure management prototype performs failure diagnosis and recovery management of hierarchical, distributed systems. The prototype, which evolved from a series of previous prototypes following a spiral model for development, focuses on two functions: (1) the diagnostic reasoner (DR) performs integrated failure diagnosis in distributed systems; and (2) the recovery expert (Rx) develops plans to recover from the failure. Issues related to expert system prototype design and the previous history of this prototype are discussed. The architecture of the current prototype is described in terms of the knowledge representation and functionality of its components.

Hammen, David G.

Real-time contingency handling in MAESTRO

A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.

Britt, Daniel L.

Distributed Simulation for Space Exploration

This viewgraph presentation reviews the use of simulation and modeling in preparation for the planned exploration initiatives. The Exploration Systems Mission Directorate (EMSD) Integrated Modeling and Simulation (IM&S) team strategy encompasses a wide spectrum of simulation and modeling policies and technologies. One prominent technology is distributed simulation. The DIstributed Simulation (DIS),a collaborative simulation project with international participation (US and Japan) is reviewed as an example of distributed simulation development. The Distributed Space Exploration Simulation (DSES) is another example of distributed simulation that is described

Crues, Edwin Z.

Concepts in distributed planning, scheduling, and control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling, and control must allow for: (1) interactive real-time remote operations; (2) responsive scheduling and rescheduling; (3) support of the full range of distributed science, application and commercial users; (4) interaction and cooperation among distributed users; and (5) efficient use of often onboard, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe approaches to distributed planning, scheduling and control functions that are based on resources and on a distributed knowledge hierarchy. We describe the scheduling functions as the component of the integrated space-ground Operations Management System. We include the integration of the planning and scheduling functions with the real-time operations control system, and we discuss automated scheduling assistants. These suggested approaches, taken from the users' point-of-view, have resulted in two prototype systems: Operations and Science Instrument Support package and Science User Resource Planning and Scheduling System.

Hansen, Elaine

Study of optimum propellant production facilities for launch of space shuttle vehicles

An integrated propellant manufacturing plant and distribution system located at Kennedy Space Center is studied. The initial planned propellant and pressurant production amounted to 160 tons/day (TPD) LH2, 10 TPD GH2, 800 TPD LO2, 400 TPD LN2, and 120 TPD GN2. This was based on a shuttle launch frequency of 104 per year. During the study, developments occurred which may lower cryogen requirements. A variety of plant and processing equipment sizes and costs are considered for redundancy and supply level considerations. Steam reforming is compared to partial oxidation as a means of generating hydrogen. Electric motors, steam turbines, and gas turbines are evaluated for driving compression equipment. Various sites on and off Government property are considered to determine tradeoffs between costs and problems directly associated with the site, product delivery and storage costs, raw material costs, and energy costs. Coproduction of other products such as deuterium, methanol, and ammonia are considered. Legal questions are discussed concerning a private company's liabilities and its rights to market commercial products under Government tax and cost shelters.

Laclair, L. M.

Distributed Avionics and Software Verification for the Constellation Program

This viewgraph presentation reviews the planned verification of the avionics and software being developed for the Constellation program.The Constellation Distributed System Integration Laboratory (DSIL) will consist of multiple System Integration Labs (SILs), Simulators, Emulators, Testbeds, and Control Centers interacting with each other over a broadband network to provide virtual test systems for multiple test scenarios.

Hood, Laura E.

Adaptive planning for applications with dynamic objectives

We devise a qualitative control layer to be integrated into a real-time multi-agent reactive planner. The reactive planning system consists of distributed planning agents attending to various perspectives of the task environment. Each perspective corresponds to an objective. The set of objectives considered are sometimes in conflict with each other. Each agent receives information about events as they occur, and a set of actions based on heuristics can be taken by the agents. Within the qualitative control scheme, we use a set of qualitative feature vectors to describe the effects of applying actions. A qualitative transition vector is used to denote the qualitative distance between the current state and the target state. We will then apply on-line learning at the qualitative control level to achieve adaptive planning. Our goal is to design a mechanism to refine the heuristics used by the reactive planner every time an action is taken toward achieving the objectives, using feedback from the results of the actions. When the outcome is compared with expectations, our prior objectives may be modified and a new set of objectives (or a new assessment of the relative importance of the different objectives) can be introduced. Because we are able to obtain better estimates of the time-varying objectives, the reactive strategies can be improved and better prediction can be achieved.

Hadavi, Khosrow

Predicting Crew Time Allocations for Lunar Orbital Missions Based on Historical ISS Operational Activities

As the National Aeronautics and Space Administration continues to define candidate architectures for the planned lunar “Gateway”, it will be necessary to have a detailed understanding of how the crew will inhabit, operate, and maintain the spacecraft. The nature of the Gateway vehicle systems configuration and operations will have a direct impact on the scope of work activities required of the crew. Crew work schedules are sensitive to variations in spacecraft architecture, visiting vehicle activities, and logistics operations – particularly within short duration missions as initially planned for the lunar Gateway. These system and operational configurations must be taken into account when planning for crew time availability to conduct science activities on Gateway missions. This paper presents a methodology that is used to predict crew time distributions for lunar Gateway missions, as applied in NASA’s Exploration Crew Time Model (ECTM). The process utilized for evaluating crew time distributions is based on the categorization of all crew activities into a standardized ontology. Historical ISS daily crew timeline data from July 20, 2011 (post STS retirement) to present day was captured via the Operational Planning Timeline Integration System (OPTimIS) database and characterized according to the standardized ontology. This process enabled correlation and statistical analysis of the ISS data according to common mission parameters such as crew size, ECLSS system design, vehicle traffic operations, and logistics delivery operations. The results of the statistical analysis are a set of crew time distributions for each activity category. These distributions are then utilized within the ECTM to examine crew time allocations based on mission parameter inputs, which serve to characterize the Gateway mission configurations. Results for predicted crew time allocations for representative short duration Gateway missions are presented. These results can be used to evaluate crew schedule availability for science and utilization activities. Variations in expected mission architectures and mission operations are accounted for to correct crew time predictions. The analysis is being leveraged to plan utilization capability objectives that are achievable on the Gateway missions, as well as inform the viability of various mission architecture options.

Stromgren, Chel

An intelligent robotics control scheme

The problem of robot control is viewed at the level of communicating high-level commands produced by intelligent algorithms to the actuator/sensor controllers. Four topics are considered in the design of an integrated control and communications scheme for an intelligent robotic system: the use of abstraction spaces, hierarchical versus heterarchical control, distributed processing, and the interleaving of the steps of plan creation and plan execution. A scheme is presented for an n-level distributed hierarchical/heterarchical control system that effectively interleaves intelligent planning, execution, and sensory feedback. A three-level version of this scheme has been successfully implemented in the Intelligent Systems Research Lab at NASA Langley Research Center. This implementation forms the control structure for DAISIE (Distributed Artificially Intelligent System for Interacting with the Environment), a testbed system integrating AI software with robotics hardware.

Orlando, N. E.

NASA's Next Generation Space Geodesy Program

Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard's Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA's contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.

Merkowitz, S. M.