Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Logic of Integrating Conventional and Nuclear Planning [Integration of conventional and nuclear: What does it mean?]

In October 2015, Secretary of Defense Carter called for NATO to better integrate conventional and nuclear deterrence. Four months later, Assistant Secretary of Defense Robert Scher stated in Senate testimony that the DoD is "working to ensure an appropriate level of integration between nuclear and conventional planning and operations."

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

National Reactor Innovation Center (NRIC) Infrastructure Integration Plan

The NRIC Infrastructure Integration Plan serves as a roadmap for integrating future test reactors at the Idaho National Laboratory’s (INL’s) desert Site into core infrastructure and services required for reactor operations. This document is not intended to serve as a requirements document, nor does it list all infrastructure requirements for each reactor planned for testing at the Site. It represents an overview of the most likely infrastructure and services that will be required by some or all the test reactors, as well as what infrastructure and services exist at the Site that have the potential to support and enable NRIC test reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: {center_dot}as a tool and process for achieving more sustainable and strategic planning; {center_dot}to determine the level of integration of SEA within the planning system; and, {center_dot}its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

54 ENVIRONMENTAL SCIENCES↗

Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

Nelson, J. G.↗

Migrating data from TcSE to DOORS : an evaluation of the T-Plan Integrator software application.

This report describes our evaluation of the T-Plan Integrator software application as it was used to transfer a real data set from the Teamcenter for Systems Engineering (TcSE) software application to the DOORS software application. The T-Plan Integrator was evaluated to determine if it would meet the needs of Sandia National Laboratories to migrate our existing data sets from TcSE to DOORS. This report presents the struggles of migrating data and focuses on how the Integrator can be used to map a data set and its data architecture from TcSE to DOORS. Finally, this report describes how the bulk of the migration can take place using the Integrator; however, about 20-30% of the data would need to be transferred from TcSE to DOORS manually. This report does not evaluate the transfer of data from DOORS to TcSE.

99 GENERAL AND MISCELLANEOUS↗

New York City Energy-Water Integrated Planning: A Pilot Study

The New York City Energy-Water Integrated Planning Pilot Study is one of several projects funded by Sandia National Laboratories under the U.S. Department of Energy Energy-Water Nexus Program. These projects are intended to clarify some key issues and research needs identified during the Energy-Water Nexus Roadmapping activities. The objectives of the New York City Pilot Project are twofold: to identify energy-water nexus issues in an established urban area in conjunction with a group of key stakeholders and to define and apply an integrated energy and water decision support tool, as proof-of-concept, to one or more of these issues. During the course of this study, the Brookhaven National Laboratory project team worked very closely with members of a Pilot Project Steering Committee. The Steering Committee members brought a breadth of experience across the energy, water and climate disciplines, and all are well versed in the particular issues faced by an urban environment, and by New York City in particular. The first task was to identify energy-water issues of importance to New York City. This exercise was followed by discussion of the qualities and capabilities that an ideal decision support tool should display to address these issues. The decision was made to start with an existing energy model, the New York City version of the MARKAL model, developed originally at BNL and now used globally by many groups for energy analysis. MARKAL has the virtue of being well-vetted, transparent, and capable of calculating 'material' flows, such as water use by the energy system and energy requirements of water technology. The Steering Committee members defined five scenarios of interest, representing a broad spectrum of New York City energy-water issues. Brookhaven National Laboratory researchers developed a model framework (Water-MARKAL) at the desired level of detail to address the scenarios, and then attempted to gather the New York City-specific information required to analyze the scenarios using Water-MARKAL. This report describes the successes and challenges of defining and demonstrating the decision tool, Water-MARKAL. The issues that the stakeholders perceive for New York City are listed and the difficulties in gathering required information for Water-MARKAL to analyze these issues at the desired level of detail are described.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Load Forecasting in Electric Utility Integrated Resource Planning

Integrated resource planning (IRP) is a process used by many vertically-integrated U.S. electric utilities to determine least-cost/risk supply and demand-side resources that meet government policy objectives and future obligations to customers and, in many cases, shareholders. Forecasts of energy and peak demand are a critical component of the IRP process. There have been few, if any, quantitative studies of IRP long-run (planning horizons of two decades) load forecast performance and its relationship to resource planning and actual procurement decisions. In this paper, we evaluate load forecasting methods, assumptions, and outcomes for 12 Western U.S. utilities by examining and comparing plans filed in the early 2000s against recent plans, up to year 2014. We find a convergence in the methods and data sources used. We also find that forecasts in more recent IRPs generally took account of new information, but that there continued to be a systematic over-estimation of load growth rates during the period studied. We compare planned and procured resource expansion against customer load and year-to-year load growth rates, but do not find a direct relationship. Load sensitivities performed in resource plans do not appear to be related to later procurement strategies even in the presence of large forecast errors. These findings suggest that resource procurement decisions may be driven by other factors than customer load growth. Our results have important implications for the integrated resource planning process, namely that load forecast accuracy may not be as important for resource procurement as is generally believed, that load forecast sensitivities could be used to improve the procurement process, and that management of load uncertainty should be prioritized over more complex forecasting techniques.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automated radiotherapy treatment plan integrity verification

Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method of dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Transient Stability Analysis for Offshore Wind Power Plant Integration Planning Studies - Part II: Long Term Faults

Here, this paper addresses the transient stability (also called large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability, and frequency response for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted system' components present and is applicable to the study of both short term and long term faults. Part I of this research discussed the short term faults whereas as Part II, the present paper, discusses long term faults. This research considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000 MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.

17 WIND ENERGY↗

Transient Stability Analysis for Offshore Wind Power Plant Integration Planning Studies - Part I: Short Term Faults

Power system planning is the process of forecasting load demand and ensuring sufficient generation and reserve capacities over some planning horizon. This process includes investigation of steady-state and dynamic operation of power system of interest. This paper addresses the transient stability (also known as large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability and frequency response for all fault types for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted components present and is applicable to the study of both short term and long term faults, though only short term faults are considered here (long term faults are treated sequentially in a companion paper). Furthermore, this paper considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.

17 WIND ENERGY↗

Integrated plan for LArTPC neutrino detectors in the US

We present an integrated R&D plan aimed at demonstrating the ability to build a very large Liquid Argon Time Projection Chamber (LArTPC), on a scale suitable for use as a Far Detector for the LBNE neutrino oscillation experiment. This plan adopts current LArTPC R&D-related activities and proposes new ones to address questions that go beyond those being answered by the current efforts. We have employed a risk evaluation strategy to identify questions that can be answered (or risks that can be mitigated) through one or more R&D steps. In summary form, the plan consists of the following pre-existing components: (1) The Materials Test Stand program, now in operation at Fermilab, addressing questions pertaining to maintenance of argon purity; (2) Existing electronics test stands at FNAL and BNL; (3) The Liquid Argon Purity Demonstrator (LAPD) now being assembled at Fermilab; (4) The ArgoNeuT prototype LArTPC, now running in the NuMI beam; (5) The MicroBooNE experiment, proposed as a physics experiment that will advance our understanding of the LArTPC technology, now completing its conceptual design phase; (6) A software development effort that is well integrated across present and planned LArTPC detectors. We are proposing to add to these efforts the following: (1) A membrane cryostat mechanical prototype to evaluate and gain expertise with this technology; (2) An installation and integration prototype, to understand issues pertaining to detector assembly, particularly in an underground environment; (3) A {approx} 5% scale electronics systems test to understand system-wide issues as well as individual component reliability. (4) A calibration test stand that would consist of a small TPC to be exposed to a test beam for calibration studies, relevant for evaluation of physics sensitivities. We have developed a timeline and milestones for achieving these goals as discussed in Section 4. The proposed activities necessary for the final design of LAr20 are complete by CD3 in 2014.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Combined TREAT-LOC and SATS LOCA Experiment Plan: Integral LOCA Experiments on High-Burnup Fuels

The Transient Reactor Test Facility (TREAT) loss-of-coolant (LOC) and high-burnup (HBu) experiment series, along with the Severe Accident Test Station (SATS) HBu experiment series, are integral LOC accident (LOCA) experiments planned under the DOE AFC program, which aim to support burnup extension needs by addressing identified R&D priorities in order to achieve an improved understanding of fuel fragmentation, relocation, and dispersal (FFRD) of HBu fuel during LOCA events. The data produced under this plan will be used to further validate and confirm existing models and inform future R&D and model development. The experimental program has been specifically designed to address knowledge gaps and opportunities identified through a detailed review of existing public knowledge on LOCA FFRD. The test program employs a unique combination of in- and out-of-pile experimental approaches and state-of-the-art facilities to provide a clear connection to the existing integral and semi-integral LOCA experiment database. The primary goal of the program is to investigate the impact of prototypic HBu fuel/cladding thermomechanical behaviors under postulated LWR LOCA conditions that have not yet been fully studied. These conditions correspond with prototypic decay-energy heatup (DEH) and stored-energy heatup (SEH) conditions. Importantly, TREAT’s unique capability will enable the first evaluation of the impact of SEH conditions on HBu fuels. The test program will emphasize the development of an improved mechanistic understanding of key experimental phenomena through independent experimental systems, development of a database to support fuel performance modeling tools and employing world-leading advanced materials characterization and in-situ diagnostics to evaluate FFRD. The results of the program will provide novel data to support modeling development and validation and will represent a significant advancement in evaluating prototypic conditions, as well as to inform the technical basis for LOCA-induced FFRD.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Data-driven optimization of mixed-integer bi-level multi-follower integrated planning and scheduling problems under demand uncertainty

The coordination of interconnected elements across the different layers of the supply chain is essential for all industrial processes and the key to optimal decision-making. Yet, the modeling and optimization of such interdependent systems are still burdensome. Here we address the simultaneous modeling and optimization of medium-term planning and short-term scheduling problems under demand uncertainty using mixed-integer bi-level multi-follower programming and data-driven optimization. Bi-level multi-follower programs model the natural hierarchy between different layers of supply chain management holistically, while scenario analysis and data-driven optimization allow us to retrieve the guaranteed feasible solutions of the integrated formulation under various demand considerations. We address the data-driven optimization of this challenging class of problems using the DOMINO framework, which was initially developed to solve single-leader single-follower bi-level optimization problems to guaranteed feasibility. This framework is extended to solve single-leader multi-follower stochastic formulations and its performance is characterized by well-known single and multi-product process scheduling case studies. Through our data-driven algorithmic approach, we present guaranteed feasible solutions to linear and nonlinear mixed-integer bi-level formulations of simultaneous planning and scheduling problems and further characterize the effects of the scheduling level complexity on the solution performance, which spans over several hundred continuous and binary variables, and thousands of constraints.

42 ENGINEERING↗

FUEL PERFORMANCE SIMULATION OF HIGH BURNUP FUELS IN PLANNED INTEGRAL DESIGN BASIS ACCIDENT EXPERIMENTS

High burnup (HBu) fuel rods from the Byron Nuclear Generating Station (BNGS) were recently received at Idaho National Laboratory (INL) to support a variety of planned Nuclear Energy fuel cycle R&D objectives ranging from fuel performance, fuel recycle, and spent fuel research topics. Among these R&D activities, these fuel rods will be the subjects of multiple in-pile experiment programs at the Transient Reactor Test (TREAT) facility as well as detailed characterization and testing in the hot cells at INL and Oak Ridge National Laboratory (ORNL). TREAT RIA experiments are planned for the Nuclear Energy Agency Framework for Irradiation Experiments (FIDES) Joint Experimental Program called High burnup Experiments in Reactivity Initiated Accident (HERA) program. TREAT and ORNL-furnace LOCA experiments are part of the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program U.S. consensus LOCA test plan, and the in-pile experiments have also been proposed in a FIDES project called Loss of Coolant-High Burnup (LOC-HBu). The results of these test programs will provide crucial data about safety performance enabling extended licensable burnup limits for these fuels. The purpose of this paper is to document fuel performance computational simulations of the BNGS fuel using the Bison code. The detailed assessments include (1) the irradiation history of the fuel to provide prediction of as-run fuel conditions and (2) extending the irradiated fuel conditions into the as-designed experiment conditions for the HERA-HBu RIA experiments and for the LOC-HBu LOCA experiments. The results of these assessments will inform post-irradiation examinations (PIE) of the BNGS parent rods and detailed final design of the planned experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FUEL PERFORMANCE SIMULATION OF HIGH BURNUP FUELS IN PLANNED INTEGRAL DESIGN BASIS ACCIDENT EXPERIMENTS

High burnup (HBu) fuel rods from the Byron Nuclear Generating Station (BNGS) were recently received at Idaho National Laboratory (INL) to support a variety of planned Nuclear Energy fuel cycle R&D objectives ranging from fuel performance, fuel recycle, and spent fuel research topics. Among these R&D activities, these fuel rods will be the subjects of multiple in-pile experiment programs at the Transient Reactor Test (TREAT) facility as well as detailed characterization and testing in the hot cells at INL and Oak Ridge National Laboratory (ORNL). TREAT RIA experiments are planned for the Nuclear Energy Agency Framework for Irradiation Experiments (FIDES) Joint Experimental Program called High burnup Experiments in Reactivity Initiated Accident (HERA) program. TREAT and ORNL-furnace LOCA experiments are part of the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program U.S. consensus LOCA test plan, and the in-pile experiments have also been proposed in a FIDES project called Loss of Coolant-High Burnup (LOC-HBu). The results of these test programs will provide crucial data about safety performance enabling extended licensable burnup limits for these fuels. The purpose of this paper is to document fuel performance computational simulations of the BNGS fuel using the Bison code. The detailed assessments include (1) the irradiation history of the fuel to provide prediction of as-run fuel conditions and (2) extending the irradiated fuel conditions into the as-designed experiment conditions for the HERA-HBu RIA experiments and for the LOC-HBu LOCA experiments. The results of these assessments will inform post-irradiation examinations (PIE) of the BNGS parent rods and detailed final design of the planned experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Performance Simulation of High Burnup Fuels in Planned Integral Design Basis Accident Experiments

High burnup (HBu) fuel rods from the Byron Nuclear Generating Station (BNGS) were recently received at Idaho National Laboratory (INL) to support a variety of planned Nuclear Energy fuel cycle R&D objectives ranging from fuel performance, fuel recycle, and spent fuel research topics. Among these R&D activities, these fuel rods will be the subjects of multiple in-pile experiment programs at the Transient Reactor Test (TREAT) facility as well as detailed characterization and testing in the hot cells at INL and Oak Ridge National Laboratory (ORNL). TREAT RIA experiments are planned for the Nuclear Energy Agency Framework for Irradiation Experiments (FIDES) Joint Experimental Program called High burnup Experiments in Reactivity Initiated Accident (HERA) program. TREAT and ORNL-furnace LOCA experiments are part of the Department of Energy (DOE) Advanced Fuels Campaign (AFC) program U.S. consensus LOCA test plan, and the in-pile experiments have also been proposed in a FIDES project called Loss of Coolant-High Burnup (LOC-HBu). The results of these test programs will provide crucial data about safety performance enabling extended licensable burnup limits for these fuels. The purpose of this paper is to document fuel performance computational simulations of the BNGS fuel using the Bison code. The detailed assessments include (1) the irradiation history of the fuel to provide prediction of as-run fuel conditions and (2) extending the irradiated fuel conditions into the as-designed experiment conditions for the HERA-HBu RIA experiments and for the LOC-HBu LOCA experiments. The results of these assessments will inform post-irradiation examinations (PIE) of the BNGS parent rods and detailed final design of the planned experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Site Sustainability Plan integrating with the Environmental Management System [Slides]

The ISO 14001 Environmental Management System (EMS) ensures robust, certified EMS for LANL decision-makers and workers and provides consistent comprehensive, and documented management of all activities, products, and services with environmental interactions. A successful External Re-Certification Audit (2/13 – 2/17/2012) resulted in no findings of non-conformance. The EMS process is used to document and track progress towards Institutional environmental objectives and targets, including those in the Site Sustainability and 50 Year Environmental Stewardship Plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗