Search NASA⌕ Search

SEARCH · Search NASA

Results for “integrated systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Development of a Human Systems Integration Plan

NASA defines Human Systems Integration (HSI) as part of the overall systems engineering and acquisition strategy for space systems. The HSI Plan defines how HSI activities will be implemented across the lifecycle of the mission, as required by NPR 7123.1C, NASA Systems Engineering Processes and Requirements, and NPR 8705.2C Human-Rating Requirements for Space Systems. The goal of this presentation is to share with government and industry how an HSI Plan can be implemented. The presentation will cover HSI implementation for flight systems, vehicle processing, and interfaces. These are divided into six NASA HSI Domains: human factors engineering, operations resources, safety, training, maintainability and supportability, habitability and environment. HSI activities go across the mission’s lifecycle from pre-formulation and acquisition through design, development, operations, maintenance, and decommissioning. The HSI Plan includes a description of the HSI activities and products that are essential for human rating, operability, maintainability, supportability, and affordability of the mission systems. It also describes the role of the HSI Team required as part of the Human Rating process. The HSI Plan utilizes the operational expertise within NASA to ensure designs and testing are successful, leading to acceptable human spaceflight vehicles.

Jackelynne Silva-Martinez↗

Factors Influencing the Selection of the Systems Integration Organizational Model Type for Planning and Implementing Government High-Technology Programs

While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.

Thomas, Leann↗

Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)

This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.

Source record↗

The key to successful management of STS operations: An integrated production planning system

Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

Johnson, W. A.↗

Evolution of Requirements and Assumptions for Future Exploration Missions

NASA programs are maturing technologies, systems, and architectures to enabling future exploration missions. To increase fidelity as technologies mature, developers must make assumptions that represent the requirements of a future program. Multiple efforts have begun to define these requirements, including team internal assumptions, planning system integration for early demonstrations, and discussions between international partners planning future collaborations. For many detailed life support system requirements, existing NASA documents set limits of acceptable values, but a future vehicle may be constrained in other ways, and select a limited range of conditions. Other requirements are effectively set by interfaces or operations, and may be different for the same technology depending on whether the hard-ware is a demonstration system on the International Space Station, or a critical component of a future vehicle. This paper highlights key assumptions representing potential life support requirements and explanations of the driving scenarios, constraints, or other issues that drive them.

Anderson, Molly↗

Tailoring of NASA-STD-3001 to Lunar Gateway Program Requirements

The Gateway Program must meet NASA's Agency-level human rating requirements, which are intended to accommodate human capabilities and limitations while protecting the safety of the crew, and providing to the maximum extent practical, the capability to safely recover the crew from hazardous situations. Human systems integration represents a key human rating component of Moon to Mars systems to support the execution of Artemis missions, including compliance with mandatory standards for Health and Medical, Safety and Mission Assurance, and Engineering. The human system requirements, together with the human systems integration plan, medical operations requirements, and Gateway sub-system specifications, represent the flow-down of NASA Health and Medical Standards (NASA-STD-3001, Volumes 1 and 2) into the Gateway system. This paper discusses how these documents and other human systems integration activities provide full consideration of human capabilities and limitations as part of the total system design trade space, serving as an example on how the human must be effectively integrated as part of the system in order to achieve mission success. At a bigger scale, the paper con-tributes to the application of systems engineering standards to cutting-edge space exploration initiatives and to the dialogue on how systems engineering can continue to evolve to meet the needs of such ambitious projects.

Systems engineering↗

Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary

The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.

Klus, W. J.↗

Skylab experiment integration overview

The complex Skylab experiment integration task entailed extensive technical interfacing and liaison. The integrator provided continuity as the experiment evolved through the major program phases. The phases included experiment proposal, experiment development, module integration testing, operations support planning, integrated systems testing, and mission support and evaluation. Skylab experiment program responsibilities are discussed along with a compatibility analysis, questions of documentation, status reviews, and aspects of design philosphy.

Schrock, S. R.↗

Advanced altimetry

The radar altimeter being developed for the Ocean Topography Experiment (TOPEX) will have an inherent instrument precision of 2 to 3 cm. While some minor refinements may be possible in the future, major geophysical advances could be made if altimetric measurements over a wide swath of the Earth's surface were possible. The NASA Headquarters Oceanic Processes Branch is supporting a 3-year investigation of the technological issues inherent in the precision measurement of topography from spaceborne platforms at angles off-nadir. To explore the off-nadir measurement of topography, a flexible, airborne radar instrument system is being developed. Its hardware design is now complete, and it is made up of several subsystems. The antenna selected is a dielectric lens of .894 m diameter. The RF subsystem uses phase-locked oscillators, FET solid-state amplifiers, and times four frequency multipliers to develop a transmit signal at a frequency of 36.0 GHz and a local oscillator signal at a frequency of 35.4 GHz. Lecroy 6880 digitizers under computer control digitize the five receiver outputs. The digital subsystem consists of six single-board Heurikon processors. At this time, the instrument construction continues with final system integration planned for November 1988.

Parsons, C. L.↗

Ascent/Descent Software

The Ascent/Descent Software Suite has been used to support a variety of NASA Shuttle Program mission planning and analysis activities, such as range safety, on the Integrated Planning System (IPS) platform. The Ascent/Descent Software Suite, containing Ascent Flight Design (ASC)/Descent Flight Design (DESC) Configuration items (Cis), lifecycle documents, and data files used for shuttle ascent and entry modeling analysis and mission design, resides on IPS/Linux workstations. A list of tools in Navigation (NAV)/Prop Software Suite represents tool versions established during or after the IPS Equipment Rehost-3 project.

Brown, Charles↗

Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

Maris, John↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗