Search NASA⌕ Search

SEARCH · Search NASA

Results for “intelligent campus”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Energy Management Information System Powers NREL's Intelligent Campus

NREL's Intelligent Campus program leverages its own laboratory buildings as research instruments to study renewable energy, energy efficiency, and energy storage, integration, and analysis with real, quantitative measurements. At the heart of NREL's Intelligent Campus program is its Energy Management Information System (EMIS), a family of tools and services used to manage building and campus energy use. NREL's EMIS includes capabilities, such as benchmarking and monthly utility tracking, interval meter analytics, equipment fault detection and diagnostics, condition-based monitoring, and supervisory control, enabling unprecedented energy management capabilities. The system serves as a demonstration project for other federal facilities interested in learning about its design, features, and benefits.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Energy Management Information System Powers NREL's Intelligent Campus

NREL's Intelligent Campus program leverages its own laboratory buildings as research instruments to study renewable energy, energy efficiency, and energy storage, integration, and analysis with real, quantitative measurements. At the heart of NREL's Intelligent Campus program is its Energy Management Information System (EMIS), a family of tools and services used to manage building and campus energy use. NREL's EMIS includes capabilities, such as benchmarking and monthly utility tracking, interval meter analytics, equipment fault detection and diagnostics, condition-based monitoring, and supervisory control, enabling unprecedented energy management capabilities. The system serves as a demonstration project for other federal facilities interested in learning about its design, features, and benefits.

EMIS↗

Machine Learning for Automated Metadata Assignment in Buildings: Cooperative Research and Development (Final Report, CRADA Number CRD-18-00767)

RealTerm Energy and NREL have identified a shared vision to evaluate opportunities to facilitate the organization and assignment of metadata to building control system (BCS) data via industry-informed machine learning (ML). Manual metadata assignment is labor intensive and costly, slowing down any Energy Management and Information System (EMIS) deployment in the building space. This project aims to develop methodologies to accurately assign this metadata and significantly decrease the level of effort associated with deploying EMIS. The objective of this project is to identify/design methodologies to assign metadata to HVAC control points automatically. The identified methodologies will be programmed in analytics algorithms so they can ingest a list of points and produce a detailed tagging following the Haystack classification nomenclature. To validate the efficacy of each methodology, tagging results will be compared utilizing a list of points extracted from RealTerm's building database-as well as data extracted from the NREL campus via the Intelligent Campus program-enabling testing against large datasets with real world challenges. The developed methodologies may leverage building manager/operator input on a limited basis to add context to the classifying algorithms. The partnership aims to advance global efforts in areas related to the DOE missions through improving operational performance of commercial buildings. It is well documented that buildings fall out of commission after they are occupied, wasting significant energy and incurring associated costs simply due to poor operational performance. Emerging EMIS technologies that perform continuous commissioning help to address this issue, yet integration of these systems can be labor intensive both for the technology vendor and the building owner/operator. This project will enable more efficient and cost-effective analytics for buildings, enabling improvement in building operations at lower cost points.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deep-Learning-Based Multi-Timescale Load Forecasting in Buildings: Opportunities and Challenges from Research to Deployment

Electricity load forecasting for buildings and campuses is becoming increasingly important as the penetration of distributed energy resources (DERs) grows. Efficient operation and dispatch of DERs require reasonably accurate predictions of future energy consumption in order to conduct near-real-time optimized dispatch of on-site generation and storage assets. Electric utilities have traditionally performed load forecasting for load pockets spanning large geographic areas, and therefore, forecasting has not been a common practice by buildings and campus operators. Given the growing trends of research and prototyping in the grid-interactive efficient buildings domain, characteristics beyond simple algorithm forecast accuracy are important in determining the algorithm's true utility for smart buildings. Other characteristics include the overall design of the deployed architecture and the operational efficiency of the forecasting system. In this work, we present a deep-learning-based load forecasting system that predicts the building load at 1-hour intervals for 18 hours in the future. We also discuss challenges associated with the real-time deployment of such systems as well as the research opportunities presented by a fully functional forecasting system that has been developed within the National Renewable Energy Laboratory's Intelligent Campus program.

building load forecasting↗

Wattile: Probabilistic Deep Learning-based Forecasting of Building Energy Consumption [SWR-20-94]

Accurate energy forecasting is becoming critical due to many reasons: i ) optimal distributed energy resources operations and dispatch, ii) fault detection and diagnostics, and iii) meeting operational energy efficiency targets. Wattile uses deep learning (DL) for the building's short-term load forecasting application. Two specific types of neural networks called, Long Short Term Memory (LSTM) and Sequence-to-Sequence (S2S) models are used to make predictions. Forecasting models are trained using online historical weather and occupancy indicator data streams from the Intelligent Campus Program's data acquisition systems at the National Renewable Energy Laboratory (NREL) for main meters and sub-meters of multiple building types. These models use probabilistic methods to provide quantile-based forecasts in addition to nominal conditional median predictions of electricity consumption.

Frank, Stephen↗

The relationship between stress, anxiety and eating behavior among Chinese students: a cross-sectional study

Background The expansion of higher education and the growing number of college students have led to increased awareness of mental health issues such as stress, anxiety, and eating disorders. In China, the educational system and cultural expectations contribute to the stress experienced by college students. This study aims to clarify the role of anxiety as a mediator in the relationship between stress and eating behaviors among Chinese college students. Methods This study utilized data from the 2021 Psychology and Behavior Investigation of Chinese Residents, which included 1,672 college students under the age of 25. The analysis methods comprised descriptive statistics, t -tests, Pearson correlation analyses, and mediation effect analysis. Results The findings indicate that Chinese college students experience high levels of stress, with long-term stress slightly exceeding short-term stress. Both types of stress were positively correlated with increased anxiety and the adoption of unhealthy eating behaviors. Anxiety was identified as a significant mediator, accounting for 28.3% of the relationship between long-term stress and eating behavior (95% CI = 0.058–0.183). The mediation effect of short-term stress on eating behavior through anxiety was also significant, explaining 61.4% of the total effect (95% CI = 0.185–0.327). Conclusion The study underscores the importance of stress management and mental health services for college students. It recommends a comprehensive approach to reducing external pressures, managing anxiety, and promoting healthy eating behaviors among college students. Suggestions include expanding employment opportunities, providing career guidance, enhancing campus and societal support for holistic development, strengthening mental health services, leveraging artificial intelligence technologies, educating on healthy lifestyles, and implementing targeted health promotion programs.

Chai, Yulin↗

A Data-Driven Approach to Nation-Scale Building Energy Modeling

In 2019, 125 million U.S. residential and commercial buildings consumed $412 billion in energy bills. These buildings currently consume 40% of the nation's primary energy, 73% of electricity, 80% of energy during peak electric grid use, and responsible for 39% of greenhouse gas emissions [14]. Urban-scale building energy modeling has grown significantly in the past decade, allowing individual campuses or communities of buildings to be modeled, simulated, and cost-effective solutions for intelligent management to be identified and implemented. While traditionally limited to individual counties and usually less than 2,000 buildings, the Automatic Building Energy Modeling (AutoBEM) soft-ware suite has been developed to process unconventional, nation-scale data sources to generate unique OpenStudio and EnergyPlus models of each building. Through the use of High Performance Computing (HPC) resources, every U.S. building has been simulated. This paper showcases the data layout, node partitioning, algorithmic approaches, and analytic results that were used to create, share, and analyze 124.4 million U.S. building models.

Berres, Andy↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Wind

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production by conducting a statistical analysis of historical wind data over a five-year period (2020-2025) from a single 1.5MW turbine manufactured by General Electric (GE) located at NLR’s Flatirons Campus, to generate an experimental test profile that was deployed on a 1.25-MW proton exchange membrane type MC250 electrolyzer system manufactured by Nel Hydrogen . [1] While the electrolyzer balance-of-plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. The historical wind data provided several metrics, however, the analysis particularly focused on the measured power output by the wind turbine. The power output time series of data for each day was categorized by total energy generation and standard deviation, and the day that represented the highest combination of these two metrics was chosen – December 25th, 2022. This process was then repeated for a moving four-hour window within this day to identify the most statistically variable period. Finally, this four-hour period was scaled by 65% to match the 1.25 MW electrolyzer. The electrolysis system controls hydrogen production by varying DC current applied to the stack, from a maximum of 3000 A to a minimum safe operation of 300 A, or 10%. Because the current – voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical wind profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1 Hz frequency. For more details on the statistical analysis process, see the presentation labeled “ Public Reference Data for Megawatt-Scale Hydrogen Electrolysis” provided with each data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wind turbine electrolysis experiment and is formatted as follows: {technology}_{scaling factor}-{electrolyzer ramp rate in amperes/second} For instance, “wind-GE1.5MW_0.65-400.zip” represents the hour-long experiment using historical data from the wind-GE1.5MW turbine, scaled to 65%, with the electrolyzer power supply set to a maximum ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and wind power input. A PDF file detailing the historical wind data statistical analysis used to generate the wind profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all simulated wind experiments combined into one dataset labeled "combined_historical_wind_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis [1] nelhydrogen.com/product/mc-series-electrolyser .

08 HYDROGEN↗

Editorial: Visualizing offline and live data with AI (VOLDA) workshop first edition Princeton 11-13th June 2024

The first edition of the Visualizing Offline and Live Data with AI’ (VOLDA) Workshop took place at the Princeton University Campus, Mader Hall from 11 to 13 June 2024. This annual workshop held for the first time aims at bringing together the fusion community to discuss the challenges brought by Artificial Intelligence (AI) and visualizing large datasets in fusion experiment and simulation.

artificial intelligence↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Solar PV

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) research platform. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence data centers and other variable loads. This dataset entry describes the behavior of a 1.25-MW proton exchange membrane MC250 electrolyzer system, manufactured by Nel Hydrogen , [1] when fed historical data generated by the 430-kW, fixed-axis solar photovoltaic (PV) array located at NLR’s Flatirons Campus. (While the electrolyzer balance of plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack.) Solar PV power output data for the 2020 calendar year were categorized on a daily basis by total energy generation and standard deviation. Each day was then ranked by these metrics, and the 25th, 50th, and 100th percentiles were selected. The 75th percentile day did not exhibit sufficient variability to make for a valuable experiment. A similar process was used for the related historical wind dataset . [2] The historical days in 2020 that represented these percentiles are Dec. 19, March 29, and May 4, respectively. The entire solar day’s power profile was then fed through the MC250 electrolyzer. Due to its length, the 100th percentile day experiment was split into two parts, and the final 3 hours of the solar day were not captured. These final 3 hours contained no spikes or dips of interest and simply represented a slow decay of input solar power. Also, a single timestamp (13:13:47 on Jan. 14, 2026) was lost in the hydrogen system supervisory control and data acquisition. Finally, during the 25th percentile experiment (solar day Dec. 19, 2020) data recording was lost from 11:00:13 to 11:14:45. The roughly 15 minutes of the solar profile were rerun at the end of the experiment and spliced into this time slot during post-processing. The electrolysis system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operation of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical solar profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. For more details on the statistical analysis process, see the slide deck “Public Reference Data for Megawatt-Scale Hydrogen Electrolysis: NLR Historical Solar PV Analysis and Profile Generation” accessible with this data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single solar PV electrolysis experiment and is formatted as: {technology}_{percentile}_{scaling factor} For instance, “solarPV-430kW_25_2x.zip” reports the experiment using the 25th percentile solar data from the historical 2020 solar PV dataset, scaled to 200%. Scaling factors were applied to the generated solar PV power output files to more closely match the 1.25-MW capacity of the electrolyzer. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and solar power input. A PDF file detailing the historical solar data statistical analysis used to generate the solar profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all experiments combined into one dataset labeled "combined_solarPV_experiments.csv". [1] nelhydrogen.com/product/mc-series-electrolyser . [2] data.nlr.gov/submissions/316 .

08 HYDROGEN↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis – Simulated Wind

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production using a single, simulated wind turbine. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel Hydrogen . While the unit supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. For the simulated wind energy profiles, NLR used OpenFAST to simulate a 3.4-MW International Energy Agency (IEA) reference wind turbine. The hour-long wind energy profiles varied over wind turbulence intensity (Class A or Class C) and average wind speed (5, 7, or 9 m/s). To match the power limits of the 1.25-MW electrolyzer and 3.4-MW IEA wind turbine most effectively and to maximize the efficiency of hydrogen production at a given average wind speed, the profiles were sometimes scaled by two times. This means that, in some cases, the experimental setup assumed two 1.25-MW electrolyzers were coupled with the wind turbine, representing a total maximum electrolysis load of 2.5 MW. Finally, NLR experimented with two settings for the electrolyzer power supply minimum and maximum current ramp rates (gain and slew): 200 and 400 amperes per second. The simulated profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wind turbine electrolysis experiment and is formatted as follows: {technology}-{average wind speed}-{turbulence class}_{number of 1.25 MW electrolyzers connected}-{electrolyzer ramp rate in amperes/second} For instance, “windIEA3.4-5ms-C_2-400.zip” represents the hour-long experiment using the IEA 3.4-MW turbine, subjected to an average wind speed of 5 m/s and Class C wind turbulence, and connected to two 1.25-MW electrolyzers with the power supply set to a maximum current ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wind turbine power. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30 minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all simulated wind experiments combined into one dataset labeled "combined_wind_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis .

08 HYDROGEN↗

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - Simulated Wave

The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) initiative. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence (AI) data centers and other variable loads. This dataset entry describes hydrogen production using a single, simulated wave energy conversion device. The electrolyzer is a 1.25-MW proton exchange membrane type MC250 system manufactured by Nel Hydrogen. While the unit supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack. For the wave energy, NLR used a wave energy converter model from PacWave. These devices can be equipped with accumulators and pressure relief values to smooth the power output by storing and releasing hydraulic energy. Using a peak power output of 10 MW, the model created two 25-minute profiles: one with and one without the accumulators and pressure relief valves. To down select the profile data from the native resolution of 20 Hz to 1 Hz, NLR took the mean of every 20 data points. NLR experimented with two simulated wave energy power plants: one that peaks at 10 MW, and one that peaks at 5 MW. These profiles were scaled for the physical 1.25 MW electrolyzer by multiplying the original profiles by one eighth and one quarter, respectively. The first profile matches the capacity rating of eight of the 1.25 MW electrolyzers, while the second matches four electrolyzers. Finally, NLR experimented with two settings for the electrolyzer power supply minimum and maximum current ramp rates (gain and slew): 200 and 400 amperes per second. The simulated profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single wave electrolysis experiment and is formatted as follows: {technology}-{accumulator?}_{number of 1.25 MW electrolyzers connected}-{electrolyzer ramp rate in amperes/second} For instance, “wavePacWave-Noacc_4-400.zip” represents the 25 minute-long experiment using the PacWave’s wave energy converter model, equipped with no accumulator, connected to four 1.25-MW electrolyzers with their power supplies set to a maximum current ramp rate (gain and slew) of 400 A/s. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production in kilograms per hour, electrolysis power consumption, and input wave power. An experiment, labeled “characterization_200.zip”, demonstrates the MC250 electrolyzer steady-state response with 30 minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all wave profiles combined into one dataset labeled "combined_wave_experiments.csv". NLR also built an AI/machine-learning predictive model based on these datasets. The model ingests the electrolyzer current command in amperes, as well as various pressures and temperatures across the system, and predicts hydrogen output in kilograms per hour. The complete model can be found at https://huggingface.co/NatLabRockies/ptmelt-hydrogen-electrolysis.

08 HYDROGEN↗

The International Conference on Surface Plasmon Photonics 10

The International Conference on Surface Plasmon Photonics (SPP Conference) is widely regarded as the premier global conference in nanoscale photonics. The SPP10 meeting was held in the United States for the first time, at Rice University in Houston, Texas, on May 21-26, 2023. This conference was an outstanding venue for communicating research breakthroughs and accomplishments in the represented fields, as well as for visibility, networking, and recruiting, for students, postdoctoral fellows, and faculty throughout the US and the world as they attended this conference. The SPP10 conference hosted sessions on fundamental science, innovations, and applications in modern photonics with high potential for commercialization. Plenary sessions, invited talks from leading scientists in the field, and contributed talks from the larger photonics community on highly multidisciplinary topics of Quantum Plasmonics and Photonics; Energy Harvesting and Plasmonic Chemistry; Active Photonics and Devices; Ultrafast and Nonlinear Phenomena; and Machine Learning/Artificial Intelligence. The meeting schedule includes 3 plenary speakers, 31 Invited talks and 58 contributed talks. There were three well attended poster sessions which included lively discussions. Lunch time in the University Colleges allowed unstructured time for additional networking and discussions. The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. The co-chairs of the conference were Prof. Naomi Halas and Prof. Peter Nordlander. The grant from DoE supported student’s and early career scientist’s registration and housing on campus.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Schema Elements for Granta Annual Report

Granta: Materials Intelligence, also known as Granta:MI or Granta, is a commercial database software by Ansys, Inc. that is utilized by the Nuclear Security Enterprise (NSE) to organize and store materials data relevant to the complex. The software was first adopted by individual sites in the early 2000’s, but in FY20, enterprise-wide licensing was purchased for the NSE by the Product Realization Integrated Digital Enterprise (PRIDE) program. Currently, there are 375 floating licenses available for users at all sites. There are also two shared instances of Granta; a classified production instance on the Enterprise Secure Network (ESN) and an unclassified development instance. Additionally, some individual sites such as Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories (SNL), Kansas City National Security Campus (KCNSC), and Savannah River National Laboratory (SRNL) host their own local Granta instances on their own networks that, in general, only their employees can access.

36 MATERIALS SCIENCE↗

Data-Driven Approach to Transactive Energy Systems with Commercial Buildings

A microgrid with solar, storage, and responsive load resources has been implemented and tested on an urban academic campus. Through modeling and simulation, a consensus transactive energy mechanism has been implemented, with each resource participating as a virtual battery. Most owners of large buildings don't have the information and expertise to develop and validate suitable models of their buildings using available tools. To mitigate this adoption barrier, a data-driven building model has been implemented and validated. It uses 5-minute weather data, 3-second revenue meter data, energy audit information, and a load reduction test conducted by the building owner.

Buildings, data-driven modeling, deep learning, en↗

Brick Schema Standardized Plug Load Control Strategies for Load Reduction: Preprint

Plug loads comprise a significant percentage of commercial building energy consumption. Applying intelligent controls to turn off plug loads when unused can provide dynamic load reduction and flexibility, which are key traits of grid-interactive efficient buildings. This capability is important for equitable decarbonization as it can enable disadvantaged communities to electrify buildings without costly upgrades to electrical infrastructure. In this work, we present the effectiveness of various control strategies along with the operational lessons that informed their design. During a three-year period, we operated over 600 smart outlets in 12 university office buildings. The attached plug loads consisted primarily of printers, TVs, water dispensers, and copiers. After recording baseline power measurements for one year, we designed plug load control (PLC) strategies for each plug load type, use, and for different risk tolerance levels because PLC can potentially be disruptive to daily work. We used the Brick Schema to facilitate the management of plug load locations and other metadata. For advanced controls, we integrated the smart plugs with heating, ventilation, and air conditioning (HVAC) systems through the campus building automation system. We found static schedules to be the least disruptive and most predictable for occupants, resulting in 38% and 66% energy savings in two studies. For printers, print server-triggered PLC produced 86% savings, the highest of all strategies with minimal occupant impact. Scheduling of water dispensers and digital signage TVs produced 49% and 70% savings respectively with opportunities to improve performance with the use of HVAC occupancy data.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Mondo: integrating disease terminology across communities

Precision medicine aims to enhance diagnosis, treatment, and prognosis by integrating multimodal data at the point of care. However, challenges arise due to the vast number of diseases, differing methods of classification, and conflicting terminological coding systems and practices used to represent molecular definitions of disease. This lack of interoperability artificially constrains the potential for diagnosis, clinical decision support, care outcome analysis, as well as data linkage across research domains to support the development or repurposing of therapeutics. There is a clear and pressing need for a unified system for managing disease entities⁠—including identifiers, synonyms, and definitions. To address these issues, we created the Mondo disease ontology—a community-driven, open-source, unified disease classification system that harmonizes diverse terminologies into a consistent, computable framework. Mondo integrates key medical and biomedical terminologies, including Online Mendelian Inheritance in Man (OMIM), Orphanet, Medical Subject Headings (MeSH), National Cancer Institute Thesaurus (NCIt), and more, to provide a comprehensive and accurate representation of disease concepts with fully provenanced and attributed links back to the sources. Mondo can be used as the handle for curation of gene–disease associations utilized in diagnostic applications, research applications such as computational phenotyping, and in clinical coding systems in clinical decision support by pointing the clinician to the numerous knowledge resources linked to the Mondo identifier. Mondo's community-centric approach, stewarded by the Monarch Initiative's expertise in ontologies, ensures that the ontology remains adaptable to the evolving needs of biomedical research and clinical communities, as well as the knowledge providers.

biomedical informatics↗