Results for “interconnection agreement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Working With Your Utility Series: Interconnection Basics

This training provided information on interconnection basics for federal agencies developing distributed energy projects. Considerations covered included: Understanding interconnection processes and timelines, interconnection siting considerations, technology-specific interconnection issues, and interconnect agreements. This webinar is the first in a multi-part series on working with electric utilities to develop distributed energy projects on federal sites.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SEIN: Breaking Barriers Resilient Energy System Analysis [Slides]

The Solar Energy Innovation Network (SEIN) is a collaborative research program that supports multi-stakeholder teams in researching and sharing solutions to real-world challenges associated with solar energy adoption. The Breaking Barriers project was selected to participate in the Solar Energy Innovation Network, Round 2, and was led by Groundswell, a D.C.-based clean energy project developer. The Breaking Barriers team included Partnership for Southern Equity, Atlanta University Center campus facility managers and professors, the City of Atlanta's Neighborhood Planning Unit T, and Georgia Power Company. The project aimed to design and construct innovative urban energy resiliency hubs integrating microgrid technology, solar generation, and energy storage in Atlanta colleges and communities. The hubs will help these historically Black colleges and universities (HBCUs) and the energy-burdened broader community in West Atlanta be more resilient, in addition to informing new course curricula at Atlanta University Center campuses. With many possible options for the system's battery size, the Breaking Barriers team needed insight into the relationships between BESS size, economic performance, and resilience at Spelman College's Manley Center. These insights are crucial for entering procurement negotiations with project developers, establishing resilience capabilities that the HBCU campuses can plan around, and guiding the team's fundraising targets. This analysis includes estimates of PV and battery performance, costs, savings, and resilience for multiple battery sizes. In order to provide power during a grid outage, the resilient energy system also needs to be connected to the Manley Center in a safe and island-able manner (electrically isolated from the grid). Analysis of potential electrical configurations and estimated setup costs is key to successfully entering a required interconnection agreement with Georgia Power, as well as informing requests for engineering firms to construct the system. This analysis includes conceptual options and rough order of magnitude cost estimates for electrically interconnecting the resilient energy system to the Manley Center and the grid. The Breaking Barriers team used this analysis to select preferred system characteristics and design for the resilient energy system.

14 SOLAR ENERGY↗

Resilient Communication Scheme for Distributed Decision of Interconnecting Networks of Microgrids

Networking of microgrids can provide the operational flexibility needed for the increasing number of DERs deployed at the distribution level and supporting end-use demand when there is loss of the bulk power system. But, networked microgrids are vulnerable to cyber-physical attacks and faults due to the complex interconnections. As such, it is necessary To design resilient control systems to support the operations of networked microgrids in responses to cyber-physical attacks and faults. This paper introduces a resilient communication scheme for interconnecting multiple microgrids to support critical demand, in which the interconnection decision can be made distributedly by each microgrid controller even in the presence of cyberattacks to some communication links or microgrid controllers. This scheme blends a randomized peer-to-peer communication network for exchanging information among controllers and resilient consensus algorithms for achieving reliable interconnection agreement. The network of 6 microgrids divided from a modified 123-node test distribution feeder is used to demonstrate the effectiveness of the proposed resilient communication scheme.

Vu, Thanh Long↗

Advanced-Research-on-Integrated-Energy-Systems-Based Analysis to Support Resilient System Upgrades: Energy to Communities Energyshed In-Depth Partnership with Molokai, Hawaii

The Molokai, Hawaii, Energy to Communities (E2C) Energyshed project represents a collaborative effort between the National Laboratory of the Rockies, Shake Energy Collaborative, the Molokai Clean Energy Hui, Sustainable Molokai, and Ho'ahu Energy Cooperative Molokai to advance Molokai's Community Energy Resilience Action Plan (CERAP). Supported by Hawaiian Electric Company and the Hawaii State Energy Office, the initiative aims to develop a community-defined portfolio of renewable energy solutions that enhance energy resilience while aligning with the Hawaiian Electric Integrated Grid Plan (IGP) and Molokai's energy goals. Phase 1 focused on technical analyses and community engagement to co-design feasible energy scenarios. Challenges such as grid upgrades, storage sizing, and inverter ride-through standards were addressed to align technical and operational requirements with community preferences. The project equips Molokai with actionable data and insights to implement energy initiatives while ensuring resilient and culturally informed solutions. Future efforts aim to finalize project designs, secure interconnection agreements, and deploy energy projects that reflect community priorities and technical feasibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Centers and Digital Assurance Workshop 3 – Mitigations for Digital Assurance Risks

The third session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 18, 2025, focused on developing mitigation strategies for digital assurance risks identified in previous workshops. Hosted by Idaho National Laboratory (INL) and ScottMadden, the session emphasized the application of Cyber-Informed Engineering (CIE) to data center infrastructure, particularly at the utility–data center interface. Participants revisited and ranked key digital assurance risks, including architecture and interface weaknesses, governance gaps, and AI-enabled threats. The workshop introduced the 12 principles of CIE, advocating for consequence-focused design, engineered controls, and secure information architecture to proactively reduce cyber-physical vulnerabilities. These principles were applied to critical data center systems such as power distribution, UPS, cooling, SCADA/BMS, and grid-forming batteries. The session also addressed governance challenges at the interconnection boundary, highlighting the need for clear roles in telemetry sharing, firmware management, and trip settings. Special attention was given to emerging risks from behind-the-meter (BTM) generation, including reverse-power flow and the integration of small modular reactors (SMRs), which shift data centers from large loads to complex generation nodes. Participants explored how interconnection agreements can serve as enforceable instruments for digital assurance, and reviewed gaps in current standards such as NERC CIP, IEC 62443, and IEEE 1547. The workshop concluded with pathways to standardization, including model agreement language, state-level programs, and expanded NERC guidance. INL also presented tools and frameworks for secure procurement and supplier risk management, reinforcing the need for integrated engineering and policy solutions to secure the evolving data center–grid ecosystem. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

Large Load Integration - Task List and Overview

Large Load Integration Tasks: Task 1 – Workshops Support stakeholder engagement across industry to promote collaboration and identify solutions to challenges that will guide other work Task 2 – Ancillary Services Characterize different types of large loads to assess under what conditions they may be utilized to provide grid stability services Task 3 – Communications Explore the cybersecurity and communications infrastructure required to enable large loads to interface with grid operations to provide ancillary services Task 4 – Nuclear Integration Explore risks and methods for supporting large load energy needs with SMRs and incorporating them into the wider power system Task 5 – Decision Support and TA Provide support to stakeholders through the creation of planning tools and direct technical assistance.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2022 Edition [Slides]

Falling battery prices and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data mined from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and full hybrids that feature co-location and co-control. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2021, there were nearly 300 hybrid plants (>1 MW) operating across the United States, totaling nearly 36 gigawatts (GW) of generating capacity and 3.2 GW/8.1 GWh of energy storage. PV+storage plants are by far the most common, dominating in terms of plant number (140), storage capacity (2.2 GW/7.0 GWh), storage:generator ratio (53%), and storage duration (3.2 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was a breakout year for PV+storage hybrids in particular: 67 of the 74 hybrids added in 2021 were PV+storage. By the end of 2021, there were more GW of battery capacity installed in PV+storage hybrids (2.2 GW) than as standalone storage plants (1.8 GW). The difference is even starker in energy terms, with PV+storage plants hosting twice as much battery capacity as standalone storage plants (7 GWh vs. 3.5 GWh, respectively). Much of the battery capacity added in hybrid form in 2021 was a battery retrofit to a pre-existing PV plant. -Data on plants under development from the interconnection queues of all seven ISOs/RTOs plus 35 individual utilities suggest that these hybridization trends are likely to continue. At the close of 2021, there were more than 670 GW of solar plants in the nation’s queues; 285 GW (~42%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage (PV+storage represented nearly 90% of all hybrid capacity in the queues). For wind, 247 GW of capacity sat in the queues, with 19 GW (~8%) proposed as a hybrid, again most-often pairing wind with storage (wind+storage represented ~4% of all hybrid capacity in the queues). Meanwhile, nearly half of all storage in the queues is estimated to be part of a hybrid plant. While many of these proposed plants will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2024 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis.

14 SOLAR ENERGY↗

Utility-Scale Solar, 2021 Edition

Berkeley Labs "Utility-Scale Solar", 2021 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2020, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2021↗

Utility-Scale Solar, 2023 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2023 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2022, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

analysis↗

Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

2022↗

Data Center Cybersecurity, Supply Chain Risk Management, and Emerging Regulation Cohort Summary: Takeaways and Action Plans

This report summarizes the outcomes of the Data Center Cohort under the Department of Energy’s Technical Assistance for Digital Assurance (TADA) initiative, aimed at enhancing grid resilience through cybersecurity, supply chain risk management (SCRM), and Cyber-Informed Engineering (CIE). The cohort engaged 17 organizations across utilities, data center operators, vendors, and technology providers in three sessions combining presentations, discussions, and exercises. Key topics included AI-driven load behavior, cybersecurity vulnerabilities in UPS/BESS and cooling systems, governance gaps at utility–data center boundaries, and supply chain integrity. Five cross-cutting themes emerged: interconnection architecture vulnerabilities, fragmented governance, AI-driven stability risks, lack of regulatory frameworks, and long-term supply chain concerns. Actionable recommendations were developed, including implementing DMZ segmentation, formalizing vendor access agreements, designing AI workload limits, and advancing standards through NERC and state-level programs. These strategies aim to strengthen resilience, clarify responsibilities, and ensure secure integration of data centers into the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗