Search NASA⌕ Search

SEARCH · Search NASA

Results for “interconnection equipment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

Performance Test Protocol for Evaluating Inverters Used in Grid-Connected Photovoltaic Systems

Interconnection equipment that connects distributed resources (DR) to an electrical power system (EPS) are expected to do so efficiently. Standardized test procedures are necessary to establish methods for verifying inverter performance that leads to comparable results. These test procedures are provided as a repeatable, independent means of measuring inverter performance regarding maximum continuous power rating, conversion efficiency, and tare loss characteristics.

14 SOLAR ENERGY↗

SSR1 Cryomodule Design PXIE

Fermilab is planning to design and build a Project X Injector Experiment (PXIE), a cw linac, as a means of validating the Project X concept, reducing technical risks, and obtaining experience in the design and operation of a superconducting pr oton linac. The overall facility will include an ion source, low and medium-energy beam transport sections, a radio frequency quadrupole, and two cryomodules containing superconducting cavities. One will contain nine half-wave resonators operating at 162. 5 MHz and six superconducting solenoids. The second will contain eight single spoke resonators (SSR1) operating at 325 MHz and four superconducting solenoids. This paper describes the design of the cryomodule being developed to house the 325 MHz single sp oke resonators. Each of the main cryomodule systems will be described; cryogenic systems and instrumentation, cavity and solenoid positioning and alignment, conduction-cooled current leads, RF input couplers, magnetic shielding, cold-to-warm beam tube tra nsitions, interfaces to interconnecting equipment and adjacent modules, as well as the overall assembly procedure.

43 PARTICLE ACCELERATORS↗

Microgrid Testing

With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Draft Electric Rule 21 Test Protocols for Advanced Inverter Functions

Disclaimer: The following document includes draft certification protocols and should not be viewed as a consensus-based performance standard. Distributed energy resources (DERs), such as photovoltaic (PV) systems, when deployed in a large scale, are capable of significantly influencing the operation of bulk and local power systems. Looking to the future, European and American stakeholders are working on standards to make it possible to manage the potentially complex interactions between DER and the power system. One of the jurisdictions considering modifications to the DER interconnection requirements is California. To determine what changes could improve electric grid reliability and allow greater penetrations of renewable energy, the California Public Utilities Commission (CPUC) and the California Energy Commission (CEC), in conjunction with consultant Frances Cleveland, convened the Smart Inverter Working Group (SIWG) in January 2013. The SIWG--composed of state agencies, utility engineers, national laboratories, manufacturers, trade associations, and advocacy groups--provided the CPUC a set of recommendations in early 2014 1 . The recommendations included specific advanced DER functions and interoperability requirements, along with a proposed timeline, for California to add new capabilities to grid-interconnected DER. On August 18, 2014 the three California Investor-Owned Utilities (IOUs)--Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE) and San Diego Gas & Electric Company (SDG&E)--drafted a Advice Letter filing to the CPUC setting forth revisions to Electric Tariff Rule 21 to conform to the seven recommendations made by the Working Group 2 . After a comment period, the CPUC issued an update to the IOU recommendations 3 . At the time of this publication, there was no final legal ruling on the CPUC Rulemaking (R.) 11-09-011 ("Order Instituting Rulemaking on the Commission's Own Motion to improve distribution level interconnection rules and regulations for certain classes of electric generators and electric storage resources"). In the U.S., Nationally Recognized Test Laboratories (NRTLs) independently verify products to safety and functional standards. PV inverters are certified to Underwriters Laboratories (UL) Standard 1741 4 . However, new advanced inverter functions described in the SIWG and IOU proposals are not included in this standard, so there is a critical need to develop test protocols for these functions in preparation of a positive ruling by the CPUC. Through a California Solar Initiative Grant, Sandia National Laboratories (Sandia or SNL), Underwriters Laboratories (UL), Electric Power Research Institute, Inc. (EPRI), Xanthus Consulting, SunSpec Alliance, Loggerware, and utility and PV inverter manufacturers have collaborated to draft this certification protocol for the Rule 21 SIWG Phase 1 advanced inverter functions. This report also includes test procedures for Phase 2 and Phase 3 functions that will be demonstrated later in the CSI4 project. This collaborative effort was performed in close junction with the UL 1741 Standards Technical Panel (STP) working group. This document represents a snapshot of the draft testing protocols at the time of publication and not a consensus certification protocol for advanced inverters. 1 California Public Utilities Commission, "Recommendations for Updating the Technical Requirements for Inverters in Distributed Energy Resources, Smart Inverter Working Group Recommendations," Filed 7 Feb 2014. 2 J.J. Newlander, R.G. Litteneker, S.W. Walter, M. Dwyer, Joint motion of Pacific Gas and Electric Company (U 39 E), Southern California Edison Company (U 338 E) and San Diego Gas & Electric Company (U 902 E) regarding implementation of smart inverter functionalities, Rulemaking 11-09-011 Advice Letter, 18 July, 2014. 3 J.T. Sullivan, CPUC Rulemaking 11-09-011 Agenda ID #13460, 13 Nov, 2014. 4 Underwriters Laboratories Std. 1741 Ed. 2, "Inverters, Converters, Controllers and Interconnection System Equipment for use with Distributed Energy Resources," 2010.

42 ENGINEERING↗

Key Performance Indicators for Vehicle Grid Integration

Electric vehicle (EV) sales account for a rapidly growing portion of the light-duty vehicle market and a portion of medium and heavy-duty fleet vehicles. However, in many locations, charging stations will require costly utility grid upgrades with long lead times. Today, there are a few methods of smart charge management (SCM) which can reduce the costs and wait times for electric vehicle supply equipment (EVSE) interconnection approvals, as well as reduce impacts of the charging stations on the grid and on EV driver transportation costs. It is crucial for the EV charging industry to understand the vehicle grid integration (VGI) requirements for EVSE to prevent adverse impacts from EVSE interconnections and assure that charging loads and interconnections are affordable.

33 - ADVANCED PROPULSION SYSTEMS↗

A research feasibility study proposal for conducting experimental research in curriculum sharing via Communications Technology Satellite among institutions having large minority enrollments

The applicability of the tele-conference method of curriculum sharing as well as the sharing of scientific research results between universities and industrial organizations was evaluated in relation to other techniques and methods. Ten universities cooperated with NC A&T State University in an effort to increase the number of minority scientists and engineers in the USA via the utilization of the communication features of satellites. Research activities, experiments and studies in curriculum sharing are described as well as the techniques, interconnections and equipment utilized. Suggested methods and recommendations for a continuation of innovative applications of satellite technology in higher education at NC A&T State University are included.

Williams, L., Jr.↗

Satellite freeze forecast system. System configuration definition manual

Equipment listings, interconnection information, and a basic overview is given of the hardware interaction of the Ruskin HP-100 computer system. A block diagram is included of the SFFS system at the National Weather Service Office in Ruskin, Florida. The generation answer file used to create the RTE-IVB operating system currently resident in Ruskin HP-1000 computer system is also described.

Martsolf, J. D.↗

NREL Smart Grid Projects

Although implementing Smart Grid projects at the distribution level provides many advantages and opportunities for advanced operation and control, a number of significant challenges must be overcome to maintain the high level of safety and reliability that the modern grid must provide. For example, while distributed generation (DG) promises to provide opportunities to increase reliability and efficiency and may provide grid support services such as volt/var control, the presence of DG can impact distribution operation and protection schemes. Additionally, the intermittent nature of many DG energy sources such as photovoltaics (PV) can present a number of challenges to voltage regulation, etc. This presentation provides an overview a number of Smart Grid projects being performed by the National Renewable Energy Laboratory (NREL) along with utility, industry, and academic partners. These projects include modeling and analysis of high penetration PV scenarios (with and without energy storage), development and testing of interconnection and microgrid equipment, as well as the development and implementation of advanced instrumentation and data acquisition used to analyze the impacts of intermittent renewable resources. Additionally, standards development associated with DG interconnection and analysis as well as Smart Grid interoperability will be discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar cell welded interconnection development program

Parallel gap welding and ultrasonic bonding techniques were developed for joining selected interconnect materials (silver, aluminum, copper, silver plated molybdenum and Kovar) to silver-titanium and aluminum contact cells. All process variables have been evaluated leading to establishment of optimum solar cell, interconnect, electrodes and equipment criteria for obtainment of consistent high quality welds. Applicability of nondestructive testing of solar cell welds has been studied. A pre-weld monitoring system is being built and will be utilized in the numerically controlled parallel gap weld station.

Katzeff, J. S.↗

Aircraft equipment

The complex of functionally interconnected instruments and devices for controlling flight, engine operations, electrical systems, communications, and vital systems for passengers and crew is described. The aggregates of the aircraft automatic equipment are also discussed.

Source record↗

Creation of System Validation Platform

The objective of this CRADA between Sandia National Laboratories (SNL) and SunSpec Alliance (SunSpec) was to create a software test platform called the System Validation Platform (SVP) that performs end-to-end certification testing of photovoltaic (PV) inverters, energy storage systems, and other distributed energy resources (DERs). The SVP automates interactions of test equipment (PV and grid simulators), data acquisition systems, and interoperable DERs to certify the devices for advanced grid-support functions and interoperability. To assist electricity grid, operators maintain voltage and frequency, new interconnection requirements in the U.S. and Europe require DERs to have grid-support functions with adjustable settings. Automating the certification process for DER devices impacts the bottom line of NRTLs because they do not need to rely on test engineers running days (or weeks) of experiments to validate the performance of the equipment. These savings can then be passed down to the DER vendors so the certification process becomes less expensive and lowers the barrier to market for PV inverters, charge controllers, and other grid-interconnected equipment. This technology can also be used as a research platform for SNL, other national labs, and universities that would like to run hardware tests with power electronics equipment.

14 SOLAR ENERGY↗

Digital document imaging systems: An overview and guide

This is an aid to NASA managers in planning the selection of a Digital Document Imaging System (DDIS) as a possible solution for document information processing and storage. Intended to serve as a manager's guide, this document contains basic information on digital imaging systems, technology, equipment standards, issues of interoperability and interconnectivity, and issues related to selecting appropriate imaging equipment based upon well defined needs.

Source record↗

A step towards the final frontier: Lessons learned from acceptance testing of the first HPE/Cray EX 3000 system at ORNL

Summary In this article, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800‐node supercomputers, Fawbush and Miller, with access to two independent and identical lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom's Meteorological Office's Unified Model and 4‐dimensional variational data assimilation. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Verónica G.↗

Soft Decision Analyzer and Method

A soft decision analyzer system is operable to interconnect soft decision communication equipment and analyze the operation thereof to detect symbol wise alignment between a test data stream and a reference data stream in a variety of operating conditions.

Steele, Glen F.↗

Soft Decision Analyzer and Method

A soft decision analyzer system is operable to interconnect soft decision communication equipment and analyze the operation thereof to detect symbol wise alignment between a test data stream and a reference data stream in a variety of operating conditions.

Steele, Glen F.↗

Soft decision analyzer and method

A soft decision analyzer system is operable to interconnect soft decision communication equipment and analyze the operation thereof to detect symbol wise alignment between a test data stream and a reference data stream in a variety of operating conditions.

Steele, Glen F.↗

A Step Towards the Final Frontier: Lessons Learned from Acceptance Testing of the First HPE/Cray EX 3000 System at ORNL

In this paper, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800-node supercomputers, Fawbush and Miller, with access to two independent and identical Lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager (HPCM) software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom’s Meteorological Office’s Unified Model (UM) and 4DVAR. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility (OLCF) portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed Lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Veronica↗