Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Commercialization of Distribution System Load Modeling Tool for Improved DER Interconnection Studies

Residential and commercial buildings have huge potential to contribute value to improve grid resilience by participating grid services. To reveal the significant value, it is critical to estimate the grid service capability from these buildings. Unlike the large-scale distributed energy resources such as wind and solar farms, those buildings need to participate grid services in aggregation, not by individual. Therefore, it is important to appropriately group buildings for aggregation. The load profiles in the same group will have similar characteristics at the same time step, so grid operators can send the grid service signal to the customer group with a higher chance to respond at that time step. In this paper, we develop a load profile clustering method to classify the building-level load profiles for grid service capability estimation. In our two-step clustering approach, we first calculate the total load consumption for each building, clustering the load profiles based on energy consumption level. Then, we further cluster the load profiles in each energy cluster based on the load shape. The parameter selection for each clustering step is discussed. The proposed method is applied on actual building-level load profiles, and the results have proved the effectiveness of this method.

14 SOLAR ENERGY↗

The Value of Increased HVDC Capacity Between Eastern and Western U.S. Grids: The Interconnections Seam Study

The Interconnections Seam Study examines the potential economic value of increasing electricity transfer between the Eastern and Western Interconnections using high-voltage direct-current (HVDC) transmission and cost-optimizing both generation and transmission resources across the United States, proposing, assessing, justifying, and illustrating a major infrastructure change involving two of the worlds largest power grids. The study conducted a multi-model analysis that used co-optimized generation and transmission expansion planning and production cost modeling. Four transmission designs under eight scenarios were developed and studied to estimate costs and potential benefits. The results show benefit-to-cost ratios that reach as high as 2.5, indicating significant value to increasing the transmission capacity between the interconnections under the cases considered, realized through sharing generation resources and flexibility across regions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The North American Renewable Integration Study (NARIS): A U.S. Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a U.S. perspective in coordination with the U.S. Department of Energy, and a companion report describes a Canadian perspective in coordination with the Natural Resources Canada. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

The North American Renewable Integration Study (NARIS): A Canadian Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a Canadian perspective in coordination with the Natural Resources Canada, and a companion report describes a U.S. perspective in coordination with the U.S. Department of Energy. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

Solar-cell interconnects

Study findings concluded that useful bonds can be formed with silver ribbon, silver-plated copper ribbon, and aluminum ribbon. Bonds were formed at from 300 C to 400 C and with enough contact pressure to produce some deformation of ribbon.

Source record↗

Fast Iterative Multi-site Hosting Capacity Analysis for Distribution Systems With Search Space Pruning

Interconnection studies for distributed energy resources (DERs) is a time-intensive process, primarily due to the necessity of solving large number of power flow scenarios. Hosting capacity analysis (HCA) is a time-consuming aspect of interconnection studies that is divided into single-site HCA (SHCA) and multi-site HCA (MHCA). From a computational and understandable standpoint, the industry seeks iteration-based solutions for SHCA, although it doesn't maximize the total DER hosting capacity (DERHC) of the grid, as MHCA does. While non-iterative solutions are available for MHCA, they involve a trade-off between the modeling accuracy of the distribution system, solution quality, and ease of understanding. In this work, we present a fast iterative solution for MHCA, reducing computational complexity by eliminating the need to solve power flows for a large amount of search space, thus making iterative solutions feasible. This iterative approach guarantees both a global optimal solution with sufficient time and a fast, close-to-optimal solution through efficient search space pruning. It also easily integrates with existing utility HCA tools. The results are demonstrated on select locations in the IEEE-123 bus system for community-scale interconnection studies. We highlight the benefits of skipping the need to solve millions of power flows, all while maximizing the grid's total DERHC.

Guddanti, Kishan Prudhvi↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A reliability tradeoff study of interconnecting power processors to mercury ion thrusters

A Monte Carlo mission simulation program has been developed to optimize the solar electric propulsion (SEP) thrust subsystem configuration for an Encke comet rendezvous mission. This program examines several possible options for interconnecting power processors to the mercury ion thrusters in order to enhance mission reliability and to reduce SEP subsystem weight. The quantity of power processors and ion thrusters required to perform the mission successfully depends not only on the total required thrust, but also on the individual thruster and power processor performance and reliability. Based on these considerations, it was necessary to determine the quantity of the active power processors and ion thrusters required at any time and the means of providing redundancy. The results provide the basis for selecting an optimum SEP thrust subsystem for this mission and other missions.

Costogue, E. N.↗

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A High-Fidelity Electromagnetic Transient Model of Inverter-based Resources Integrated to an IEEE-9 Bus System for Benchmarking Studies

An inverter-based resource (IBR) is a source of electricity that is asynchronously connected to the electrical grid via an electronic power converter. These power sources lack the intrinsic behaviors of the standard power plants, presenting specific challenges to system stability. These power sources lack the intrinsic behaviors of the standards power plants and their features are almost entirely defined by the control strategy used on them, presenting specific challenges to system stability as their penetration increases into the already fragile Bulk Power System (BPS). Utilizing renewable energy has a great upside but the electrical industry needs to understand the requirements like performing electromagnetic transient (EMT) simulation studies in planning and/or in interconnection studies. This paper presents the development of a high-fidelity EMT model based on commercial equipment and field parameters, which at the same time aims to study the increasing penetration of IBRs and their impact on the actual BPS. The open-source EMT model developed will be a benchmarking example that can be used to evaluate algorithms in the power grid (including evaluating grid-forming controls, power system monitoring and operation, etc.).

Martinez Montejano, Misael↗

Reference frame studies at JPL/CALTECH

Studies being undertaken in order to interconnect the three principal celestial coordinate systens are reviewed. These systems are the optical frame (FK4/FK5) based on positions of Galactic stars, the planetary/lunar ephemeris frame based on the major celestial bodies of the solar system, and the radio frame constructed from observations of quasars. The optical frame is being connected to the radio frame by VLBI observations of radio-emitting stars, and the radio frame is being tied to the ephemeris frame in several ways; for example, differential VLBI measurements between quasars and planet-orbiting spacecraft. Prospects for future interconnection studies are briefly discussed.

Dickey, J. O.↗

Evaluation of a Reduced-Order Model for IBR Fault Response Representation via OEM Blackbox Models: Preprint

Driven by the need to capture the electromagnetic transients of transmission lines, inverter switching behavior, and detailed control systems, electromagnetic transient (EMT) studies have become increasingly important in industry, such as IBR interconnection study and fault study. However, original equipment manufacturer (OEM) inverter models typically include extensive parameters and proprietary settings that are unavailable to protection engineers. This paper introduces a data-driven, reduced-order model (ROM) developed as a PSCAD library component for use in EMT-based fault studies. The ROM replicates key OEM model behaviors without requiring detailed knowledge of control design or parameterization. The accompanying Python automation scripts streamline data generation, parameter fitting, and validation. The ROM's performance is demonstrated through comparison with both IEEE 2800-compliant and non-compliant OEM models in a real-world power system. Relay responses show nearly identical results, while simulation runtime is reduced by an average of 32.8\%, highlighting the ROM's practicality for protection engineers.

14 SOLAR ENERGY↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis

This report presents an analytical methodology to identify alternative options to manage interconnection costs and streamline interconnection timelines for distribution system-connected photovoltaic (PV) systems not co-located with load. Specifically, the report details the methodology and results of an analysis that: 1. Identifies potential grid violations that would be induced by a PV system requesting interconnection to a distribution circuit; 2. Identifies multiple technically viable options for mitigating the potential violations, including infrastructure upgrades, downsizing the PV system size, curtailment of PV, and addition of battery energy storage; 3. Defines the required technical operating parameters of the system in order to mitigate all potential violations (the "Operating Envelope"); 4. Compares the economics of each option, from the PV developer's perspective. The analysis supports the ongoing evolution of interconnection standards for combined PV and energy storage systems by providing a methodology to define allowable maximum export limits during each hour. The methodology presented could be used by utilities as part of the interconnection study process, to inform negotiations with DER developers and the drafting of mutually acceptable interconnection agreements. The resulting technical operating parameters could be included as part of the interconnection service agreement (ISA) between the system owner and the utility company. The companion report to this analysis, Gill et al. (2022), details the envisioned framework for the implementation of the technical operating parameters.

14 SOLAR ENERGY↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Hy-DAT: A Tool to Address Hydropower Modeling Gaps Using Interdependency, Efficiency Curves, and Unit Dispatch Models

As the power system continues to be flooded with intermittent resources, it becomes more important to accurately assess the role of hydro and its impact on the power grid. While hydropower generation has been studied for decades, dependency of power generation on water availability and constraints in hydro operation are not well represented in power system models used in the planning and operation of large-scale interconnection studies. There are still multiple modeling gaps that need to be addressed; if not, they can lead to inaccurate operation and planning reliability studies, and consequently to unintentional load shedding or even blackouts. As a result, it is very important thathydropower is represented correctly in both steady-state and dynamic power system studies. In this paper, we discuss the development and use of the Hydrological Dispatch and Analysis Tool (Hy-DAT) as an interactive graphical user interface (GUI), that uses a novel methodology to address the hydropower modeling gaps like water availability and inter-dependency using a database, and algorithms, to generate accurate representative models for power system simulation.

Wang, Dewei↗

A review of United States energy-only generator interconnection service policy and considerations for reform

Grid interconnection has emerged as a significant obstacle to the development of new electricity resources. There is growing interest in energy-only interconnection, which is an interconnection service option meant to allow the interconnection of new generators without ensuring their energy deliverability during all hours through the transmission system to customers. This approach potentially avoids upfront congestion-related transmission upgrades but could increase curtailment risk. Interest in energy-only interconnection is shaped by incomplete understanding of how interconnection policy functions in different jurisdictions, a knowledge gap that makes it difficult to determine how energy-only interconnection might be better used or re-designed. In this paper, we provide a regulatory review of energy-only interconnection in U.S. interconnection policy and practice, identifying jurisdictions in which rules are close to -or farther from-the theoretical concept of energy-only interconnection service. We find substantial jurisdictional differences in how energy-only interconnection is implemented, driven by differences in resource adequacy frameworks, real-time transmission operations, and state-level procurement practices. U.S. regulators have preferred local jurisdictional flexibility over federal prescription of interconnection study methods and procedures, which also contributes to differences among regions. Such findings raise fundamental questions about whether competition policies in electricity markets should extend beyond spot energy markets and into more prescriptive guidelines around interconnection rules and market entry. This paper sheds light on tensions that energy-only interconnection raises in allowing generators to access the transmission system on an as available basis and discusses how controlling thresholds for congestion-related network upgrades may be a barrier to electricity market entry.

Gorman, Will↗

Powered by PRECISE [Slides]

This presentation is part of the National Renewable Energy Laboratory's (NREL's) Powered By webinar series, hosted by the Grid Planning and Analysis Center. The series highlights NREL's impressive suite of grid planning and analysis tools to help attendees better understand their capabilities and applications. In this presentation, NREL power grid researchers, Killian McKenna and Darice Guittet, and the principal electrical distribution engineer at Sacramento Municipal Utility District, Sheikh Hassan, discuss NREL's PRECISE interconnection tool. PRECISE automates holistic distributed energy resource interconnection studies for distribution utilities by leveraging diverse utility datasets.

14 SOLAR ENERGY↗