Estimating kinetic mass transfer by resting-period measurements in flow-interruption tracer tests
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
In a high-current interruption, the contact surface in a vacuum interrupter might be severely damaged by constricted vacuum arcs causing a molten area on it. As a result, a protrusion will be initiated by a transient recovery voltage after current zero, enhancing the local electric field and making breakdowns occur easier. The objective of this paper is to simulate the deformation process on the molten area under a high electric field by adopting the finite element method. A time-dependent Electrohydrodynamic model was established, and the liquid-gas interface was tracked by the level-set method. From the results, the liquid metal can be deformed to a Taylor cone if the applied electric field is above a critical value. This value is correlated to the initial geometry of the liquid metal, which increases as the size of the liquid metal decreases. Moreover, the buildup time of a Taylor cone obeys the power law t = k × E{sup −3}, where E is the initial electric field and k is a coefficient related to the material property, indicating a temporal self-similar characteristic. In addition, the influence of temperature has little impact on the deformation but has great impact on electron emission. Finally, the possible reason to initiate a delayed breakdown is associated with the deformation. The breakdown does not occur immediately when the voltage is just applied upon the gap but is postponed to several milliseconds later when the tip is formed on the liquid metal.
Methods, apparatuses, and computer program products for servicing a globally broadcast interrupt signal in a multi-threaded computer comprising a plurality of processor threads. Embodiments include an interrupt controller indicating in a plurality of local interrupt status locations that a globally broadcast interrupt signal has been received by the interrupt controller. Embodiments also include a thread determining that a local interrupt status location corresponding to the thread indicates that the globally broadcast interrupt signal has been received by the interrupt controller. Embodiments also include the thread processing one or more entries in a global interrupt status bit queue based on whether global interrupt status bits associated with the globally broadcast interrupt signal are locked. Each entry in the global interrupt status bit queue corresponds to a queued global interrupt.
Methods, apparatuses, and computer program products for servicing a globally broadcast interrupt signal in a multi-threaded computer comprising a plurality of processor threads. Embodiments include an interrupt controller indicating in a plurality of local interrupt status locations that a globally broadcast interrupt signal has been received by the interrupt controller. Embodiments also include a thread determining that a local interrupt status location corresponding to the thread indicates that the globally broadcast interrupt signal has been received by the interrupt controller. Embodiments also include the thread processing one or more entries in a global interrupt status bit queue based on whether global interrupt status bits associated with the globally broadcast interrupt signal are locked. Each entry in the global interrupt status bit queue corresponds to a queued global interrupt.
A fundamental aspect of multiple task management is attending to new stimuli and integrating associated task requirements into an ongoing task set; this is "interruption management" (IM). Anecdotal evidence and field studies indicate the frequency and consequences of interruptions, however experimental investigations of mechanisms influencing IM are scarce. Interruptions on commercial flightdecks are numerous, of various forms, and have been cited as contributing factors in many aviation incident and accident reports. This research grounds an experimental investigation of flightdeck interruptions in a proposed IM stage model. This model organizes basic research, identifies influencing mechanisms, and suggests appropriate dependent measures for IM. Fourteen airline pilots participated in a flightdeck simulation experiment to investigate the general effects of performing an interrupting task and interrupted procedure, and the effects of specific task factors: (1) modality; (2) embeddedness, or goal-level, of an interruption; (3) strength of association, or coupling-strength, between interrupted tasks; (4) semantic similarity; and (5) environmental stress. General effects of interruptions were extremely robust. All individual task factors significantly affected interruption management, except "similarity." Results extend the Interruption Management model, and are interpreted for their implications for interrupted flightdeck performance and intervention strategies for mitigating their effects on the flightdeck.
The primary purpose of this study was to determine the relative priorities of various events and activities by examining the probability that a given activity was interrupted by a given event. The analysis will begin by providing frequency of interruption data by crew position (captain versus first officer) and event type. Any differences in the pattern of interruptions between the first officers and the captains will be explored and interpreted in terms of standard operating procedures. Subsequent data analyses will focus on comparing the frequency of interruptions for different types of activities and for the same activities under normal versus emergency conditions. Briefings and checklists will receive particular attention. The frequency with which specific activities are interrupted under multiple- versus single-task conditions also will be examined; because the majority of multiple-task data were obtained under laboratory conditions, LOFT-type tapes offer a unique opportunity to examine concurrent task performance under 'real-world' conditions. A second purpose of this study is to examine the effects of the interruptions on performance. More specifically, when possible, the time to resume specific activities will be compared to determine if pilots are slower to resume certain types of activities. Errors in resumption or failures to resume specific activities will be noted and any patterns in these errors will be identified. Again, particular attention will be given to the effects of interruptions on the completion of checklists and briefings. Other types of errors and missed events (i.e., the crew should have responded to the event but did not) will be examined. Any methodology using interruptions to examine task prioritization must be able to identify when an interruption has occurred and describe the ongoing activities that were interrupted. Both of these methodological problems are discussed In detail in the following section,
This study proposes a methodology for characterizing the causal context and consequences of procedural interrupts in ground operations tasks. Behavioral science researchers observed 26 tasks at NASA's Kennedy Space Center. From these tasks, 81 procedural interrupts were identified and coded for the following information: source of the interrupt, circumstances surrounding the interrupt, and consequences of the interrupt. We found that more interrupts were equipment or personnel-related than procedure-related. More interrupts were due to unavailable resources or resources being incorrect than resources being inaccessible, and most interrupts resulted in some action being taken. Variation in duration of procedural interrupts across causal categories was also examined. The characterization process helps to identify those interrupts that are disruptive, those that cannot be avoided, and those that may have been prevented through better planning or scheduling of resources. Implications for the use of the methodology and suggestions for further research are discussed.
Executing application function calls in response to an interrupt including creating a thread; receiving an interrupt having an interrupt type; determining whether a value of a semaphore represents that interrupts are disabled; if the value of the semaphore represents that interrupts are not disabled: calling, by the thread, one or more preconfigured functions in dependence upon the interrupt type of the interrupt; yielding the thread; and if the value of the semaphore represents that interrupts are disabled: setting the value of the semaphore to represent to a kernel that interrupts are hard-disabled; and hard-disabling interrupts at the kernel.
Purpose: To investigate whether interruptions in radiotherapy are associated with decreased survival in a population-based sample of head-and-neck cancer patients. Methods and Materials: Using the Surveillance, Epidemiology, and End Results-Medicare linked database we identified Medicare beneficiaries aged 66 years and older diagnosed with local-regional head-and-neck cancer during the period 1997-2003. We examined claims records of 3864 patients completing radiotherapy for the presence of one or more 5-30-day interruption(s) in therapy. We then performed Cox regression analyses to estimate the association between therapy interruptions and survival. Results: Patients with laryngeal tumors who experienced an interruption in radiotherapy had a 68% (95% confidence interval, 41-200%) increased risk of death, compared with patients with no interruptions. Patients with nasal cavity, nasopharynx, oral, salivary gland, and sinus tumors had similar associations between interruptions and increased risk of death, but these did not reach statistical significance because of small sample sizes. Conclusions: Treatment interruptions seem to influence survival time among patients with laryngeal tumors completing a full course of radiotherapy. At all head-and-neck sites, the association between interruptions and survival is sensitive to confounding by stage and other treatments. Further research is needed to develop methods to identify patients most susceptible to interruption-induced mortality.
The coronavirus disease 2019 (COVID-19) has presented unprecedented challenges to the generic drug development, including interruptions in bioequivalence (BE) studies. Per guidance published by the US Food and Drug Administration (FDA) during the COVID-19 public health emergency, any protocol changes or alternative statistical analysis plan for COVID-19-interrupted BE study should be accompanied with adequate justifications and not lead to biased equivalence determination. In this study, we used a modeling and simulation approach to assess the potential impact of study outcomes when two different batches of a Reference Standard (RS) were to be used in an in vivo pharmacokinetic BE study due to the RS expiration during the COVID-19 pandemic. Simulations were performed with hypothetical drugs under two scenarios: (1) uninterrupted study using a single batch of an RS, and (2) interrupted study using two batches of an RS. The acceptability of BE outcomes was evaluated by comparing the results obtained from interrupted studies with those from uninterrupted studies. The simulation results demonstrated that using a conventional statistical approach to evaluate BE for COVID-19-interrupted studies may be acceptable based on the pooled data from two batches. An alternative statistical method which includes a “batch” effect to the mixed effects model may be used when a significant “batch” effect was found in interrupted four-way crossover studies. However, such alternative method is not applicable for interrupted two-way crossover studies. Overall, the simulated scenarios are only for demonstration purpose, the acceptability of BE outcomes for the COVID19-interrupted studies could be case-specific.
Externally-imposed tasks frequently interrupt ongoing task performance in the commercial flight deck. While normally managed without consequence, basic research as well as aviation accident and incident investigations show that interruptions can negatively affect performance and safety. This research investigates the influence of interruption and interrupted task modality on pilot performance in a simulated commercial flight deck. Fourteen current commercial airline pilots performed approach scenarios in a fixed-base flight simulator. Air traffic control instructions, conveyed either aurally or visually (via a data link system) interrupted a visual task (obtaining information from the Flight Management System) and an auditory task (listening to the automated terminal information service recording). Some results confirm the hypothesized performance advantage of cross-modality conditions, more compelling nature of auditory interruptions, and interruption-resistance of auditory ongoing tasks. However, taken together, results suggest the four interaction conditions had different effects on pilot performance. These results have implications for the design of data link systems, and for facilitating interruption management through interface design, aiding, and training programs.
In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.
In order to study the effects different logic systems might have on interrupted operation, an algebraic calculator and a reverse polish notation calculator were compared when trained users were interrupted during problem entry. The RPN calculator showed markedly superior resistance to interruption effects compared to the AN calculator although no significant differences were found when the users were not interrupted. Causes and possible remedies for interruption effects are speculated. It is proposed that because interruption is such a common occurrence, it be incorporated into comparative evaluation tests of different logic system and control/display system and that interruption resistance be adopted as a specific design criteria for such design.
Large scale space missions of the near future will depend upon successful multi-launch coordination and construction in the space environment. One of the main challenges is how to accomplish a valid global analysis of a construction project with the intent of improving safety, reducing overall mission cost, and total construction time. These three items are dependent on the interruptability of the project, which is the ability of the project to recover from unplanned interruptions; such as failure of the launch vehicle; sudden, on-orbit, crew illness; or damage from a space debris impact on the partially completed space structure. A new method for addressing and analyzing this type of problem is being developed. The method is called Program Interruptability and Risk Evaluation Technique, or PIRET. PIRET has been developed in order to model and analyze potential interruptability concerns of the construction of the U.S. Space Station Freedom (SSF), although PIRET is applicable to any complex, multi-launch structural assembly. This paper is a progress report on the continuing research of the NASA Center for Space Construction at the University of Colorado, Boulder into this area of space construction interruptability. The paper will define the problem of interruptability, will diagram the PIRET approach to space construction, will share results from a preliminary PIRET analysis of SSF, and will show that PIRET is a useful tool for modelling space construction interruptability.
A method aud system utilize a processor's digital timer and two interrupts to form a frequency multiplier. The first internipt's processing time window is definable by a first uumber of counts C(sub 1), of the digital timer while the second interrupt's processing time window is definable by a second number of counts C(sub 2) of the digital timer. A count value CV utilized by the systedmethod is based on a desired frequency multiplier N(sub 1), the timer clock rate, and the tiole required for one cycle of an input signal. The first interrupt is triggered upon completion of one cycle ofthe input sigual at which point the processing time window associated therewith begins. The second interrupt is triggered each time the timer's overflow signal is generated at which point the processing time window associated with the second interrupt begins. During the occurrence of the second interrupt's processing. the count value CV is modified to maintain the first interrupt's processing time window approximately centered between two of the second internipt's processing time windows.
The risks of long-duration, widespread interruptions (LDWIs) in electrical power are a concern of U.S. regulators, the electric power industry, and stakeholders. Those responsible for making decisions about increasingly costly investments to prevent such interruptions and to facilitate rapid recovery when they do occur need relevant information on which to base those decisions. Although a number of studies have examined the physical and engineering impacts of extreme weather and other precipitating events on the bulk power system, decision makers evaluating investments in preventive strategies need information on the costs of past power interruptions and the benefits of preventing them in the future. This paper contributes to addressing this need by offering six case studies that detail the economics, at the level of the utility service territory, of power interruptions caused by extreme weather and lasting from a few days to several weeks. These intermediate-duration interruptions have been, and will continue to be, the most common type of major electric power disruption. They are longer than the short-term disruptions addressed in utility reliability planning, but not as long or widespread geographically as the national-scale interruptions with durations of many weeks, months, or longer that have been examined in some recent studies.
This technical brief estimates the expected performance of a solar photovoltaic and energy storage system (PVESS) for providing backup power during short-duration power interruption events, accounting for the unpredictable nature of those events. The analysis relies on the Power Reliability Event Simulation TOol (PRESTO), a publicly available model developed by Berkeley Lab to simulate the occurrence of short-duration power interruption events at the county-level. A separate storage dispatch model is then used to simulate PVESS operation and backup performance for each of the large number of interruption events produced by PRESTO. In performing this simulation, the analysis accounts for how the customer operates its battery on a day-to-day basis—in this case, we assume the battery is cycled each day in response to time-of-use rates—and how that, in turn, impacts the battery’s state of charge at the beginning of each interruption event. The analysis presented here is intended to demonstrate an application of the PRESTO model as well as to illustrate some of the key determinants of PVESS backup power performance during short-duration power interruption events. The analysis focuses initially on a typical single-family home in Maricopa County, Arizona, and includes a limited set of scenarios related to system sizing, backup power configuration, and whether the customer charges its battery storage system from the grid during normal operating conditions. The analysis also presents comparative results for two other counties, in Massachusetts (Middlesex) and California (Los Angeles), illustrating how regional differences in climate, interruption patterns, and retail rate structures can affect PVESS performance as a backup power source. In the conclusions, we highlight a number of other important considerations for evaluating PVESS backup power capabilities.