DOE OSTI2025
The Roughrider Carbon Storage Hub was a 2-year project (October 2023 – September 2025) conducted by the Energy & Environmental Research Center (EERC) focused on advancing the feasibility of a commercial-scale carbon dioxide (CO 2 ) geologic storage hub in McKenzie County, North Dakota. The project’s objective was to investigate the potential that stacked storage complexes (multiple deep saline formations) can safely and economically store at least 50 million tonnes of CO 2 within 30 years. The captured CO 2 would be sourced from industrial emitters including project partner ONEOK, Inc.’s gas-processing plants and a planned gas-to-liquids facility. Drilling of the Roughrider 1 stratigraphic test well (14,979-ft total depth) was completed in November 2024. The wellbore intersected four candidate storage formations: Inyan Kara, Broom Creek, Mission Canyon, and Black Island–Deadwood. Operational challenges, including a stuck drill string, were resolved without long-term impact. A comprehensive logging and coring program was conducted, followed by successful well abandonment and site reclamation. Over 660 ft of 4-in. whole core was retrieved. Core plug samples were processed and analyzed for petrophysical and geochemical properties. Results confirmed promising porosity and permeability in the Inyan Kara and Broom Creek Formations and removal of the Mission Canyon and Black Island–Deadwood horizons from further investigation. Data derived from the logging and coring program were used to improve initial geologic models built from legacy data. CO 2 injection simulations showed that the Inyan Kara alone can feasibly store the target mass of CO 2 . Because of subtle differences in geologic structure and porosity trends between the formations, a stacked storage scenario using the Broom Creek and Inyan Kara Formations resulted in a larger overall plume area than using the Inyan Kara alone. Preliminary CO 2 pipeline routes from the industrial sources were mapped utilizing existing rights of way and evaluated for capacity and cost using U.S. Department of Energy Office of Fossil Energy and Carbon Management/National Energy Technology Laboratory models and U.S. Environmental Protection Agency emissions data. Integrating capture, transport, and storage cost estimates with policy incentives (e.g., 45Q credits) provided a total cost-per-ton analysis. Results indicate that the small scale of the volumes to be transported over the cumulative large distances does not support the project’s financial viability. However, the groundwork laid during this project from geological, regulatory, and social perspectives positions the Roughrider hub site as a promising candidate for commercial carbon storage in North Dakota, especially if the economy of scale is introduced for CO 2 transportation to the hub site.
01 COAL, LIGNITE, AND PEAT↗