Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Rotorcraft Health Management Issues and Challenges

This paper presents an overview of health management issues and challenges that are specific to rotorcraft. Rotorcraft form a unique subset of air vehicles in that their propulsion system is used not only for propulsion, but also serves as the primary source of lift and maneuvering of the vehicle. No other air vehicle relies on the propulsion system to provide these functions through a transmission system with single critical load paths without duplication or redundancy. As such, health management of the power train is a critical and unique part of any rotorcraft health management system. This paper focuses specifically on the issues and challenges related to the dynamic mechanical components in the main power train. This includes the transmission and main rotor mechanisms. This paper will review standard practices used for rotorcraft health management, lessons learned from fielded trials, and future challenges.

Zakrajsek, James J.↗

Compliance of NNSS Activities with P322-4 Issues Management and NNSSWAC Requirements

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of the compliance of Waste Management Program activities to Issues Management/Corrective Action requirements communicated in P322-4 and the Nevada National Security Site Waste Acceptance criteria (NNSSWAC). All corrective actions reviewed and records examined were found to be compliant with appropriate and relevant procedures. There were no Findings or Opportunities for Improvement noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Shuttle management issues

This paper describes the many management methods being implemented on the Space Shuttle Program. Management attention to cost reduction and the techniques being used to meet the Shuttle cost commitment are described. A detailed explanation is given for the NASA Performance Measurement System but all other major management tools being used are also discussed.

Roseman, H. M.↗

Configuration management issues and objectives for a real-time research flight test support facility

Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

Yergensen, Stephen↗

Risk Management Issues - An Aerospace Perspective

Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

Perera, Jeevan S.↗

Configuration management issues and objectives for a real-time research flight test support facility

An account is given of configuration management activities for the Western Aeronautical Test Range (WATR) at NASA-Ames, whose primary function is the conduct of aeronautical research flight testing through real-time processing and display, tracking, and communications systems. The processing of WATR configuration change requests for specific research flight test projects must be conducted in such a way as to refrain from compromising the reliability of WATR support to all project users. Configuration management's scope ranges from mission planning to operations monitoring and performance trend analysis.

Yergensen, Stephen↗

Management issues in systems engineering

When applied to a system, the doctrine of successive refinement is a divide-and-conquer strategy. Complex systems are sucessively divided into pieces that are less complex, until they are simple enough to be conquered. This decomposition results in several structures for describing the product system and the producing system. These structures play important roles in systems engineering and project management. Many of the remaining sections in this chapter are devoted to describing some of these key structures. Structures that describe the product system include, but are not limited to, the requirements tree, system architecture and certain symbolic information such as system drawings, schematics, and data bases. The structures that describe the producing system include the project's work breakdown, schedules, cost accounts and organization.

Shishko, Robert↗

Numerical Simulations in Support of a Long-Term Test of Gas Production From Hydrate Accumulations on the Alaska North Slope: Water Production and Associated Design and Management Issues

Here, we investigated numerical simulation strategies for a long-term test of depressurization-induced gas production from the B1 Sand of Unit B at the Hydrate-01 Stratigraphic Test Well. The main objective of this study was to estimate fluid production rates (with emphasis on water production) under a variety of conditions and production scenarios and contribute new insights to the design and management of the field test. In the first part of the study, we investigated the system response to a three-step depressurization process using two limiting sets of flow properties─the expected maximum and minimum intrinsic and effective permeabilities─for the very heterogeneous reservoir. In the second part, we investigated the effect of the production interval length and placement within the formation relative to the boundaries of the hydrate-bearing unit. The best performing well configuration was used in the third part of the study, which used the most representative subsurface flow properties to investigate the effect of the depressurization strategy on the production performance. The best overall performance (largest gas production with modest water production and a strong response at the observation wells) was obtained with a 10 m-long well situated 3 m below the top of the formation and a three-step depressurization scheme at 15-day intervals to a terminal bottomhole pressure of 2.8 MPa. The overall production performance was enhanced by a faster rate of depressurization. Estimated water production rates in all cases were limited and easily manageable. None of the tested well configurations or depressurization strategies significantly reduced water production without also severely reducing gas production. In all the investigated cases, 95% of the long-term fraction of produced water was replenished by inflows from the boundaries and could not be reduced. These substantial water inflows are an unavoidable feature of HU-B and cannot be easily mitigated by a hydraulic control.

02 PETROLEUM↗

Demonstrating artificial intelligence for space systems - Integration and project management issues

As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

Hack, Edmund C.↗

Networked information: Management issues for the acquisitions librarian

Historically, libraries have been the depositories and public access points to both domestic and international government information. A change in the information seeking behavior of the public is driving a change in government information publishing and dissemination. Patrons who traditionally used libraries for access to printed government information have become familiar and comfortable with the electronic environment. These data users are showing an increased interest in certain types of government information in electronic format, including indexes, numeric files, statistics, and hypertext documents. Government response to increased demand for electronic information has led to a flurry of special initiatives, with the production of information products on diskette, CD-ROM, and dissemination via the Internet. Libraries, and acquisitions units in particular, are being challenged to provide consistent and timely management of the information. The rapidly developing communications infrastructure, which frequently redesigns access to the information environment, poses significant obstacles to, and the tremendous opportunities for, making large bodies of government information available to a broad base of users.

Lawrence, Gregory↗

A view of software management issues

The Software Development Environment (SDE) Panel addressed key programmatic, scope, and structural issues raised by its members and the general audience regarding the proposed software development environment for the Space Station program. The general team approach taken by this group led to a consensus on 18 recommendations to NASA mangament regarding the acquisition and definition of the SDE. This approach was keyed by the initial issues presentation given to the general audience. Additional issues (for a total of 23) were developed by the panelists in their first closed session from which key areas were selected and discussed in open session. These discussions led to key recommendations which are summarized and described.

Manley, J. H.↗

Core Community Specifications for Electron Microprobe Operating Systems: Software, Quality Control, and Data Management Issues

Modem electron microprobe systems have become increasingly sophisticated. These systems utilize either UNIX or PC computer systems for measurement, automation, and data reduction. These systems have undergone major improvements in processing, storage, display, and communications, due to increased capabilities of hardware and software. Instrument specifications are typically utilized at the time of purchase and concentrate on hardware performance. The microanalysis community includes analysts, researchers, software developers, and manufacturers, who could benefit from exchange of ideas and the ultimate development of core community specifications (CCS) for hardware and software components of microprobe instrumentation and operating systems.

Fournelle, John↗

Overview of US AID-World Bank-NASA Collaboration to Address Water Management Issues in the MENA Region

The World Bank, USAID and NASA have recently established a joint project to study multiple issues pertaining to water related applications in the Middle East North Africa (MENA) region. The main concentration of the project is on utilization of remote sensing data and hydrological models to address crop irrigation and mapping, flood mapping and forecasting, evapotranspiration and drought problems prevalent in this large geographic area. Additional emphases are placed on understanding the climate impact on these areas as well. Per IPCC 2007 report, by the end of this century MENA region is projected to experience an increase of 3 C to 5 C rise in mean temperatures and a 20% decline in precipitation. This poses a serious problem for this geographic zone especially when majority of the hydrological consumption is for the agriculture sector and the remaining amount is for domestic consumption. The remote sensing data from space is one of the best ways to study such complex issues and further feed into the decision support systems. NASA's fleet of Earth Observing satellites offer a great vantage point from space to look at the globe and provide vital signs necessary to maintain healthy and sustainable ecosystem. These observations generate multiple products such as soil moisture, global precipitation, aerosols, cloud cover, normalized difference vegetation index, land cover/use, ocean altimetry, ocean salinity, sea surface winds, sea surface temperature, ozone and atmospheric gases, ice and snow measurements, and many more. All of the data products, models and research results are distributed-via the Internet freely through out the world. This project will utilize several NASA models such as global Land Data Assimilation System (LDAS) to generate hydrological states and fluxes in near real time. These LDAS products will then be further compared with other NASA satellite observations (MODIS, VIIRS, TRMM, etc.) and other discrete models to compare and optimize evapotranspiration, soil moisture and crop irrigation, droUght assessment and water balance. The floods being a critical disaster in many of the MENA countries, NASA's global flood mapping and modeling framework (CREST) will be customized for country specific needs and delivered to the remote sensing organizations for their future use. Finally, capacity building is a critical part of this project and NASA will assist in this effort as well.

Habib, Shahid↗

Issues in management of artificial intelligence based projects

Now that Artificial Intelligence (AI) is gaining acceptance, it is important to examine some of the obstacles that still stand in the way of its progress. Ironically, many of these obstacles are related to management and are aggravated by the very characteristcs that make AI useful. The purpose of this paper is to heighten awareness of management issues in AI development and to focus attention on their resolution.

Kiss, P. A.↗

Issues in NASA program and project management

This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

Hoban, Francis T.↗