Search NASA⌕ Search

SEARCH · Search NASA

Results for “labs facilities”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Smart Labs: Improving Lab Facilities to Meet Decarbonization Goals

Smart Labs enable safe and efficient world class science to occur in laboratories through high-performance methods. The Smart Labs Toolkit describes a systematic process to help laboratory owners and operators plan, assess, optimize, and manage laboratory facilities. This half-day workshop reviews the four phases of the Smart Labs Toolkit along with an interactive activity to complete a Laboratory Ventilation Risk Assessment. This session will also highlight the Lab Benchmarking Tool, which compares the energy use, emissions, and operational practices of lab buildings with similar facilities. Attendees will also discuss application as well as sharing tools and best practice guides.

assessment↗

Isotope Production at the Jefferson Lab LERF Facility (Final Report)

The project initially proceeded well, meeting all of the Milestones. However, the need to create a new irradiation area in the LERF (the initial proposal was to use the CEBAF Injector) used up a larger fraction of the budget than foreseen. A further problem arose when the hot-cell became unavailable at VCU, followed by VCU dropping out of the collaboration. This meant that we were unable to separate the 67 Cu from the gallium. We replaced this by carrying out detailed gamma spectroscopy to determine the quantity of 67 Cu produced.

07 ISOTOPE AND RADIATION SOURCES↗

Isotope Production at the Jefferson Lab LERF Facility

The project initially proceeded well, meeting all of the Milestones. However, the need to create a new irradiation area in the LERF (the initial proposal was to use the CEBAF Injector) used up a larger fraction of the budget than foreseen. A further problem arose when the hot-cell became unavailable at VCU, followed by VCU dropping out of the collaboration. This meant that we were unable to separate the 67 Cu from the gallium. We replaced this by carrying out detailed gamma spectroscopy to determine the quantity of 67 Cu produced. This work was published as presentations in November of 2021 by the two doctoral students (Geno Santistevan and Robert Bentley) and proceedings articles for American Nuclear Society’s topical meeting AccApp21 (https://www.ans.org/pubs/proceedings/issue-3206/), as well as in invited, expanded versions in the peer-reviewed journal “Nuclear Science and Engineering”. Geno and Robert have subsequently successfully leveraged this research to achieve “doctoral candidacy” status and are expected to defend their dissertations in the Fall of 2023.

07 ISOTOPE AND RADIATION SOURCES↗

Design and commissioning of an e-beam irradiation beamline at the Upgraded Injector Test Facility at Jefferson Lab

We report the Upgraded Injector Test Facility (UITF) at Jefferson Lab is a continuous-wave superconducting linear accelerator capable of providing an electron beam with energy up to 10 MeV. A beamline for electron-beam irradiation has been designed, installed and successfully commissioned at this facility, aimed at the degradation study of 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS) in wastewater treatment. A solenoid with a peak axial magnetic field of up to 0.28 T and a set of raster coils were used to obtain a Gaussian beam profile with a transverse standard deviation of ~ 15.0 mm at the target location. Monte-Carlo simulations using FLUKA were carried out to calculate the total absorbed dose and the dose distribution in the sample volume inside the target cell. The simulations were benchmarked experimentally by dosimetry mapping using optichromic dosimeters. The results of the irradiation experiments showed a ~ 95% reduction of 1,4-dioxane in ultra-pure water for a dose of 1 kGy, demonstrating the potential of electron-beam irradiation towards addressing growing challenges in environmental remediation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Leveraging National Laboratory Assets to Address Stability Challenges due to Declining Grid Inertia Using Geographically Distributed Electrical–Thermal Co-Emulation

Due to increased penetration of low-inertia resources into the electric grid, challenges are increasing for maintaining wide-area system stability. Grid stability assessment requires a faithful representation of the multiple-physics interaction at the system level, and timescales of interaction varying in orders of magnitude, from microseconds to seconds to several minutes. Along with the simulation-based techniques, hardware-in-the-loop (HIL), controller HIL, and power HIL techniques have been developed to better understand the emergent behavior of the system with emerging technologies. US National Laboratories have played a vital role in research and development to understand the behavior of individual technologies and devices integrated to the electric grid. Each national laboratory forwards a technological and strategic initiative tied core and enabling capabilities. Due to strategic, efficiency, and economic reasons, not all the labs have assets to conduct research on all technologies concomitantly, so it becomes crucial to integrate the labs across geographies to understand the interplay of different technologies together at the system level. This approach avoids duplication of the assets at different lab facilities and helps understand the integrated system behavior of various technologies representative of actual grid conditions by connecting multiple national labs. This article talks about techniques of connecting three national laboratories to enable co-emulation of electrical–mechanical–thermal characteristics of devices and systems. Such an approach can be used to understand the dynamic and transient interaction of multi-physics in a system level, at-scale emulation using real-time simulation tools and techniques.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Beamdump facility at Jefferson Lab

The potential of the intense secondary muon, neutrino, and (hypothetical) light dark matter beams at the Thomas Jefferson National Accelerator Facility (Jefferson Lab) is explored. These are produced in the high-power dumps with high-current electron beams. Light dark matter searches with the approved Beam Dump eXperiment (BDX) are driving the realization of a new underground vault behind Hall A that could be extended to a Beamdump Facility with little additional installations. High-energy muons created via the Bethe–Heitler process uniquely do not proceed through the more common pion production and decay channels. Several possible muon physics applications are highlighted. Neutrino detector technologies and experiments suitable for a beamdump facility are outlined.

Accelerator Physics↗

Raising the Bar in High Performance Laboratory Design

Laboratory facilities are expensive to build and operate, they consume energy at high rates compared to other types of buildings, and modifications are frequently required to accommodate ever-changing research activities. PNNL sought ways to address these issues in the design and construction of a 14,700 sq. ft. new laboratory building. To improve adaptability to change a high roof structure was used that allows raising the ceiling when needed with minimal disruption to installed HVAC and electrical utilities. Also, HVAC equipment was located on a mezzanine above the central corridor rather than above ceilings. This eliminates the need for maintenance personnel to routinely access lab spaces, reducing disruption to research staff and improving maintenance access. To improve the reliability of operations while reducing energy consumption, heat pipe heat recovery with evaporative cooling, zoned heating/cooling coils, high-efficiency condensing boilers, district cooling, VAV fume hoods, DDC controls, energy use monitoring, and implementation of the US Department of Energy’s Guiding Principles for Federal Leadership in Sustainable Buildings were all used. The energy model developed during design projected energy use at 2,840 MBtu/yr, a 13.5% savings over ASHRAE Standard 90.1-2010. The first full year of operation resulted in actual energy use of 2,661 MBtu, a savings of 19% over Standard 90.1. As a result of the project design’s demonstrated success, these strategies will be incorporated into a significantly larger (125,000 sq ft), $65 million lab facility to be constructed on the PNNL campus in 2020.

Scott, Jeffery M.↗

Robust Combined Heat and Hybrid Power (CHHP) for High Electrical Efficiency Cogeneration

Georgia Tech (Prime Recipient), the University of Texas at El Paso (UTEP) and the National Energy Technology Laboratory (NETL) investigated a hybrid fuel cell/ gas turbine system concept as a combined heat and hybrid power (CHHP) system for both robust and high power-to-process heat ratio cogeneration. The novelty of the proposed system entailed the distinct, elevated electrical efficiencies it maintains while simultaneously supporting a broad span of heating needs (e.g., supply temperatures) demanded across variable heat loads. The scope included: 1) leveraging a pioneering national lab facility configured for dynamic system operability development of hybrid fuel cell/gas turbine cycles; 2) enabling technology development to adjust and modulate the quality and quantity of thermal supply to bottoming heat loads via novel extreme temperature gas bypass valves. Hybrid fuel cell/gas turbine systems have primarily been reduced-to-practice in a constrained (e.g., initial proof-of-concept) manner and have still demonstrated considerable electrical efficiencies. However, these pre-pilot systems have focused upon electrical efficiencies and electrical power generation as the exclusive energy demand. Such hybrid systems had not been extensively researched or developed for flexible and variable operation consisting of both power and heat demands; however, these variable combined power and heat demands are characteristic of many types of manufacturers such as animal/poultry processing, bakeries and milk/flour/pastry manufacturing, textile mills, and electrochemical processing. Commercially, developing the system into a working combined heat and power system benefits these types of manufacturers by allowing them to meet their power and heat demands at a lower cost, higher efficiency, and/or through onsite generation. Therefore, the technical scope of this project was largely to study and facilitate these hybrid systems as combined heat and hybrid power (CHHP) systems that include dynamic operability for variable heat and power loads and/or grid dynamics for various types of manufacturers. Simulation results were used to predict the performance of the CHHP system and conceptually develop it to achieve desired dynamic operability. Experimentally, the primary goal was to design, manufacture, and experiment upon a high-temperature bypass valve. Experimental data included air mass flow rates through the valve orifice when the valve was changed to variable extent between fully closed and fully open. The experimental data was then used to create a semi-empirical computational model of the bypass valve. Concluded simulation goals for the research included developing computational heat exchanger models for the hybrid system inclusive of the bottoming heat exchanger and the recuperative heat exchanger, and then combining the computational recuperator model with the computational valve model. Afterwards, the computational models were then integrated to predict the dynamic operation of hybrid fuel cell/gas turbine cycles throughout a design space and reporting such. The scope stated in the preceding paragraph was packaged into five specific goals: 1) enabling the simulation of dynamic combined heat and power through the creation of computational, modular heat exchanger models; 2) simulation and exploration of the CHHP system’s performance by integrating the heat exchanger models with the national lab’s pre-existing hybrid system (computational) simulation, but without the recuperator bypass valve concept in order to initially determine how the (baseline) system behaves and can be controlled in order to meet variable heat and power demands; 3) development and initial deployment of the high-temperature recuperator bypass valve technology in order to confirm and characterize the approach; 4) usage of the experimental data for the valve to create a semi-empirical computational model for the bypass valve which could then be combined with the heat exchanger computational models; 5) repeat of the second task of simulating and exploring the system’s performance, but this time including the bypass valve to resolve its efficacy. Tasks were successfully completed, and the general notion of flexibly operating, high electrical efficiency CHHP was further corroborated. Supportive details are provided in the report.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Audit Report: Automated Meteorological Monitoring Stations, Lawrence Livermore National Laboratory

The Waste and Air Quality Offices Group at the Lawrence Livermore National Laboratory operates two main meteorological monitoring sites near Livermore, California. The primary met tower (Site 200) is located in the northwest corner of the lab and consists of a fifty-two (52) meter tower with vertical wind speed sensors, horizontal wind speed and direction sensors and air temperature sensors at fifty-two (52) meters, twenty-three (23) meters and ten (10) meters. In addition, there is a temperature and humidity probe at ten (10) meters. At two (2) meters there are upward and downward facing solar and infrared radiation sensors, an air temperature sensor, barometric pressure sensor and a temperature and relative humidity probe. At ground level there is a tipping bucket rain gauge located to the southwest of the tower. The datalogger, communication peripherals and the barometric pressure sensor are housed in a small building near the tower. The Site 300 met site is located approximately 10 miles east of Livermore within the boundary of the LLNL blast test site. This site also consists of a 52-meter tower which is configured the same as the 52-meter tower at Site 200. There is also a building at this site that houses the datalogger, communication peripherals and the barometric pressure sensor. At both Site 200 and Site 300, data are collected by Ethernet with telephone modem collection as a backup. The data collection interval for both sites is fifteen (15) minutes via workstations running Loggernet software located at the main lab facility. The audits of the Lawrence Livermore National Laboratory’s two automated meteorological stations located near Livermore, California were performed on October 24 & 25, 2023. These audits were performed under the guidelines of the Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV, Version 2 and the On-Site Meteorological Program Guidance for Regulatory Modeling Applications, U.S. EPA.

54 ENVIRONMENTAL SCIENCES↗

Quantum-enhanced Imaging and Spectroscopy and their Relevance to International Safeguards

As a follow-up to our previous report on quantum sensing for safeguards, here we delve deeper into quantum-enhanced imaging & spectroscopy and address their relevance to international safeguards. Much of the approaches rely on entangled photons, a quantum phenomenon not possible with classical physics, although just correlated photons will work for some applications, such as ghost imaging. We provide a comprehensive survey of quantum approaches, including multiple entangled photon ghost imaging and spectroscopy techniques. Entangled photons for noise reduction are also described, as well as Non-Line-Of-Sight imaging, compressive techniques, and squeezed light. Of particular interest is the generation of entangled photons with large wavelength separation, such as infrared/visible entangled photon pairs. Such entangled pairs would allow interaction with objects in the IR, such as in the molecular “fingerprint” wavelength region, while the recording device captures the visible photons, thus leveraging the high efficiency and lower cost of visible detectors. Unfortunately, entangled x-ray photons are not practical, which would have been useful for safeguards to interrogate shielded materials. Entangled gamma rays are even further beyond reason. We provide our assessment for application of quantum-enhanced imaging & spectroscopy for international safeguards, including suggested improvements to existing IAEA instruments and destructive assay measurements that are done at IAEA lab facilities.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

An Advanced Machine Learning and Artificial Intelligence System for Demonstrating Radiation Regulatory Compliance in DOE Accelerator Facilities

In this Phase II proposal, Applied Research LLC (ARLLC), Thomas Jefferson National Accelerator Facility (Jefferson Lab), and Old Dominion University (ODU) propose the combination of domain knowledge (beam characteristics, fixed structural shielding, earthen burden (the soil and foliage added to the dome of the experimental halls as additional shielding), etc.), machine learning (ML) and/or artificial intelligence (AI) to correlate a variety of multi-modal onsite signals and the radiation fields seen in accessible areas of the accelerator site and the site boundary. The ML/AI will consider the complex influence of environmental parameters affecting the radon contribution of the measurements, focusing on actual data obtained from Jefferson Lab. In Phase I, the coded beam and location data were fed into a deep learning model to predict doses at several designated locations in Jefferson Lab’s facility. Moreover, a dense radiation map was generated using only a sparse collection of the samples in a facility. In Phase II, we will develop a software prototype containing a radiation prediction algorithm, dense radiation map algorithms, and background noise prediction algorithms, with actual data used to evaluate the prototype. This work will provide a framework for evaluation of radiation measurement results around the site based on learned responses. In addition, the proposed approach allows more granular mapping of radiation levels. Better understanding and communication of these levels is related to the overall approach in keeping doses to personnel ALARA.

43 PARTICLE ACCELERATORS↗

A Solid Polarized Target Development Facility at Jefferson Lab

Solid polarized targets are a crucial tool used in scattering experiments to investigate different properties of the nucleon. The equipment used to produce, measure, and maintain conditions for the polarized material is complex in comparison to nonpolarized targets. This, in combination with the frequency of polarized experiments run at Jefferson Lab, limits the opportunity to refine and build upon experience gained from previously constructed targets. To address this, the Jefferson Lab Target Group has begun the construction of a permanent facility dedicated to creating and testing material for Dynamic Nuclear Polarization. The design elements and manufacture of the test cryostat along with the incorporation of other DNP associated equipment will be presented.

Brock, James [Thomas Jefferson National Accelerato↗

First Results from Two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.

Eremeev, G.↗

Bottom-Up Costs and Market Analysis of the Horizontal Ribbon Growth (HRG) Technology (Final Report)

The American-Made Solar Prize is a prize competition from the U.S. Department of Energy that is designed to revitalize U.S. solar manufacturing. The competition aims to support the growth of U.S. solar manufacturing and reenergize American energy innovation by tapping into American's competitive spirit and the nation's unparalleled innovation ecosystem leveraging national labs, incubators, facilities and more. National Renewable Energy Lab (NREL) will provide technical and business advisement to the noted Solar Prize finalists. This CRADA will involve the development of a cost model of the CRADA Participant's horizontal ribbon growth (HRG) technology for making silicon wafers for solar cells.

14 SOLAR ENERGY↗