At least 19 records

10 MWE CDCL Large Pilot Plant – pre-FEED Study (Final Report)

The Following Document is the Final Technical Scientific Report for the project tittle “10 MWE CDCL Large Pilot Plant – pre-FEED Study” performed by The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and the Dover Light & Power Municipal Power Plant. The project Team performed a pre-Front End Engineering Design study of a 10 MWe Coal-Direct Chemical Looping power plant to be hosted at the Dover Light & Power Municipal Plant. As part of the pre-FEED study, the project Team performed multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Techno-Economic analysis was updated based on the FEED study and the pilot tests results. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with a high efficiency with a cost of electricity of $83.3 / MWh, which corresponded to less than 30% increase in cost of electricity compared to the cost of electricity of a base case study of a supercritical PC boiler.

01 COAL, LIGNITE, AND PEAT↗

10 MWE CDCL Large Pilot Plant – pre-FEED Study

Coal Direct Chemical Looping (CDCL) is an advanced oxy-combustion technology that has the potential to substantially reduce the energy penalty and the cost of electricity (COE) for coal-fired power generation with CO₂ capture. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been collaborating on the development of an iron oxide oxygen-carrier based chemical looping technology for clean power generation with inherent carbon capture. In this process, coal is dried and pulverized prior to being transported into a moving-bed reducer. In the reducer, coal reacts with the oxygen-carrier particles, forming combustion byproducts, predominantly CO₂ and H₂O, while reducing the iron oxide oxidation state from Fe₂O₃ to a mixture of FeO and Fe. The reduced state particles are then transported to a combustor reactor and re-oxidized with air. Following the oxidation, the oxygen-carrier particles are regenerated, and a large amount of heat is released for steam production. The produced steam is sent to a turbine for electricity generation. Meanwhile, the CO₂–rich stream leaving the reducer is cooled, cleaned, and compressed for subsequent pipeline transportation and sequestration. By combining air separation and fuel conversion into a single system, the CDCL technology enables the intensification of oxy-combustion processes by eliminating the energy and cost intensive cryogenic air separation unit and thereby results in higher overall plant efficiencies and lower COE’s. The use of a moving-bed reducer results in high conversions of volatile hydrocarbons and high CO₂ purity, which reduces the cost of downstream CO₂ purification for sequestration or utilization. The Babcock & Wilcox Company in collaboration with The Ohio State University, Johnson & Matthey, The Electric Power Research Institute, and Dover Light & Power completed a Preliminary Front-End Engineering and Design (Pre-FEED) study of a 10 MWe coal-direct chemical looping (CDCL) pilot plant. The planned system is a modular 10 MWe CDCL large pilot facility consisting in 4 modules of 2.5 MWe each, working in parallel and to be hosted within the current structure at the City of Dover’s Municipal Power Plant. The CDCL system can achieve auto-thermal operation and includes a sub-critical steam cycle for power generation. The pilot system was designed to demonstrate full commercial operation at a reduced scale. The coal distribution per plan area is a representative slice of larger commercial arrangements. The system includes a CO₂ recycle system, but it does not include a compression system. The large pilot includes all the environmental control equipment and oxygen carrier and ash handling systems. As part of the project, the Team performed laboratory testing and carried out multiple pilot test campaigns to obtain design and performance information at the 250 kWth CDCL pilot facility at the Babcock & Wilcox Company’s Research Center. The Team demonstrated sustained operations at designed coal inputs, high coal conversion, high CO₂ purity, heat generation on the combustor, low carbon carryover between reactors and low particle attrition. Emissions generated in the reducer reactor were identified as SO₂ and NO x . The commercial manufacturing cost of oxygen carrier particle was evaluated by JM. A particle manufacturing report was generated and submitted to the DOE. Based on the results from the pilot tests and the pre-FEED design efforts, a techno-economic analysis was performed. The study shows that the CDCL process is a promising carbon-friendly technology capable of producing electricity with high efficiency. The estimated COE of the supercritical CDCL plant is $83.3 / MWh, which meets DOE’s target of less than 30% increase in COE when compared to a supercritical PC plant without CO₂ capture. This is the lowest among the existing carbon capture technologies (post-combustion and oxy-combustion) for fossil fuel power plant. CDCL is evaluated to be the most promising technology for carbon capture from the economic aspect.

01 COAL, LIGNITE, AND PEAT↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗

Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗

Heat Integration Optimization and Dynamic Modeling Investigation for Advancing the Coal-Direct Chemical Looping Process

The purpose of the project is to address the optimization and startup operation of a modular coal direct chemical looping (CDCL) combustion system integrated with a steam cycle for power generation to reduce the risks involved in further scale-up of the technology. The modular reactor design of the CDCL process provides flexibility in the fabrication of the reactor and in its operating capacity (i.e. turndown ratio) at the cost of a more complex heat exchange network (HEN) design and integration. To address the technology gaps and advance the efficiency and economic feasibility of the CDCL technology, the project will perform a detailed and comprehensive analysis of the integration of a modular CDCL reactor system and a steam cycle system under both static and transient conditions via HEN process performance simulations and system dynamic modeling, respectively. The scope of work consists of 1) Experimental and computational studies of the CDCL combustor reactor 2) Comprehensive static (i.e. steady-state) system HEN design analysis in CDCL 550 MWe commercial unit for power generation and 3) Dynamic modeling of site specific design of 10MWe CDCL large pilot plant. The project team has successfully developed and validated a kinetic model for the oxidation of oxygen carriers in the combustor using the unreacted shrinking core model (UCSM). The model is capable of capturing the oxidation kinetics of fully or partially reduced oxygen carrier particles. A computational fluid dynamics (CFD) model is developed to simulate the hydrodynamics, heat transfer, and chemical reaction occurring in the CDCL combustor. The model is developed in MFIX and ANSYS Fluent. Key aspects of CDCL combustor operation, including heat transfer, oxygen carrier oxidation, and the transport of oxygen carrier particles, are simulated using this CFD model. The HEN for a commercial scale 550 MWe CDCL power plant is simulated and optimized using ASPEN Plus. Practical design considerations are incorporated based on industrial experiences. The performance and cost for the commercial CDCL plant is updated based on these analyses. A dynamic model for the 10 MWe CDCL pilot plant is developed in ProTRAX simulation software. The model is based on the pilot plant design developed in project DE-FE0027654 “10 MWe CDCL Large Pilot Plang – Pre-FEED Study” and the steam cycle data obtained from Dover Light & Power plant. The transient behaviors during pilot plant load variation are simulated using the dynamic model.

01 COAL, LIGNITE, AND PEAT↗

Carbon Capture Pilot at Vicksburg Containerboard Mill (Final Technical Report)

This is the final technical report for the DOE-OCED project DE-CD0000051. The report provides the progress at the close of the project. The objective of the project is to design and build a large pilot plant for carbon dioxide (CO 2 ) capture from a pulp and paper (P&P) mill using RTI’s non-aqueous solvent (NAS) technology at a capacity of 120,000 t-CO 2 /year, with >90% CO 2 captured. The pilot plant will be used for testing and evaluating the NAS capture process using real flue gas from the P&P mill’s power boiler for a minimum of 1 year of parametric testing and a minimum of 2,000 hours of continuous long-term testing. The testing will provide data for process optimization and scale-up for the P&P industry, provide information on interaction of flue gas contaminants on solvent performance and degradation, and inform strategies for emission control. At the end of the project, the pilot plant will be managed by International Paper (IP), the host site owner, which will continue to capture CO 2 , sequester the captured CO 2 , and be eligible for the 45Q credit.

42 ENGINEERING↗

ERDA's central receiver solar thermal power system studies

The utilization of solar energy for electrical power production was studied. Efforts underway on the central receiver solar thermal power system are presented. Preliminary designs are included of pilot plant utilizing large numbers of heliostats in a collector field. Safety hazards are also discussed, as well as the most beneficial location of such a plant within the United States.

Lippy, L. J.↗

Advanced technology applications for second and third general coal gasification systems

The historical background of coal conversion is reviewed and the programmatic status (operational, construction, design, proposed) of coal gasification processes is tabulated for both commercial and demonstration projects as well as for large and small pilot plants. Both second and third generation processes typically operate at higher temperatures and pressures than first generation methods. Much of the equipment that has been tested has failed. The most difficult problems are in process control. The mechanics of three-phase flow are not fully understood. Companies participating in coal conversion projects are ordering duplicates of failure prone units. No real solutions to any of the significant problems in technology development have been developed in recent years.

Bradford, R.↗

Extraterrestrial resources: Implications from terrestrial experience

Terrestrial mining experience indicates that the overwhelming criterion of a potentially economic deposit is its recoverable concentration of the desired mineral or element. Recovery can be based on contrast in physical and/or chemical properties, but processes based on physical properties are typically less expensive. As several processes generally are used in sequence, they have a profound effect on extraction costs. These criteria will also apply to extraterrestrial resources. Although the extreme cost of access to space makes even ordinary materials extremely valuable, this inaccessibility also makes capital and maintenance costs extremely high. The following four development stages will apply, especially with the additional unknowns of an extraterrestrial environment: (1) Exploration for the highest grade of the mineral or element desired (because the extraction plant must be simple, cheap, and rugged to minimize capital and maintenance costs, high grade is extremely important); (2) Laboratory testing of various physical and/or chemical separation techniques on the possible ore to determine if the material can indeed be recovered economically; (3) a pilot plant test, in which a large sample is dug from the deposit to determine excavation rates, power requirements, and equipment wear. (This sample is then run through a pilot mill designed on the basis of the laboratory testing. Pilot plant testing must be carried out at increasing scales, but several trials are generally necessary at each scale before the size of operations can be increased. Moreover, pilot testing is necessary for each new mineral deposit); and (4) Last is the full-scale mine and plant start-up. (New problems invariably occur at this point, but they can be kept to a minimum if the pilot plant tests were realistic). If such a development plan is followed rigorously, major cost overruns, with their potentially disastrous effects on resource developments, can be avoided.

Kuck, David L.↗

Computer vision-based rock bolt detection in orthomosaic imagery obtained in the Waste Isolation Pilot Plant underground facility

Assessing structural integrity of large underground tunnel facilities is often a time consuming and human-labor intensive task. Thus, research using various modes of sensing and automated detection of key structural components in mines is posed to aid in safety assessments and establishing overall structural health. We propose an approach utilizing off-the-shelf camera and lidar technology fixed to a custom sensing platform, image stitching techniques, fine-tuned object detection models, and specialized model-inference methods to automatically detect, count, and map roof bolts for assessment of structural safety in man-made underground tunnels. Results show a novel workflow for effective object counting in orthomosaic tunnel ceiling images generated from collections in GPS-denied mining environments. Additionally, we demonstrate effective fine-tuning of EfficientDet object detectors utilizing state-of-the-art image augmentation techniques known as the mosaic and mixup transformations. Our work is demonstrated on sensed data and imagery collected from the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) where miles of tunnel ceiling must be assessed for structural integrity.

42 ENGINEERING↗

Start-up and Emergency Shutdown Modeling for a Coal-fired 10MWe sCO₂ Power Plant

As part of a Phase II Front End Engineering Design (FEED) study for the DOE Fossil Fuel Large Scale Pilots program, investigations of novel start-up and emergency shutdown methods for a stoker-fed, coal-fired, 10MWe sCO₂ power plant proposal were performed. These investigations were performed using 1D transient system models of the plant created within the GT-SUITE system modeling platform. The system model components were created using vendor quotation data (heat exchangers), performance maps (turbomachines), or FMU models (fired heater). Previously, Echogen Power Systems (Echogen) has used a sCO₂ power cycle start-up method that fills the system with liquid CO₂ to facilitate easy use of an electrically-driven start pump to transition the system from initial CO₂ fill to turbo-compressor initialization. The novel start-up method presented attempts this transition with a minimal filling of the system with liquid CO₂, to reduce the total CO₂ inventory required. This method leaves the start pump vulnerable to a two phase inlet condition as system pressure is below the CO₂ saturation pressure for the condenser cooling water temperature (Tcw). System model cases at Tcw of 18°C, 26°C, and 32°C, corresponding to cold, design, and hot ambient days, were analyzed to determine if the SP inlet condition could be kept as a subcooled liquid and estimate the CO₂ inventory reduction amount./p> Stoker-fed, coal-fired heaters continue to emit heat for some time even after emergency shutdown from events such as a power failure. This heat emission would lead to a failure of the fired heater, as the metal overheats, if the CO₂ flow is shut off. The emergency shutdown method presented utilizes CO₂ vented by a controllable vent valve (CRV) to provide CO₂ cooling flow to the fired heater. To determine the effectiveness of this method at keeping the fired heater peak tubing metal temperature below the ASME material temperature limit, for pressures below 5 MPa, of 816 °C, system model cases with CRV diameters ranging from 4” to 10”, and an alternative CO₂ vent routing with CRV size of 6”, were investigated./p>

01 COAL, LIGNITE, AND PEAT↗

Status report the SRC-1 and SRC-2 processes

Bench-scale and pilot plant development of solvent refined coal (SRC) processes is reviewed. Large SRC demonstration plants are described. Commercialization of the process is envisioned for the 1980's.

Chenoweth, G. E.↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Synthesis of optically clear polymeric materials for high temperature windows

A polymer has been developed that has excellent potential for use as windows in spacecraft as well as conventional aircraft. This polymer, phenolphthalein polycarbonate, has outstanding thermal properties, e.g., in place of melting or burning, it produces an insulating charred foam that closes off transmission of radiant heat through the window. This fact, coupled with an oxygen index of 0.43 and a 177 C tensile strength of 58 mega Newtons/sq m, makes this polymer a prime candidate for further development. Pilot plant preparation in a 20 gallon Pfaudler kettle was accomplished and large test specimens were prepared for evaluations.

Pannell, C. E.↗

Historical evidence of importance to the industrialization of flat-plate silicon photovoltaic systems. Volume 1: Executive summary

An analysis is given of the Low-Cost Silicon Solar Array Project plans for the industrialization of new production technologies expected to be forthcoming as a result of the project's technology development efforts. In particular, LSSA's mandate to insure an annual production capability of 500 MW peak for the photovoltaic supply industry by 1986 is critically examined. The examination focuses on one of the concerns behind this goal -- timely development of industrial capacity to supply anticipated demand. Some of the conclusions include: (1) construction of small-scale pilot plants should be undertaken only for purposes of technology development; (2) large-scale demonstrations should be undertaken only when the technology is well in hand; (3) commercial-scale production should be left to the private sector; (4) the 500-MW annual output goal should be shifted to Program Headquarters.

Smith, J. L.↗

Photovoltaic research and development in Japan

The status of the Japanese photovoltaic (PV) R&D activities was surveyed through literature searches, private communications, and site visits in 1982. The results show that the Japanese photovoltaic technology is maturing rapidly, consistent with the steady government funding under the Sunshine Project. Two main thrusts of the Project are: (1) completion of the solar panel production pilot plants using cast ingot and sheet silicon materials, and (2) development of large area amorphous silicon solar cells with acceptable efficiency (10 to 12%). An experimental automated solar panel production plant rated at 500 kW/yr is currently under construction for the Sunshine Project for completion in March 1983. Efficiencies demonstrated by experimental large are amorphous silicon solar cells are approaching 8%. Small area amorphous silicon solar cells are, however, currently being mass produced and marketed by several companies at an equivalent annual rate of 2 MW/yr for consumer electronic applications. There is no evidence of an immediate move by the Japanese PV industry to enter extensively into the photovoltaic power market, domestic or otherwise. However, the photovoltaic technology itself could become ready for such an entry in the very near future, especially by making use of advanced process automation technologies.

Shimada, K.↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗