Search NASA⌕ Search

SEARCH · Search NASA

Results for “large scale cargo”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

100 kW Nested Hall Thruster System Development

Large scale cargo transportation to support human missions to the Moon and Mars will require very high power Solar Electric Propulsion (SEP) systems operating between 200 and 400 kW. Aerojet Rocketdyne's NextSTEP program is developing and demonstrating a 100 kW EP system, the XR-100, using a Nested Hall Thruster (NHT) designed for powers up to 200 kW, a modular power processor and a modular flow controller. The three year program objective is to operate the integrated EP system continuously at 100 kW for 100 h, advancing this very high power Electric Propulsion (EP) system to Technology Readiness Level (TRL) 5. With our University of Michigan, Jet Propulsion Laboratory and NASA Glenn Research Center teammates, Aerojet Rocketdyne has completed the initial phase of the program, including operating the thruster at up to 30 kW to validate the thermal models and developing and operating multiple power processor modules in the required seriesparallel configuration. The current phase includes completing a TRL 4 integrated system test at reduced power to validate all system operating phases. Design upgrades to demonstrate the TRL 5 capabilities are underway. This paper will present the high power XR-100 capabilities, overall program and design approach and the latest test results for the 100 kW EP system demonstration program.

Jackson, Jerry↗

Power Processing and Flow Control for a 100 kW Hall Thruster System

Aerojet Rocketdyne's NextSTEP program is developing and demonstrating a 100 kW Electric Propulsion (EP) system, the XR-100, which includes a modular power processing unit and modular xenon feed system to operate a Nested Hall Thruster (NHT) designed for powers up to 200 kW. The NextSTEP system is intended for use on large scale cargo transportation to support human missions to the Moon and Mars, which require very high-power Solar Electric Propulsion (SEP) systems operating between 200 and 400 kW. The three-year program objective is to operate the integrated EP system continuously at 100 kW for 100 hours, advancing this very high-power EP system to Technology Readiness Level (TRL) 5. In order to process the power and control propellant flow for this high-power system, Aerojet Rocketdyne has developed a modular concept for the Power Processing Units (PPUs) and Xenon feed system. The program has completed testing of critical elements of the PPU and feed system with a thruster simulator. Design upgrades to demonstrate the TRL 5 capabilities are underway. This paper will present an overview of the program and system design approach, the high power XR-100 capabilities of the PPU and feed system, and the latest test results for the 100 kW EP system demonstration program. In order to successfully execute this contract, there is a close collaboration between the teammates at Aerojet Rocketdyne (AR), the University of Michigan (UM), the NASA Jet Propulsion Laboratory (JPL), and the NASA Glenn Research Center (GRC).

Soendker, Erich↗

Power Processing and Flow Control for a 100 kW Hall Thruster System

Aerojet Rocketdyne's NextSTEP program is developing and demonstrating a 100 kW Electric Propulsion (EP) system, the XR-100, which includes a modular power processing unit and modular xenon feed system to operate a Nested Hall Thruster (NHT) designed for powers up to 200 kW. The NextSTEP system is intended for use on large scale cargo transportation to support human missions to the Moon and Mars, which require very high-power Solar Electric Propulsion (SEP) systems operating between 200 and 400 kW. The three-year program objective is to operate the integrated EP system continuously at 100 kW for 100 hours, advancing this very high-power EP system to Technology Readiness Level (TRL) 5. In order to process the power and control propellant flow for this high-power system, Aerojet Rocketdyne has developed a modular concept for the Power Processing Units (PPUs) and Xenon feed system. The program has completed testing of critical elements of the PPU and feed system with a thruster simulator. Design upgrades to demonstrate the TRL 5 capabilities are underway. This paper will present an overview of the program and system design approach, the high power XR-100 capabilities of the PPU and feed system, and the latest test results for the 100 kW EP system demonstration program. In order to successfully execute this contract, there is a close collaboration between the teammates at Aerojet Rocketdyne (AR), the University of Michigan (UM), the NASA Jet Propulsion Laboratory (JPL), and the NASA Glenn Research Center (GRC).

Hablitzel, Sam↗

Fire safety evaluation of aircraft lavatory and cargo compartments

Large-scale aircraft lavatory and cargo compartment fire tests are described. Tests were conducted to evaluate the effectiveness of these compartments to contain fire and smoke. Two tests were conducted and are detailed. Test 1 involved a production Boeing 747 lavatory of the latest design installed in an enclosure outside the aircraft, to collect gases and expose animals to these gases. Results indicate that the interior of the lavatory was completely burned, evolving smoke and combustion products in the enclosure. Test 2 involved a simulated Douglas DC-10 cargo compartment retro-fitted with standard fiberglass liner. The fire caused excessive damage to the liner and burned through the ceiling in two areas. Test objectives, methods, materials, and results are presented and discussed.

Kourtides, D. A.↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100hrs to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne (AR) is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

Development of High Power Hall Thruster Systems to Enable the NASA Exploration Vision

The next phase of space exploration missions requires high power Solar Electric Propulsion (SEP) systems for large-scale science missions and cargo transportation. Development is underway at Aerojet Rocketdyne on Hall thruster systems that are intended to bracket the needs of future NASA SEP missions in support of space exploration. The Advanced Electric Propulsion System (AEPS) program is developing and qualifying a 13.3kW Hall thruster system to be demonstrated on the Power and Propulsion Element (PPE), which is intended to be the first element of a Lunar Outpost Platform - Gateway (LOP-G). The NextSTEP program is integrating a nested Hall thruster into a 100 kW system and testing it for 100 hours. These two programs will provide a path to efficient in-space propulsion that will allow NASA to transfer the large amounts of cargo that is needed to support human missions - first to the moon and then on to Mars. The Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS system includes a magnetically shielded long-life Hall thruster, Power Processing Unit (PPU) and a Xenon Flow Controller (XFC). The Hall thruster, developed and demonstrated by NASA, operates at input powers up to 12.5 kW while providing a specific impulse over an estimated 2800s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95-140V, consistent with operation beyond the orbit of Mars. The integrated system input power is continuously throttleable between 3 and 13.3kW. Component level testing of the EP String has begun with prototype hardware. The NextSTEP program is developing a 100kW Electric Propulsion (EP) system using a nested Hall thruster designed for powers up to 250kW, a modular power processor and a modular mass flow controller. While the program objective is to operate the integrated EP system continuously at 100kW for 100 hours to demonstrate thermal stability and support the development of system life time models, it builds on decades of experience with long-life Hall thrusters and the design is evolvable to a capability of 250kW. Design upgrades that demonstrate the 100kW EP system have been completed and tested. Aerojet Rocketdyne is excited to support NASA as it extends human reach into deep space and believes that these programs will provide the propulsion to make such missions affordable and sustainable. These systems provide NASA with a range of options to power its deep space transport vehicles. This paper presents the mission requirements for supporting the NASA exploration vision, as well as the status for the high power Hall thruster systems in development.

Jackson, Jerry↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions is enhanced by high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdynes Advanced Electric Propulsion System (AEPS) program is completing development, qualification and delivery of five flight 13.3kW EP systems to NASA. The flight AEPS includes a magnetically-shielded, long-life Hall thruster, power processing unit (PPU), xenon flow controller (XFC), and intrasystem harnesses. The Hall thruster, originally developed and demonstrated by NASAs Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 12.5kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed the system requirement review; the system, thruster, PPU and XFC preliminary design reviews; development of engineering models, and initial system integration testing. This paper will present the high power AEPS capabilities, overall program and design status and the latest test results for the 13.3kW flight system development and qualification program.

Jackson, Jerry↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

13kW Advanced Electric Propulsion Flight System Development and Qualification

The next phase of robotic and human deep space exploration missions requires high performance, high power solar electric propulsion systems for large-scale science missions and cargo transportation. Aerojet Rocketdyne's Advanced Electric Propulsion System (AEPS) program is completing development and qualification of a 13kW flight EP system to support NASA exploration. The first use of the AEPS is planned for the NASA Power & Propulsion Element, which is the first element of NASA's cis-lunar Gateway. The flight AEPS system includes a magnetically shielded long-life Hall thruster, power processing unit (PPU), and xenon flow controller (XFC). The Hall thruster, originally developed and demonstrated by NASA's Glenn Research Center and the Jet Propulsion Laboratory, operates at input powers up to 13.3kW while providing a specific impulse over 2600s at an input voltage of 600V. The power processor is designed to accommodate an input voltage range of 95 to 140V, consistent with operation beyond the orbit of Mars. The integrated system is continuously throttleable between 3 and 13.3kW. The program has completed testing of the Technology Development Units and is progressing into the Engineering Development Unit test phase and the final design phase to Critical Design Review (CDR). This paper will present the high power AEPS system capabilities, overall program and design status and the latest test results for the 13kW flight system development as well as the plans for the development and qualification effort of the EP string.

in-space propulsion↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Development of a Portable Oxygen Monitoring System for Operations in the International Space Station Airlock

NASA is currently engaged in an activity to facilitate effective operations on the International Space Station (ISS) after the Space Shuttle retires. Currently, the Space Shuttle delivers crew and cargo to and from ISS. The Space Shuttle provides the only large scale method of hardware return from ISS to the ground. Hardware that needs to be periodically repaired, refurbished, or recalibrated must come back from ISS on the Shuttle. One example of NASA flight hardware that is used on ISS and refurbished on the ground is the Compound Specific Analyzer for Oxygen (CSA-O2). The CSA-O2 is an electrochemical sensor that is used on orbit for about 12 months (depending on Shuttle launch schedules), then returned to the ground for sensor replacement. The shuttle is scheduled to retire in 2010, and the ISS is scheduled to operate until 2016. NASA needs a hand held sensor that measures oxygen in the ISS environment and has a 5-10 year service life. After conducting a survey of oxygen sensor systems, NASA selected a Tunable Diode Laser Absorption Spectrometer (TDLAS) as the method of measurement that best addresses the needs for ISS. These systems are compact, meet ISS accuracy requirements, and because they use spectroscopic techniques, the sensors are not consumed or altered after making a measurement. TDLAS systems have service life ratings of 5-10 years, based on the lifetime of the laser. NASA is engaged in modifying a commercially available sensor, the Vaisala OMT 355, for the ISS application. The Vaisala OMT 355 requires three significant modifications to meet ISS needs. The commercial sensor uses a wall mount power supply, and the ISS sensor needs to use a rechargeable battery as its source of power. The commercial sensor has a pressure correction setpoint: the sensor can be adjusted to operate at reduced pressure conditions, but the sensor does not self correct dynamically and automatically. The ISS sensor needs to operate in the airlock, and make accurate measurements in an environment that can change from 14.7 psia to 10.2 psia in 15 minutes. The commercial sensor needs to be repackaged into a configuration that is more compact, and better suited for ISS airlock operations. NASA has recently completed a prototype of the reconfigured system. The unit has been repackaged in a way that the optical path of the spectrometer is unchanged, but the electronics has been integrated into a case measuring 10.7 X 7.2 X 3.0 inches. Two flight qualified rechargeable batteries have been integrated into system. The batteries can power the sensor for 10 hours on a single charge. A pressure sensor has been added to the system. The modified unit automatically compensates for changes in pressure, and meets 0.2% accuracy requirements for oxygen measurements in an environment with 18 to 32% oxygen across a pressure range of 10.0 to 15.0 psia.

Graf, John↗

Share the Sky: Concepts and Technologies That Will Shape Future Airspace Use

The airspace challenge for the United States is to protect national sovereignty and ensure the safety and security of those on the ground and in the air, while at the same time ensuring the efficiency of flight, reducing the costs involved, protecting the environment, and protecting the freedom of access to the airspace. Many visions of the future NAS hold a relatively near-term perspective, focusing on existing uses of the airspace and assuming that new uses will make up a small fraction of total use. In the longer term, the skies will be filled with diverse and amazing new air vehicles filling our societal needs. Anticipated new vehicles include autonomous air vehicles acting both independently and in coordinated groups, unpiloted cargo carriers, and large numbers of personal air vehicles and small-scale point-to-point transports. These vehicles will enable new capabilities that have the potential to increase societal mobility, transport freight at lower cost and with lower environmental impact, improve the study of the Earth s atmosphere and ecosystem, and increase societal safety and security by improving or drastically lowering the cost of critical services such as firefighting, emergency medical evacuation, search and rescue, border and neighborhood surveillance, and the inspection of our infrastructure. To ensure that uses of the airspace can continue to grow for the benefit of all, a new paradigm for operations is needed: equitably and safely sharing the airspace. This paper is an examination of such a vision, concentrating on the operations of all types of air vehicles and future uses of the National Airspace. Attributes of a long-term future airspace system are provided, emerging operations technologies are described, and initial steps in research and development are recommended.

Ballin, Mark G.↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Allosterically coupled conformational dynamics in solution prepare the sterol transfer protein StarD4 to release its cargo upon interaction with target membranes

Complex mechanisms regulate the cellular distribution of cholesterol, a critical component of eukaryote membranes involved in regulation of membrane protein functions directly and through the physiochemical properties of membranes. StarD4, a member of the steroidogenic acute regulator-related lipid-transfer (StART) domain (StARD)-containing protein family, is a highly efficient sterol-specific transfer protein involved in cholesterol homeostasis. Its mechanism of cargo loading and release remains unknown despite recent insights into the key role of phosphatidylinositol phosphates in modulating its interactions with target membranes. We have used large-scale atomistic Molecular dynamics (MD) simulations to study how the dynamics of cholesterol bound to the StarD4 protein can affect interaction with target membranes, and cargo delivery. We identify the two major cholesterol (CHL) binding modes in the hydrophobic pocket of StarD4, one near S136&S147 (the Ser-mode), and another closer to the putative release gate located near W171, R92&Y117 (the Trp-mode). We show that conformational changes of StarD4 associated directly with the transition between these binding modes facilitate the opening of the gate. To understand the dynamics of this connection we apply a machine-learning algorithm for the detection of rare events in MD trajectories (RED), which reveals the structural motifs involved in the opening of a front gate and a back corridor in the StarD4 structure occurring together with the spontaneous transition of CHL from the Ser-mode of binding to the Trp-mode. Further analysis of MD trajectory data with the information-theory based NbIT method reveals the allosteric network connecting the CHL binding site to the functionally important structural components of the gate and corridor. Mutations of residues in the allosteric network are shown to affect the performance of the allosteric connection. These findings outline an allosteric mechanism which prepares the CHL-bound StarD4 to release and deliver the cargo when it is bound to the target membrane.

59 BASIC BIOLOGICAL SCIENCES↗

Effects of a military cargo pod and tail fins on the aerodynamic characteristics of a large wide-body transport model

Wind tunnel tests were conducted on a 0.03 scale model of a large wide-body commercial aircraft to determine the effects on the static aerodynamic characteristics resulting from the attachment of a belly pod for the long-range deployment of outsize military equipment. The effectiveness of horizontal-tip fins in augmenting directional stability was investigated. At a test Reynolds number of 1.08 x 1,000,000, the addition of the pod results in an increase in total drag of approximately 20 percent. Trim drag due to the pod is very small. Although the pod produces a significant decrease in directional stability, the addition of the tip fins restores some of the stability, particularly at the lower angles of attack.

Jernell, L. S.↗

Chaotrope-Based Approach for Rapid In Vitro Assembly and Loading of Bacterial Microcompartment Shells

Bacterial microcompartments (BMCs) are proteinaceous organelles that self-assemble into selectively permeable shells that encapsulate enzymatic cargo. BMCs enhance catalytic pathways by reducing crosstalk among metabolites, preventing harmful intermediates from leaking into the cytosol and increasing reaction efficiency via enzyme colocalization. The intrinsic properties of BMCs make them attractive for biotechnological engineering. However, in vivo expression methods for shell synthesis have significant drawbacks that limit the potential design space for these nanocompartments. Here, we describe the development of an efficient and rapid method for the in vitro assembly of BMC shells from their protein building blocks. Our method enables large-scale construction of BMC shells by utilizing urea as a chaotropic agent to control self-assembly and provides an approach for encapsulation of both biotic and abiotic cargo under a broad range of reaction conditions. We demonstrate an enhanced level of control over the assembly of BMC shells in vitro and expand the design parameter space for engineering BMC systems with specialized and enhanced catalytic properties.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Hardware Systems and EDU Demonstration of the Tall Lunar Tower Project

The Tall Lunar Tower (TLT) project developed a robotic tower assembly system (RTAS) and TLT Truss engineering development units (EDUs) to perform a ground demonstration of supervised semi-autonomous robotic assembly of a truss-based tall tower. Truss structures provide exceptional strength-to-weight ratios for payload capabilities supporting large masses. On the lunar surface, tall towers are a critical structural system that will enable significant solar power generation by supporting vertical solar arrays and beyond-the-horizon communications at the lunar south pole, supporting the Artemis mission architecture, as well as a lunar economy. Tall towers, greater than 30-meters-tall, provide the elevation needed for more consistent solar power generation due to low inclination sunlight and deep shadowing from surface features on the lunar surface at the poles. The robotic structural assembly technologies developed for truss-based tall towers will also enable other large-scale functional lunar structures to be built, including launch plume deflectors, lunar safe havens for astronauts and assets, surface transportation for cargo, and other critical infrastructure. Robotic assembly of truss structures for lunar surface infrastructure is near-term enabling for future Artemis mission campaign and Moon to Mars Objectives needs for power and communication. The project team designed, fabricated, tested, and demonstrated the RTAS EDU by assembling a TLT Truss EDU in a laboratory environment. The hardware systems and the supervised semi-autonomous assembly process for a TLT assembled EDU design, along with descriptions of a hardware demonstration are presented.

In-space Assembly↗