Search NASASearch

SEARCH · Search NASA

Results for “launch vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Launch Vehicle Implications for Mars Exploration

The objectives of this paper are to give a brief insight into the launch vehicle implications for a manned Mars expedition and follow-on exploration; and secondly, to show the effects of such a mission requirement on the launch vehicle system. Due to the complexity and intricacy of the overall mission, vehicle system, and their interrelationships, only the very broad and salient points will be discussed.

F L Williams

Minimum Heating Re-Entry Trajectories for Advanced Hypersonic Launch Vehicles

Optimal re-entry trajectories are generated for reusable launch vehicles which minimize: (1) the heat absorbed at the vehicle surface, (2) the lower surface temperature, and (3) the heat absorbed by the internal structure. The approach uses the energy state approximation technique and a finite control volume heat transfer code coupled to a flight path integration code. These trajectories are compared to the optimal re-entry trajectory minimizing the integrated convective heat rate to determine which trajectory produces the minimum internal structural temperatures for a given thermal protection system. Three different thermal protection systems are considered: tile, blanket, and metallic.

Robert Windhorst

NASA Space Launch System Artemis I & II Post Flight Ascent Aerothermal Environments Overview

Since 2011 the Aerosciences Branch/EV33 at NASA Marshall Space Flight Center has been involved with the development of ascent external aerothermal environments for the NASA Space Launch System (SLS) Block 1 launch vehicle for the purposes of supporting thermal analysis and the design of thermal protection systems. The SLS Block 1 Artemis I and II launch vehicles successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022 and April 1st, 2026, respectively. Over 70 aerothermal islands, consisting of over 265 operational instruments captured aerodynamic heating and plume induced environments throughout the launch vehicles. Gauges consisted of calorimeters, radiometers, gas temperature probes, pressure transducers, bi-directional pressure probes and thermocouples. Prior to launch, aerothermal design environment models were generated to predict ascent aerodynamic heating and plume induced environments over a design space that covered a range of vehicle trajectories that varied atmospheric, vehicle performance, and off-nominal, engine-out conditions. Post flight reconstruction models were developed for each flight island using the Day-of-Launch (DOL) Best Equivalent Trajectory (BET) that provided freestream conditions and propulsion system boundary conditions. This paper discusses a summary of the ascent aerothermal environments observed during the flights and the respective modelling approaches and the performance of them through comparisons of flight data and predictions.

aerothermodynamics

Advanced Composite Structures and Materials Technologies for Launch Vehicles

The NASA's Advanced Composites Technologies (ACT) Project has the potential to develop composite materials and structures technologies for the largest composite aerospace structures ever made. The objective the ACT Project of is to develop mid-technology readiness level (TRL) composite materials and structures technologies to TRL 6 for specific heavy lift Ares V launch vehicle and Altair lunar lander applications. To accomplish this objective, the ACT Project has four major technical elements: materials and manufacturing; structural concepts development and assessment of lightweight components; testing and evaluation; and highly loaded composite struts. The Project uses capabilities from across NASA to form multi-disciplinary, cross-center teams to meet the milestones of these technical elements. This presentation will describe the activities and plans for the ACT Project. Studies from the first execution year of the project will be summarized including results from materials selection and structural concept evaluation studies. Plans for continuing activities include studies for nondestructive evaluation/structural health monitoring, damage tolerance, joints, and material and structural testing, and these studies will be described. A major emphasis this fiscal year is the start of work for a manufacturing demonstration barrel. This structure will be composed of six, 5-m-diameter, 3-m-long curved panels that when assembled, result in a 10-m-diameter barrel. Activities related to the development of this structure will also be described.

Mark J Shuart

Artemis I Space Launch System Base Heat Shield Thermal Protection System Performance

The Space Launch System (SLS) Core Stage base heat shield experienced the highest external heating environments on the entire launch vehicle during Artemis I ascent flight. This result was consistent with design predictions. The base heat shield experiences P50 cork combustion dynamics at low altitudes, plume-induced recirculation at moderate altitudes and then in-space base flow physics out to Main Engine Cut-Off (MECO). The base heat shield thermal protection system (TPS) is composed of a P50 cork ablator which is bonded to a substrate. The heat shield protects the gimbal actuation system, RS-25 turbomachinery systems and other aft section sensitive components during ascent. This paper estimates the base heat shield TPS performance from Artemis I using flight data from the NASA Langley Research Center’s Scientifically Calibrated In-Flight Imagery (SCIFLI) Airborne Multispectral Imager (SAMI), development flight instrumentation (DFI) and other TPS recession flight measurements. Predictions from computational and ground test-derived engineering ablation models and observations are also applied. Since no base heat shield substrate thermocouple data were obtained for Artemis I, an estimate of the TPS performance data is derived here. This data assesses thermal margin of the SLS Core Stage base heat shield and best informs the Artemis II Crewed mission to the moon.

aerothermodynamics

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

Parameterization of Nuclear Electric Propulsion Trajectories for Outer Solar System Science Missions Methodology

This manuscript addresses the methodology used to create a database of low thrust missions to outer planets. This database utilizes previous work modeling NEP systems to determine the maximum delivered mass to outer planets based on a range of mission parameters, such as time of flight, launch vehicle, and power system mass. Trajectories were selected which best utilized NEP benefits. Additionally, a discussion on the database outputs for missions to Saturn is included, such as time of flight based on trajectory type and maximum payload, given a specific launch vehicle. The purpose of this work was to create a basis for future mission design, and a tool to investigate general trends across mission options.

Outer Planets

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

David Hitt

Artemis CubeSats Help Advance Exploration of the Moon, Mars, and Beyond

On April 1, NASA launched the Artemis II mission – the first crewed mission of the Artemis campaign. The nine-day lunar flyby launched on the agency’s SLS (Space Launch System) rocket and had four astronauts test the Orion spacecraft in high Earth orbit and in deep space. Four 12U CubeSats also launched on the mission, housed within the SLS’s Orion stage adapter (OSA). The spacecraft were deployed approximately five-and-a-half hours into the flight, following Orion separation and departure from SLS, as the SLS interim cryogenic propulsion stage (ICPS) and the attached OSA were in a high Earth orbit on an atmospheric disposal trajectory. All four CubeSats were successfully deployed from the launch vehicle. Deployment statuses of the spacecraft, along with updates about the SLS rocket and Artemis missions, are reported in this paper. The paper will also discuss opportunities for CubeSat payloads on future Artemis missions.

Russell Lane

Terrestrial Environment (Climatic) Criteria Guidelines for Use in Aerospace Vehicle Development, 1973 Revision

This document provides guidelines on probable climatic extremes and probabilities-of-occurrence of terrestrial environment data specifically applicable for NASA space vehicles and associated equipment development. The geographic areas encompassed are The Eastern Test Range (Cape Kennedy, Florida); Huntsville, Alabama; New Orleans, Louisiana; The Space and Missile Test Center (Vandenberg AFB California); Sacramento, California; Wallops Test Range (Wallops Island, Virginia); White Sands Missile Range, New Mexico; and intermediate transportation areas. In addition, sections have been included to provide information on the general distribution of natural environment extremes in the United States (excluding Alaska and Hawaii), cloud cover, and some worldwide climatic extremes. Although all these areas are covered, the major emphasis is given to the Kennedy Space Center launch area and Vandenburg Air Force Base due to importance in NASA's future large space vehicle programs. This document presents the latest available information on probable climatic extremes, and supersedes information presented in TM X-64589. The information in this document is recommended for employment in the development of space vehicles and associated equipment design and operational criteria, unless otherwise stated in contract work specifications.

cloud cover

Modular Assembled Radiators for Nuclear Electric Propulsion (NEP) VehicLes (MARVL) Project Thermal Technology Development

Nuclear Electric Propulsion (NEP) has been considered for crew and cargo class missions to Mars for more than six decades. The Primary Heat Rejection Subsystem (PHRS) of an NEP vehicle expels the megawatts of waste heat generated by the Power Conversion Subsystem (PCS). In previous studies, integrating the majority of the NEP vehicle within a single launch fairing required the use of complex deployable elements and resulted in reduced PCS efficiency. To achieve the necessary radiating area, past design studies have utilized massive multi-wing folding radiators resulting in conceptual PHRS designs that have been widely acknowledged as non-optimal. The Modular Assembled Radiators for NEP VehicLes (MARVL) project is incorporating in-Space Assembly (iSA) into the design process to realize lightweight, modular, and more capable PHRS radiators. Since the project’s Authority to Proceed (ATP) date of October 2024, the project team has been developing a modular design for the PHRS radiators that will be suitable for both the Mars mission environments and iSA commissioning operations. This document captures the current progress of the incremental technology development for the thermal components of the MARVL System of Interest (SOI).

Modular Radiator

Crewed Space Vehicle Battery Safety Requirements

This requirements document is applicable to all batteries on crewed spacecraft, including vehicle, payload, and crew equipment batteries. It defines the specific provisions required to design a battery that is safe for ground personnel and crew members to handle and/or operate during all applicable phases of crewed missions, safe for use in the enclosed environment of a crewed space vehicle, and safe for use in launch vehicles, as well as in unpressurized spaces adjacent to the habitable portion of a space vehicle. The required provisions encompass hazard controls, design evaluation, and verification. The extent of the hazard controls and verification required depends on the applicability and credibility of the hazard to the specific battery design and applicable missions under review. Evaluation of the design and verification program results shall be completed prior to certification for flight and ground operations. This requirements document is geared toward the designers of battery systems to be used in crewed vehicles, crew equipment, crew suits, or batteries to be used in crewed vehicle systems and payloads (or experiments). This requirements document also applies to ground handling and testing of flight batteries. Specific design and verification requirements for a battery are dependent upon the battery chemistry, capacity, complexity, charging, environment, and application. The variety of battery chemistries available, combined with the variety of battery-powered applications, results in each battery application having specific, unique requirements pertinent to the specific battery application. However, there are basic requirements for all battery designs and applications, which are listed in section 4. Section 5 includes a description of hazards and controls and also includes requirements.

Jeevarajan, Judith A.

Uranus Orbiter and Probe: Mission Challenges and Concept Updates Since the Origins, Worlds, and Life Decadal Survey

Origins, Worlds, and Life: Planetary Science and Astrobiology in the Next Decade identified a Uranus Orbiter and Probe as the highest-priority strategic mission for the decade 2023–2032, as it enables broad cross-disciplinary science in the largely unexplored Uranian system. The mission architecture evaluated by the Decadal Survey was a singular proof of concept demonstrating that a moderately instrumented mission could deliver Decadal-priority science with a reduced cost and risk posture by leveraging existing technologies to the maximum extent possible. With revised assumptions since the Decadal, we have explored a large trade space including launch vehicles, propulsion options, cruise trajectories, available power sources, viable concept of operations, and science data return for later launch dates without a Jupiter gravity assist. The most repeatable trajectory solutions employ either a commercially derived solar electric propulsion (SEP) transfer stage or the availability of a more capable launch vehicle under development, such as the SpaceX Starship. Orbit insertion has been moved farther from Uranus to acknowledge the remaining uncertainty in Uranian ring structure. A streamlined, SEP-adaptable, orbiter design was developed using two Next Gen Radioisotope Thermoelectric Generators, and the probe design was matured, reducing the entry gravitational acceleration, and assuming the largest Decadal-recommended payload to provide margin for future instrument selections. With this updated design, we also constructed a detailed concept of operations for three representative science cases, returning 13–15 Gbit of science data and spacecraft telemetry per ∼34 day orbit.

Amy A Simon

The In-Orbit Battery Reconditioning Experience On Board the Orion 1 Spacecraft

The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.

Hoover, S. A.