Search NASA⌕ Search

SEARCH · Search NASA

Results for “legacy systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Transparent Translation from Legacy System Model into Common Information Model

Advances in the smart grid are forcing utilities toward better monitoring, control, and analysis of distribution systems, and require extensive cyber-based, intelligent systems and applications to realize various functionalities. The ability of systems, or components within systems, to interact and exchange services or information with each other is the key to the success of smart grid technologies, and it requires efficient information exchanging and data sharing infrastructure. The Common Information Model (CIM) is a standard that allows different applications to exchange information about an electrical system, and it has become a widely accepted solution for information exchange among different platforms and applications. However, most existing legacy systems were developed using their own languages rather than CIM. Integrating such legacy systems is a challenge for utilities, and the appropriate use of the integrated legacy systems is even more intricate. Thus, this paper describes an approach and open-source tool developed to translate legacy system models into CIM format. The developed tool was tested for a commercial distribution management system and simulation results have proved its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Transparent Translation from Legacy System Model into Common Information Model: Preprint

Advance in smart grid is forcing utilities towards better monitoring, control and analysis of distribution systems, and requires extensive cyber-based intelligent systems and applications to realize various functionalities. The ability of systems, or components within systems, to interact and exchange services or information with each other is the key to the success of smart grid technologies, and it requires efficient information exchanging and data sharing infrastructure. The Common Information Model (CIM) is a standard that allows different applications to exchange information about an electrical system, and it has become a widely accepted solution for information exchange among different platforms and applications. However, most existing legacy systems are not developed using CIM, but using their own languages. Integrating such legacy systems is a challenge for utilities, and the appropriate utilization of the integrated legacy systems is even more intricate. Thus, this paper has developed an approach and open-source tool in order to translate legacy system models into CIM format. The developed tool is tested for a commercial distribution management system and simulation results have proved its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Challenges of Transitioning Obsolete Legacy Systems to Decommissioning in NRU - 19047

The National Research Universal (NRU) Reactor permanently shut down on March 31, 2018 after over 60 years of service. The NRU reactor and its ancillary buildings are now being readied for decommissioning. The preparation for decommissioning will begin with the deactivation of NRU systems and the ancillary buildings. The focus of this paper will be to document some of the experiences of deactivating the Effluent Heat Recovery System (EHRS) and Building 440 which houses the Emergency Cooling Water Supply system for NRU. Both the EHRS and Building 440 are legacy and obsolete. The deactivation of the EHRS and Building 440 encountered a number of operational challenges such as lapses in maintenance and housekeeping, loss of motivation, and issues with work plans. Organizational challenges, lack of knowledge and expertise, lack of support, and conflicting intra-organizational priorities, are believed to influence the operational challenges. The impact of challenges encountered on the project is reviewed with an emphasis on Project Management and people. 'Lessons learned' based on the experiences of the authors is provided detailing, amongst other things, the importance of people in the success of deactivating the NRU reactor and its ancillary buildings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation Waste Tracking: Linking Legacy Systems with Modern Networking Technologies

This report describes results from a preliminary analysis to satisfy the Department of Energy (DOE) objective to ensure the safe, secure, efficient packaging and transportation of materials both hazardous and non hazardous [1, 2]. The DOE Office of Environmental Management (OEM) through Oak Ridge National Laboratory (ORNL) has embarked on a project to further this objective. OEM and ORNL have agreed to develop, demonstrate and make available modern day cost effective technologies for characterization, identification, tracking, monitoring and disposal of radioactive waste when transported by, or between, motor, air, rail, and water modes. During the past 8 years ORNL has investigated and deployed Web 2.0 compliant sensors into the transportation segment of the supply chain. ORNL has recently demonstrated operational experience with DOE Oak Ridge Operations Office (ORO) and others in national test beds and applications within this domain of the supply chain. Furthermore, in addition to DOE, these hazardous materials supply chain partners included Federal and State enforcement agencies, international ports, and commercial sector shipping operations in a hazardous/radioactive materials tracking and monitoring program called IntelligentFreight. IntelligentFreight is an ORNL initiative encompassing 5 years of research effort associated with the supply chain. The ongoing ORNL SmartFreight programs include RadSTraM [3], GRadSTraM , Trusted Corridors, SensorPedia [4], SensorNet, Southeastern Transportation Corridor Pilot (SETCP) and Trade Data Exchange [5]. The integration of multiple technologies aimed at safer more secure conveyance has been investigated with the core research question being focused on testing distinctly different distributed supply chain information sharing systems. ORNL with support from ORO have demonstrated capabilities when transporting Environmental Management (EM) waste materials for disposal over an onsite haul road. ORNL has unified the operations of existing legacy hazardous, radioactive and related informational databases and systems using emerging Web 2.0 technologies. These capabilities were used to interoperate ORNL s waste generating, packaging, transportation and disposal with other DOE ORO waste management contractors. Importantly, the DOE EM objectives were accomplished in a cost effective manner without altering existing information systems. A path forward is to demonstrate and share these technologies with DOE EM, contractors and stakeholders. This approach will not alter existing DOE assets, i.e. Automated Traffic Management Systems (ATMS), Transportation Tracking and Communications System (TRANSCOM), the Argonne National Laboratory (ANL) demonstrated package tracking system, etc

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EVSE Cybersecurity and Resilience

Consequence-driven Cybersecurity Analysis for Extreme Fast Charging Electric Vehicle Infrastructure Electric vehicle (EV) development and associated charging infrastructure are expected to advance rapidly. Thirty percent of all global vehicle sales may be EVs and hybrid EVs by 2025, and they will rely on increasingly sophisticated strategies for grid integration. Next-generation EV charging infrastructure is expected to include interconnected renewable resources, such as photovoltaic (PV) arrays and battery storage systems, along with grid-edge devices. Although distributed energy resources (DERs) are useful in several ways, such as peak shaving at high demand times and backup supply for added resilience, the integration of vehicle charging and DERs could create more avenues for cyberattack. Physical and/or remote access to EV charging station components, including charge ports, power electronics, controllers, and local generation (e.g., PV and energy storage) could be paths to cause power fluctuations, leading to altered operations at the charging station, escalated privileges to administrative systems, exfiltration of financial information (including personally identifiable information), and reduced grid stability. One compromised EV supply equipment component can open the door to a variety of exploitable vulnerabilities. Cloud computing and mobile application control have the potential to expand the threat surface to non-repudiation and firmware integrity challenges. Vendor clouds have access to hundreds of chargers, and if compromised, can scale the attack surface exponentially. The high power and voltage levels of xFC infrastructure (e.g., 400 kW at 1000- V DC) increase the hazards and ability to impact the grid and vehicles more than lower-power charging systems. Legacy communications systems and protocols could also put EV infrastructure at risk of cyberattacks requiring a robust patch management process. Communications networks link EVs and chargers to several stakeholders - including charging station operators, grid operators, vendors/manufacturers, and aggregators - who have both physical and network access to share information for control, monitoring, and analytics. Information in these networks that is vulnerable to compromise includes the state of charge, charging duration, payment information, electricity price, and load control. Analyzing and prioritizing these interconnections risks could help address cybersecurity related to data leakage and manipulation.

charging↗

Lifetime extension of legacy CEBAF LLRF hardware

A significant portion of the Low-Level Radio Frequency (LLRF) hardware in Jefferson Lab’s CEBAF is from the original construction of the facility using 1980’s CAMAC technology. Of the fifty-three zones in CEBAF, thirty-six of them are legacy hardware. The age of the legacy system has led to difficulties in maintaining the hardware due to parts going obsolete without suitable drop in replacements. Continued operation of the legacy system is required as the installation of LLRF 3.0 systems is costly and cannot be completed in a short period of time with the available resources. The most pressing failure in the legacy system was a failing buffer card, which is responsible for communication between the EPICs network and individual RF control modules. A new buffer card was designed as a transparent, drop in, replacement so that upgrades are simply a matter of swapping the existing legacy hardware. This buffer card upgrades a single point failure component and promises to extend the operable lifetime of CEBAF’s legacy systems.

Accelerator Physics↗

Trust-but-Verify in Cyber-Physical Systems

Cyber-physical systems span a wide spectrum, from long-lived legacy systems to more modern installations. Trust is an issue that arises across the spectrum, albeit with different variants of goals and constraints. On the one end of the spectrum, legacy systems are characterized by function-based designs in which trust is an implicitly in-built concept -- the operation is historically designed, implemented, and optimized in a benign stance with respect to intended use. On the other end of the spectrum, modern systems are characterized by offerings from manufacturers, vendors, and system installers -- the devices and deployments use a variety of security features that offer promises of increased trust. All along this spectrum of cyber-physical systems, extending trust beyond the traditional cyber portions to the arteries that connect the physical portions to the cyber portions is a major challenge. Here, we identify a Trust-but-Verify approach that spans this spectrum in addressing trust.

Perumalla, Kalyan↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS-based on real-time optimal power flow-controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources: Preprint

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS—based on real-time optimal power flow—controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

61 RADIATION PROTECTION AND DOSIMETRY↗

Saturn Facility Oil Transfer Automation System

The Saturn accelerator, owned by Sandia National Laboratories, has been in operation since the early 1980s and still has many of the original systems. A critical legacy system is the oil transfer system which transfers 250,000 gallons of transformer oil from outside storage tanks to the Saturn facility. The oil transfer system was identified for upgrade to current technology standards. Using the existing valves, pumps, and relay controls, the system was automated using the National Instruments cRIO FGPA platform. Engineered safety practices, including a failure mode effects analysis, were used to develop error handling requirements. The uniqueness of the Saturn Oil Automated Transfer System (SOATS) is in the graphical user interface. The SOATS uses an HTML interface to communicate to the cRIO, creating a platform independent control system. The SOATS was commissioned in April 2013.

02 PETROLEUM↗

Implementation of SAP Waste Management System

The Y-12 National Security Complex (Y-12) assumed responsibility for newly generated waste on October 1, 2005. To ensure effective management and accountability of newly generated waste, Y-12 has opted to utilize SAP, Y-12's Enterprise Resource Planning (ERP) tool, to track low-level radioactive waste (LLW), mixed waste (MW), hazardous waste, and non-regulated waste from generation through acceptance and disposal. SAP Waste will include the functionality of the current waste tracking system and integrate with the applicable modules of SAP already in use. The functionality of two legacy systems, the Generator Entry System (GES) and the Waste Information Tracking System (WITS), and peripheral spreadsheets, databases, and e-mail/fax communications will be replaced by SAP Waste. Fundamentally, SAP Waste will promote waste acceptance for certification and disposal, not storage. SAP Waste will provide a one-time data entry location where waste generators can enter waste container information, track the status of their waste, and maintain documentation. A benefit of the new system is that it will provide a single data repository where Y-12's Waste Management organization can establish waste profiles, verify and validate data, maintain inventory control utilizing hand-held data transfer devices, schedule and ship waste, manage project accounting, and report on waste handling activities. This single data repository will facilitate the production of detailed waste generation reports for use in forecasting and budgeting, provide the data for required regulatory reports, and generate metrics to evaluate the performance of the Waste Management organization and its subcontractors. SAP Waste will replace the outdated and expensive legacy system, establish tools the site needs to manage newly generated waste, and optimize the use of the site's ERP tool for integration with related business processes while promoting disposition of waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of Security Attributes of Smart Grid Systems- Current Cyber Security Issues

This document provides information for a report to congress on Smart Grid security as required by Section 1309 of Title XIII of the Energy Independence and Security Act of 2007. The security of any future Smart Grid is dependent on successfully addressing the cyber security issues associated with the nation’s current power grid. Smart Grid will utilize numerous legacy systems and technologies that are currently installed. Therefore, known vulnerabilities in these legacy systems must be remediated and associated risks mitigated in order to increase the security and success of the Smart Grid. The implementation of Smart Grid will include the deployment of many new technologies and multiple communication infrastructures. This report describes the main technologies that support Smart Grid and summarizes the status of implementation into the existing U.S. electrical infrastructure.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of IEC 62443 Standard Gaps for Electric Grid Substation Model Use Case

This report presents an evaluation of the IEC 62443 standards in the context of electric grid substations, as part of a collaborative effort among Sandia National Laboratories (SNL), Idaho National Laboratory (INL), and the National Renewable Energy Laboratory (NREL). The primary objective is to assess the applicability of these standards to enhance cybersecurity measures for industrial automation and control systems (IACS) within the energy sector. The evaluation identifies strengths, such as the scalability of security levels and the structured lifecycle guidance provided by IEC 62443. However, it also highlights significant gaps, including limited integration of physical security, insufficient guidance for legacy systems, and challenges in addressing emerging threats like supply chain vulnerabilities. Recommendations for refining the standards are proposed, including the need for tailored guidance for securing legacy systems, integrating physical security with cybersecurity frameworks, and enhancing interoperability across multi-vendor environments. By addressing these gaps, the IEC 62443 standards can be strengthened to ensure comprehensive cybersecurity for electric grid substations, thereby supporting the resilience and reliability of critical energy infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy (Revision 1)

Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970's vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performance improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE's program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security. The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: (1) Highly integrated control rooms; (2) Highly automated plant; (3) Integrated operations; (4) Human performance improvement for field workers; and (5) Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Long-Term Instrumentation, Information, and Control Systems (II&C) Modernization Future Vision and Strategy

Life extension beyond 60 years for the U.S operating nuclear fleet requires that instrumentation and control (I&C) systems be upgraded to address aging and reliability concerns. It is impractical for the legacy systems based on 1970’s vintage technology operate over this extended time period. Indeed, utilities have successfully engaged in such replacements when dictated by these operational concerns. However, the replacements have been approached in a like-for-like manner, meaning that they do not take advantage of the inherent capabilities of digital technology to improve business functions. And so, the improvement in I&C system performance has not translated to bottom-line performance improvement for the fleet. Therefore, wide-scale modernization of the legacy I&C systems could prove to be cost-prohibitive unless the technology is implemented in a manner to enable significant business innovation as a means of off-setting the cost of upgrades. A Future Vision of a transformed nuclear plant operating model based on an integrated digital environment has been developed as part of the Advanced Instrumentation, Information, and Control (II&C) research pathway, under the Light Water Reactor (LWR) Sustainability Program. This is a research and development program sponsored by the U.S. Department of Energy (DOE), performed in close collaboration with the nuclear utility industry, to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. DOE’s program focus is on longer-term and higher-risk/reward research that contributes to the national policy objectives of energy security and environmental security . The Advanced II&C research pathway is being conducted by the Idaho National Laboratory (INL). The Future Vision is based on a digital architecture that encompasses all aspects of plant operations and support, integrating plant systems, plant work processes, and plant workers in a seamless digital environment to enhance nuclear safety, increase productivity, and improve overall plant performance. The long-term goal is to transform the operating model of the nuclear power plants (NPP)s from one that is highly reliant on a large staff performing mostly manual activities to an operating model based on highly integrated technology with a smaller staff. This digital transformation is critical to addressing an array of issues facing the plants, including aging of legacy analog systems, potential shortage of technical workers, ever-increasing expectations for nuclear safety improvement, and relentless pressure to reduce cost. The Future Vision is based on research is being conducted in the following major areas of plant function: 1. Highly integrated control rooms 2. Highly automated plant 3. Integrated operations 4. Human performance improvement for field workers 5. Outage safety and efficiency. Pilot projects will be conducted in each of these areas as the means for industry to collectively integrate these new technologies into nuclear plant work activities. The pilot projects introduce new digital technologies into the nuclear plant operating environment at host operating plants to demonstrate and validate them for production usage. In turn, the pilot project technologies serve as the stepping stones to the eventual seamless digital environment as described in the Future Vision.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗