Lessons from recent theoretical treatments of Al–M bonds (M = Fe, Cu, Ag, Au) that capture CO 2
A survey of recent theoretical treatments of Al–M bonds that activate CO 2 is given, with an emphasis on extracting lessons to guide future studies.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
A survey of recent theoretical treatments of Al–M bonds that activate CO 2 is given, with an emphasis on extracting lessons to guide future studies.
Explore the source record for details and available documents.
Not Available
Not provided.
Abstract not provided
A large set of neptunium compounds with different oxidation states (III to VII) was assembled to study the Mössbauer isomer shift by wave function calculations and better understand covalency in f-elements complexes. The contact density approach was used to calculate the isomer shift using complete active space self-consistent field (CASSCF) multiconfiguration wave functions, as well as matrix product states [from Density Matrix Renormalization Group (DMRG) algorithms] for large active spaces. Dynamic correlation effects for the isomer shifts were treated via CASPT2 energy derivatives with respect to the nuclear radius. The CASSCF calculations appear to produce different orbital overlocalization errors for low and high Np oxidation states. For compounds with low Np oxidation numbers, the errors can be attributed to the overlocalization of the 5f orbitals. For the compounds with high Np oxidation numbers, the main errors arise from an overlocalization of ligand orbitals and concomitant to weak donation bonding. Attempts to mitigate the overlocalization errors with large active spaces using DMRG were only partially successful, showing that explicit treatment of dynamic correlation is necessary for accurate predictions of Mössbauer isomer shifts. The CASPT2 calculations perform very satisfactorily. For a subset of Np compounds, both static and dynamic correlation effects were substantial. Furthermore, a rational active space selection based on orbital entanglement diagrams proved beneficial for determining the optimal reference wave function.
Here, photovoltaic modules are expected to operate in the field for more than 25 years, so reliability assessment is critical for the commercialization of new photovoltaic technologies. In early development stages, understanding and addressing the device degradation mechanisms are the priorities. However, any technology targeting large-scale deployment must eventually pass industry-standard qualification tests and undergo reliability testing to validate the module lifetime. In this Perspective, we review the methodologies used to assess the reliability of established photovoltaics technologies and to develop standardized qualification tests. We present the stress factors and stress levels for degradation mechanisms currently identified in pre-commercial perovskite devices, along with engineering concepts for mitigation of those degradation modes. Recommendations for complete and transparent reporting of stability tests are given, to facilitate future inter-laboratory comparisons and to further the understanding of field-relevant degradation mechanisms, which will benefit the development of accelerated stress tests.
Abstract not provided.
Explore the source record for details and available documents.
Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.
ExxonMobil Research and Engineering Company, via a technical services agreement, engages Idaho National Laboratory (INL) to provide general industry knowledge, best practices, and lessons learned in cellulosic ethanol plant design, project execution, and operations. INL will also assess publicly proposed cellulosic plant designs. The scope of work will be accomplished in three tasks: Task 1, Communicate industry knowledge; Task 2, Present high-level lessons learned; Task 3, Provide an engineering assessment of publicly proposed ethanol plant designs. This Task 1 report provides a high-level summary of general industry knowledge, best practice, and lessons learned in biomass feedstock logistics and integration with bioconversion processes.
This paper presents lessons learned regarding fabricating packaging systems from the perspective of a design authority (DA). Capturing and implementing lessons learned is critical for an organization to reduce systematic project risk and thereby promote the likelihood of project success. This paper defines the design authority as the organization responsible for technical design, resolving technical design issues, quality assurance program, and maintenance of the packaging system license. A package system is defined as the packaging, its contents, and auxiliary equipment. Packages are certified by the NRC under 10 CFR 71[1] for transportation by ground. The following lessons learned subjects are presented in the paper: quality assurance, interpretation of drawing dimensional requirements, execution of manufacturing processes, hardware dimensional inspection, and leakage rate testing. All discrepancies presented in this paper have been resolved as described in the appropriate final data package. All described package systems are in compliance with their Safety Analysis Report (SAR) and certificate of conformance requirements. The intent of this paper is to identify opportunities for improving the outcome of future projects and to mitigate fabrication challenges proactively. (authors)
U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)
Laboratory research can expose workers to a wide variety of chemical hazards. Researchers must not only take personal responsibility for their safety but also inevitably rely on coworkers to also work safely. The foundations for protocols, requirements, and behaviors come from our history and lessons learned from others. For that reason, here, a recent incident is examined in which a researcher suffered hydrofluoric acid (HF) burns while working with an inorganic digestion mixture of aqueous HF (8%) and nitric acid (HNO 3 , 58%). HF education is critical for workers because delays in treatment, improper treatment, and delay of symptoms are all factors in unfavorable outcomes in case reports. Furthermore, while the potential severity of the incident was elevated due to bypassed engineered controls and lack of proper personal protective equipment, only minor injuries were sustained. We discuss the results of a causal analysis of the incident that revealed areas of improvement in protocols, personal protective equipment, and emergency response that could help prevent similar accidents from occurring. We also present simple improvements that anyone can implement to reduce the potential consequences of an accident, based upon our lessons learned.
The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be amongst the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy, the reactor is intended to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is intent on publicly documenting key lessons learned along the way toward demonstration. Building on a 2024 report that focused on lessons learned from the design and project management phase, this 2025 edition focuses on findings from the MARVEL guard vessel fabrication and primary coolant apparatus test (PCAT) testing.
The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.
Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.
By the end of October 2022, the US HL-LHC Accelerator Upgrade Project (AUP) had completed fabrication of ten MQXFA magnets and tested eight of them. The MQXFA magnets are the low-beta quadrupole magnets to be used in the Q1 and Q3 Inner Triplet elements of the High Luminosity LHC. This AUP effort is shared by BNL, Fermilab, and LBNL, with strand verification tests at NHMFL. An important step of the AUP QA plan is the testing of MQXFA magnets in a vertical cryostat at BNL. The acceptance criteria that could be tested at BNL were all met by the first four production magnets (MQXFA03-MQXFA06). Subsequently, two magnets (MQXFA07 and MQXFA08) did not meet some of the criteria and were disassembled. Furthermore, lessons learned during the disassembly of MQXFA07 caused a revision to the assembly specifications that were used for MQXFA10 and subsequent magnets. In this article, we present a summary of 1) the fabrication and test data for all the MQXFA magnets; 2) the analysis of MQXFA07/A08 test results with characterization of the limiting mechanism; 3) the outcome of the investigation, including the lessons learned during MQXFA07 disassembly; and 4) the finite element analysis correlating observations with test performance.