Search NASA⌕ Search

SEARCH · Search NASA

Results for “load shift”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Rewarding Grid-Friendly Behavior: Estimating the Potential Bill Reduction and Load Shifting Benefits of Dynamic Prices

Shifting electric load from times of peak demand can be a key strategy to slow price growth as reducing peak demand avoids the cost of upgrading generation, transmission and distribution infrastructure. Utilities are releasing time-varying prices, such as time of use rates or dynamic prices, to incentivize grid-friendly load shifting. New dynamic price programs provide insight into the true cost of operating electricity grids and the potential economic benefits of load shifting. Program developers and device manufacturers need to understand the economic opportunities in terms of 1) the variation in prices across hours, days, and seasons; 2) the change in utility bills for customers who don’t shift load; and 3) the potential load shifted and economic value of different technologies if manufacturers or aggregators deploy price-responsive controls. This paper estimates possible impacts of dynamic price adoption and load shifting controls if customers paid the dynamic rate from one pilot program. Statistical analysis of historical prices identified annual and seasonal metrics as well as representative price curves for each circuit in the pilot. Simulations for residential technologies with price-responsive controls including unitary heat pump water heaters, central multifamily heat pump water heaters, heating & cooling + storage systems, and pool pumps estimated the potential impacts of highly dynamic prices both with and without load shifting controls. Results showed the potential to reduce electricity costs on representative days by 42-94% and reduce consumption during times of high electricity prices by 63-100% compared to baseline operation for those flex-friendly devices.

Grant, Peter↗

Dual-season thermal energy storage-integrated heat pump system for load shifting: experiments, modeling and nationwide analysis

Here, this paper proposes and validates a dual-season thermal energy storage-integrated heat pump (TES-HP) system that shifts building electric load in both cooling and heating modes using a single phase-change TES. The design uses the TES as a heat sink for the condenser in summer and a heat source for the evaporator in winter, thereby reducing on-peak electric demand while ensuring compatible with existing air-distribution systems. A 14-kW TES-HP prototype with six operating modes and novel refrigerant charge management strategies was experimentally tested under varied conditions. Subsequently, data-driven polynomial performance curves were developed and validated against experiments, then coupled with a phase change material (PCM) model and a calibrated building model within a rule-based controller. Single-day case studies demonstrated effective on-peak demand reduction while maintaining thermal comfort. During cooling, hourly power was lowered by up to 1.5 kW; in heating, average hourly power decreased from over 3.5 kW to 1.8 kW, compared to an HP-only system, achieving 64.5 % load shifting, and the need for resistance heating was eliminated. Seasonal simulations showed typical on-peak electricity savings of 25–35 % in cooling and 40–65 % in heating, with the largest benefits on the hottest and coldest days. Extended response-surface analysis and nationwide mapping quantified load shifting as functions of ambient and TES temperatures, revealing a seasonal trade-off in TES phase-change temperature. These results demonstrate the TES-HP system as a practical and scalable solution for grid-interactive buildings that reduces on-peak demand and electricity use while maintaining thermal comfort and enhancing grid flexibility and reliability.

Grid-interactive buildings↗

End-Use Savings Shapes Measure Documentation: Thermostat Control for Load Shifting in Large Offices

This documentation focuses on a single end-use savings shape measure - thermostat control for load shifting. The thermostat control for load shifting measure applies heating and cooling temperature setpoint adjustment for pre-conditioning before the peak window. The measure takes daily peak load schedule inputs generated by the method "Dispatch Schedule Generation" described in the "Supplemental Documentation: Dispatch Schedule Generation for Demand Flexibility Measures" to determine the start time of the peak window, and then adjusts the thermostat cooling or heating setpoints by a specified offset value from original schedules to precool or preheat the space , for a specified length of time before the start of peak window, and thus shifts load in the peak window to the pre-conditioning period. The measure is flexible and allows users to adjust the heating and cooling offset values and length of pre-conditioning period, but for this study, the load shifting strategy is applied as pre-cooling only (adjusting only cooling setpoints). The default adjustment for cooling setpoints is set to -1 degrees Celsius , and the default duration of pre-cooling is 1 hour. This measure is applicable to large offices equipped with electric HVAC system, which account for approximately 8.72% of the ComStock floor area. The thermostat control for load shifting measure demonstrates -1% daily peak demand reduction and 0% total site energy savings (0 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Detailed Laboratory Evaluation of Electric Demand Load Shifting Potential of Controlled Heat Pump Water Heaters

The demand profile management of electric end uses is vital research for utilities and policymakers planning greenhouse gas emission reductions. In this study, detailed laboratory research was conducted on the load shifting potential of 4 grid-connected HPWHs and one electric resistance water heaters (ERWH). The testing applied different CTA-2045 shed and critical peak command designs under three water draw profiles. Highly-controlled laboratory experiments were conducted in Florida. One of the four HPWHs was a prototype incorporating the new CTA-2045-B protocol feature allowing ‘advanced’ load-up above tank setpoint. A three-hour morning (6 – 9 AM) and four-hour evening curtailment (4 – 8 PM) were defined as the shed or critical peak periods reflecting high-value control periods for utility coincident load for system-wide electric demand reductions. Tests were performed under baseline conditions (no load shift) and under varied load-shifting schemes, including load up and advanced load up, ahead of shed and critical peak commands. Data were collected from December 2020 – February 2022 in the laboratory and compared with field experiments in Florida and the Pacific Northwest. Grid-connected HPWHs were found to reduce peak demand by up to 0.47 kW compared to uncontrolled HPWH units, depending on time of day, control scheme, draw profile, and temperature cluster. The load up strategy demonstrated the ability of all units to utilize heat pump mode for extended periods ahead of peak events. Demand reductions for the HPWHs were much larger when compared with the ERWH— up to 1.64 kW with large hot water draws in winter.

Fenaughty, Karen↗

Load Shifting with Space Conditioning Heat Pumps During Heating Season in the Pacific Northwest

Ductless mini- and multi-split heat pumps are commonly deployed in Pacific Northwest residences, which historically have inefficient space heating and no space cooling. Heat pumps provide these residences with more energy-efficient space heating in the winter and space cooling for increasingly warm summer periods. For many of these applications, heat pumps add a new electrical load at the residence, compelling regional utilities to seek to understand their impacts on the electrical grid and opportunities for load management. In coordination with regional utilities, this study examined the winter load-shifting potential of residential multi-split heat pumps with variable capacity technology. The study included nine residential sites with a total of 20 ductless indoor units, which underwent simulated smart grid control. Grid control functionality was provided through the CTA-2045 communication protocol and included offsetting temperature setpoints for individual indoor units in the study. Field data collection included whole-house and heating, ventilation, and air conditioning electrical power consumption; indoor zone temperatures; occupant surveys; and CTA-2045 curtailment data for both baseline and simulated load-shifting events by site. This paper provides an overview of the load-shifting strategies and aggregated results from winter data collection.

ASHRAE, Heat pump, energy effciency, residential b↗

MPC solution for optimal load shifting for buildings with ON/OFF staged packaged units: Experimental demonstration, and lessons learned

Small and medium-sized commercial buildings (SMCB) are significant demand response resources, and it is important to develop grid-responsive control algorithms that exploit those resources and create financial benefits for building owners and HVAC service providers. Furthermore, unlike large-sized commercial buildings, there is an opportunity to have universally applicable control solutions for many SMCBs since those buildings have a consistent HVAC system configuration: SMCBs are commonly served by multiple-staged air conditioning units controlled by their own thermostats. Despite the demand response potential and scalability, however, very few control solutions are available for SMCBs. Typical model predictive control (MPC) and heuristic control approaches for cooling load shifting that lower thermostat setpoints before an electric price jump are suitable mainly for large-sized commercial buildings where a continuous capacity modulation is possible, e.g., via dampers in variable air volume terminal units. However, those approaches can cause undesired, high peaks for SMCBs due to the nature of ON/OFF unit staging and narrow thermostat deadbands. This could discourage the use of advanced grid-responsive controls for SMCBs due to the concern of high demand charges, and has to be resolved. This paper presents a MPC solution that overcomes this challenge. It has a hierarchical MPC structure where an upper level MPC is responsible for electrical load shifting in response to an electric price signal while a lower level MPC is responsible for coordinating compressor stages to eliminate unnecessary peaks and follows the setpoints determined by the upper level MPC. In this work, two one-month, comprehensive laboratory tests have been carried out to demonstrate load shifting and cost savings for the algorithm. Interesting trade-offs between energy efficiency and load flexibility were observed and are discussed, and lessons learned for applying MPCs for SMCBs are also presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Validation of Packaged RAD-AC HVAC System: Efficiency and Load Shifting via Electrochemical Regeneration of Liquid Desiccants

In this project, Mojave and SRI have demonstrated field validation and load shifting of liquid desiccant air conditioning systems with two liquid desiccant dedicated outdoor air system (DOAS) air conditioner units – one employing traditional thermal desiccant regeneration and the other utilizing Mojave’s novel electrochemical desiccant regeneration technology based on Redox Assisted electrodialysis. The Redox Assisted Dehumidification Air Conditioning (RAD-AC) technology is further developed and validated in this work to demonstrate an Integrated Seasonal Moisture Removal Efficiency (ISMRE) > 5.0 kg/kWh and shifting of ≥ 10% electric load in ≤ 72 hours. Furthermore, the longevity and durability of Mojave’s liquid desiccant air conditioning technology is validated in field testing of the thermally regenerated unit, with the unit demonstrating operation with >90% uptime while experiencing an efficiency degradation of < 10% during a testing campaign of over 5400 hours.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Experimental study of a thermal energy storage-integrated heat pump system for load shifting in space cooling and heating

This study experimentally investigates an all-season thermal energy storage-integrated heat pump (TES-HP) system developed to enhance building energy efficiency and support grid-interactive operation through load shifting in both cooling and heating. A 4-ton commercial rooftop air-source heat pump was modified by integrating a hydronic thermal energy storage (TES) unit containing a phase change material (PCM) with a melting temperature of 22.0 °C. The system employs two reversing valves and three electronic expansion valves to enable six operating modes, including normal, TES charging, and TES discharging in both cooling and heating seasons. A subcooling-controlled electronic expansion valve was implemented to mitigate refrigerant maldistribution caused by unequal internal volumes among the heat exchangers. Compared with a baseline heat pump, the TES-HP reduced power consumption by 30–50% during cooling at an ambient temperature of 40.6 °C, and by up to 60% during heating at −15.0 °C, while maintaining high performance under cold-climate conditions. Additionaly to experimental evaluation, a simplified annualized on-peak analysis was conducted to compare the TES-HP with the baseline system, indicating an on-peak electricity reduction of approximately 876 kWhₑ per unit per year and associated on-peak cost savings under time-of-use pricing. These results demonstrate that the TES-HP effectively decouples HP operation from adverse ambient conditions, improving flexibility, resilience, and energy efficiency. This work advances prior research by experimentally proving the integration of PCM-based TES for a year-round, load-flexible HVAC operation.

42 ENGINEERING↗

Peak cooling load shift capability of a thermal energy storage system integrated with an active insulation system in US climate zones

This study aims to evaluate a thermal energy storage (TES) system integrated with an active insulation system (AIS) to form a TES + AIS integrated wall system as a partition and as a secondary cooling system to shift the peak load and reduce cooling energy consumption. To understand and demonstrate its cooling performance, the TES + AIS integrated wall system was installed in an office building in Oak Ridge, Tennessee. To investigate the effect of the TES + AIS integrated wall system in a typical office building and various climate zones, the US Department of Energy’s prototype office building model was modified to accommodate the proposed system. In this work, results showed that the minimum size of the proposed system to achieve energy savings varies depending on climate conditions. The minimum size of the proposed system for cooling energy saving and shifting peak cooling demand in climate zones 2, 3, and 5 is 29.7 m 2 , whereas it is 44.6 m 2 in zones 4 and 6. By installing the minimum size of the proposed system, 11.3 % to 16.4 % of cooling energy can be shifted during discharge hours in a representative summer day.

25 ENERGY STORAGE↗

Load-Shifting Strategies for Cost-Effective Emission Reductions at Wastewater Facilities

Significant hourly variation in the carbon intensity of electricity supplied to wastewater facilities introduces an opportunity to lower emissions by shifting the timing of their energy demand. This shift could be accomplished by storing wastewater, biogas from sludge digestion, or electricity from on-site biogas generation. However, the life cycle emissions and cost implications of these options are not clear. Here, we present a multiobjective optimization framework for comparing cost- and emission-minimizing load-shifting strategies at a California case study facility with a relatively low carbon intensity grid and high spread in peak and off-peak electricity prices. We evaluate cost and emission trade-offs from the optimal flexible operation of both existing infrastructure and optimally sized energy flexibility upgrades. We estimate energy-related emission reductions of up to 9.0% with flexible operation of existing infrastructure and up to 16.8% with optimally sized storage upgrades. Only a fraction of these potential savings are realized under actual industrial energy tariffs and the EPA’s recommended social cost of carbon. Energy flexibility may hold promise as a short-term emission-saving solution for the wastewater sector, but the extent of savings is heavily dependent on the cost of carbon, electricity tariffs, and emission intensity of the regional electricity grid.

climate↗

Preliminary Assessment for the Electric Load Shifting Potential of Integrating Thermal Energy Storage with Heat Pumps in Residential Buildings in Texas of United States

The widespread adoption of electric-driven heat pumps for heating and cooling is expected to significantly increase electric demand. Cooling electric demand will result in an increase in peak hours electric loads, placing additional strain on the grid during peak hours. This challenge, combined with the current rapidly increasing demand from data centers, exacerbates the electric demand duck curve problem. Integrating thermal energy storage (TES) with heat pump can shift electric use for heating and cooling from peak to off-peak hours of the electric grid, which can help flatten the daily electric demand profile of a building. This paper presents a novel design that integrates heat pump with TES (HP-TES), which uses phase change materials (PCM). Heat pump charges TES by melting or freezing PCM during off-peak hours when there is no thermal demand from the building. TES is then discharged (i.e., by freezing or melting PCM) during peak hours to provide a more favorable heat source or heat sink for the heat pump to meet the thermal demand of the building with lower electricity use than conventional air-source heat pumps. Computer simulations were developed to predict the performance of HP-TES applied to a typical single-family house in the US. The building-level simulation results were scaled up to preliminarily assess the aggregated impacts of deploying HP-TES across all single-family houses in Texas of the United States, including reduction of peak demand of the electric grid.

Anees, Fady [ORNL]↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains.Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling.The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

99 GENERAL AND MISCELLANEOUS↗

Optimizing Control for Efficient Load Shifting with Thermal Energy Storage in Existing HVAC Systems

This project developed the integration of a direct-contact heat exchanger (DCHX) based thermal energy storage (TES) system with a chiller–air handling unit (AHU) plant to evaluate its potential for reducing building energy costs. Detailed physical models of the TES unit, building envelope, and HVAC components were developed alongside simplified control-oriented models to support both high-fidelity simulation and real-time optimization. Two control strategies were implemented and compared: a rule-based control (RBC) aligned with utility time-of-use (ToU) rates, and a model predictive control (MPC) framework leveraging forecasts of building load, weather, and internal gains. Simulation results show that the RBC strategy reduced daily electricity costs by around 30% by shifting cooling production from on-peak to off-peak hours. In contrast, the MPC strategy achieved significantly greater performance, reducing daily operating costs by up to 44% and peak-hour costs by more than 60%. Both strategies maintained indoor thermal comfort within acceptable limits, with MPC further improving load distribution and reducing equipment cycling. The outcomes confirm that TES integration, particularly when coordinated with advanced predictive control, can provide substantial cost savings and on-peak demand reduction. . These findings directly support the U.S. Department of Energy’s goals for grid-interactive efficient buildings and demonstrate the potential of TES-enabled HVAC systems for scalable deployment across the commercial building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Field Study of Grid-connected Heat Pump Water Heaters in the Southeast U.S.: The Next Right Thing

The integration of grid-connected functionality and advanced control algorithms into heat pump water heaters (HPWH) offers the capability to shift load with minimal customer impact. This capability provides a flexible grid resource to utilities, while the increased energy efficiency of HPWHs offers customers a lower electric bill. The combined utility/customer value from grid-connected HPWHs is compelling in the Southeast U.S. where residential electric water heating is prevalent and utility load management is common. This paper presents the results of a HPWH load shifting study conducted in Central Florida using the CTA-2045 standard. Building upon previous research in the Pacific Northwest, this study consisted of approximately 45 occupied homes equipped with HPWHs undergoing load shifting strategies weekly for over a year. Curtailment durations ranged from three to five hours in the morning, and four to five hours in the evening to coincide with high-value periods for utility coincident load for system-wide electric demand reductions. During the morning and afternoon, a one- or two-hour load-up event preceded curtailment. Baseline data were collected across varied Florida weather in which no load shifting events were implemented. Results from traditional load shifting strategies were analyzed across seasons and used to devise unique load shifting approaches to increase renewable energy use during periods of high solar energy generation. Regional impacts are forecasted for large-scale implementation of strategies. Lessons learned and recommendations are also provided for how utilities, manufacturers, and regional planners can maximize load shifting benefits from grid-connected HPWHs.

Heat pump water heaters, residential building, loa↗

How good are learning-based control v.s. model-based control for load shifting? Investigations on a single zone building energy system

Both model predictive control (MPC) and deep reinforcement learning control (DRL) have been presented as a way to approximate the true optimality of a dynamic programming problem, and these two have shown significant operational cost saving potentials for building energy systems. Furthermore, there is still a lack of in-depth quantitative studies on their approximation levels to the true optimality, especially in the building energy domain. To fill in the gap, this paper provides a numerical framework that enables the evaluation of the optimality levels of different controllers for building energy systems. This framework is then used to comprehensively compare the optimal control performance of both MPC and DRL controllers with given computation budgets for a single zone fan coil unit system. Note the optimality is estimated based on a user-specific selection of trade-off weights among energy costs, thermal comfort and control slew rates. Compared with the best optimality we can find through expensive optimization simulations, the best DRL agent can maximally approximate the optimality by 96.54%, which outperforms the best MPC whose optimality level is 90.11%. However, due to the stochasticity, the DRL agent is only expected to approximate the optimality by 90.42%, which is almost equivalent to the best MPC. Except for Proximal Policy Optimization (PPO), all DRL agents can have a better approximation to the optimality than the best MPC, and are expected to have better approximation than the MPC with a prediction horizon of 32 steps (15 min per step). In terms of reducing energy cost and thermal discomfort, MPC can outperform the rule-based control (RBC) by 18.47%–25.44%. DRL can be expected to outperform RBC by 18.95%–25.65% ,and the best DRL control policy can outperform RBC by 20.29%–29.72%. Although the comparison of the optimality level is performed in a perfect setting, e.g., MPC assumes perfect models, and DRL assumes a perfect offline training process and online deployment process, this can shed insight on their capabilities of approximating to the original dynamic programming problem.

24 POWER TRANSMISSION AND DISTRIBUTION↗