Search NASA⌕ Search

SEARCH · Search NASA

Results for “local utility service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Framework for Identifying Building Energy Models of Localized Utility Service Areas Using Smart Meter Data

Bottom-up load modeling of buildings offers a versatile approach to simulating baseline demand and scenarios of future technology evolution and adoption at the individual building level. This capability is essential to understanding how future load shapes may change with the adoption of electric equipment and vehicles, particularly as it relates to grid planning and infrastructure investments. Traditionally, grid planning techniques have used historical load data to predict future load and infrastructure needs. However, with the anticipated rise in adoption of electrification technologies such as heat pumps and electric vehicles, historical data become less reliable predictors of the future. By employing ResStock, a high-fidelity building stock modeling tool, we can fine-tune electrification scenarios and aggregate models to represent varying geographic resolutions of the grid system, while considering the underlying features of homes. This may enable a more accurate and responsive approach to anticipate and plan for the evolving landscape of energy demands. We present a new framework that leverages building stock energy modeling to identify building models that align with the load shapes and housing attributes of buildings with AMI data. This approach applies two model layers: (1) a classification step that identifies the presence of air conditioning, electric heating, and electric water heating, and (2) an optimization routine that identifies building energy models aligning with load profile data from advanced metering infrastructure meters. This report demonstrates one approach to deploying this framework, and presents results for three test cases that use both modeled and AMI data to assess performance. For a test case using AMI data in Fort Collins, Colorado, we observed a median monthly electricity load CV-RMSE of 16.6%, and a top ten daily heating and cooling median absolute percent error of 7.7% and 8.3%, respectively. For each AMI meter, we identify a set of potential energy models so that downstream use-cases can account for uncertainty driven by variability of baseline technologies and occupant behavior, which impact the response to electrification and energy efficiency scenarios. Our results indicate that ResStock has potential as a scalable solution for modeling residential energy demand at local grid resolutions. Its performance depends on location-specific factors, underlying building characteristics, and the level of aggregation, offering a path towards more precise and adaptive distribution grid planning for the evolving energy landscape.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Austin Solar Guide (Flyer)

This flyer was developed to guide homeowners on their solar journey and expand the benefits of solar to local residents. The guide is an overview of various energy and solar programs and services through the Austin Energy utility with tips for spotting scams, a summary of common terms when designing a solar system, and considerations when searching for a solar contractor.

14 SOLAR ENERGY↗

Safely Exploring Solar: A Guide for Austin Energy Customers

It's easy to get overwhelmed as you start to explore your solar options. There is a wealth of information available out there, particularly online, and it can be hard to know who to trust. This informational guide has been adapted from Austin Energy's Solar Education Course and other national best practice resources, as of May 1, 2023. It will help you understand some of the key concepts and resources available to help you on your solar journey if you have a home in Austin Energy's service territory and are considering installing solar. This document includes: (1) Austin Energy Programs and Services Related to Solar; (2) Tips for Spotting a Solar Scam; (3) Things to Know When Designing Your System; (4) Key Considerations When Shopping for a Solar Contractor; and (5) Final Takeaways.

14 SOLAR ENERGY↗

Combining Droop Curve Concepts with Control Systems for Wind Turbine Active Power Control: Preprint

Wind energy is becoming a larger portion of the global energy portfolio and wind penetration has increased dramatically in certain regions of the world. This increasing wind penetration has driven the need for wind turbines to provide active power control (APC) services to the local utility grid, as wind turbines do not intrinsically provide frequency regulation services that are common withtraditional generators. It is common for large scale wind turbines to be decoupled from the utility grid via power electronics, which allows the turbine to synthesize APC commands via control of the generator torque and blade pitch commands. Consequently, the APC services provided by a wind turbine can be more flexible than those provided by conventional generators. This paper focuses on thedevelopment and implementation of both static and dynamic droop curves to measure grid frequency and output delta power reference signals to a novel power set point tracking control system. The combined droop curve and power tracking controller is simulated and comparisons are made between simulations using various droop curve parameters and stochastic wind conditions. The tradeoffs involvedwith aggressive response to frequency events are analyzed. At the turbine level, simulations are performed to analyze induced structural loads. At the grid level, simulations test a wind plant's response to a dip in grid frequency.

17 WIND ENERGY↗

Implementation and evaluation of a radiological field investigation for real property interests associated with the FUSRAP Maywood Site - 15611

Public streets, easements, and rights-of-way, collectively referred to as Real Property Interests (RPI), pose challenging and complex problems for the FUSRAP Maywood Project Team. RPIs are components of a multi-faceted objective to evaluate all remaining sources of contamination for which the Government is responsible under the Maywood Record of Decision. USACE designed and implemented a MARSSIM-based radiological investigation within sixteen potentially impacted RPIs. These RPIs were not completely addressed on their own or in conjunction with nearby property investigations or remediations. However, these RPIs were investigated based on the potential for or known impact of FMSS contamination as determined through both a historic data review of the transport mechanism (downstream waste deposition) and process knowledge obtained during Final Status Survey of proximal properties. The primary objectives of this investigation were to confirm the presence or absence of FUSRAP contamination within a given RPI, provide sufficient data to release an RPI if contamination was not encountered, and provide sufficient data for either design of an appropriate remedial solution or implementation of Land Use Controls when contamination was encountered. Of additional value, knowledge gained during the RPI investigations will allow the team to share useful radiological data with local officials and utility service providers. This information will support better, more informed decisions by all parties involved in situations such as emergency subsurface utility repairs, roadway improvement planning, or even natural disaster response. Finally, certain unexpected outcomes learned during the final data analysis may lead to refinement of the conceptual site model. Logistical lessons learned and challenges encountered during the Maywood investigation may also be helpful to stakeholders, planners, and managers of similar projects wishing to identify their own potential liability within public streets, easements, rights-of-way, and other types of RPIs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Housing Energy Connection Project (Final Technical Report)

This project expanded existing medium-voltage distribution to 33 households, a daycare, a mechanical shop, irrigation pumps, and a sewer lift station, all of which previously received electric service from the local electric utility. As part of the project, automatic meter reading (AMR) and advanced metering infrastructure (AMI) was installed to allow the Tribe to set up its own electric metering like a utility. The primary objective of this project was to expand the Tribe-owned electrical distribution to provide highly reliable electrical service to these existing loads. The objective was successfully met after project completion. The project reduced high costs for electric energy previously supplied by the utility, by supplanting utility-supplied electric power with Tribe-generated electric power. The project gave the Tribe greater independence from traditional power sources and provided jobs for the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Heat Loss Imagery

Infrared scanning devices are being used to produce images that show, by color or black-and-white shading differences, which buildings and homes are losing heat to the outdoors, and how much. Heat loss surveys done by Texas Instruments, Daedalus Enterprises, Inc. and other companies have growing acceptance of their services among industrial firms, utilities, local governments, and state and federal agencies interested in promoting heat loss awareness and inspiring corrective actions.

Source record↗

Marshall Space Flight Center Telescience Resource Kit

Telescience Resource Kit (TReK) is a suite of software applications that can be used to monitor and control assets in space or on the ground. The Telescience Resource Kit was originally developed for the International Space Station program. Since then it has been used to support a variety of NASA programs and projects including the WB-57 Ascent Vehicle Experiment (WAVE) project, the Fast Affordable Science and Technology Satellite (FASTSAT) project, and the Constellation Program. The Payloads Operations Center (POC), also known as the Payload Operations Integration Center (POIC), provides the capability for payload users to operate their payloads at their home sites. In this environment, TReK provides local ground support system services and an interface to utilize remote services provided by the POC. TReK provides ground system services for local and remote payload user sites including International Partner sites, Telescience Support Centers, and U.S. Investigator sites in over 40 locations worldwide. General Capabilities: Support for various data interfaces such as User Datagram Protocol, Transmission Control Protocol, and Serial interfaces. Data Services - retrieve, process, record, playback, forward, and display data (ground based data or telemetry data). Command - create, modify, send, and track commands. Command Management - Configure one TReK system to serve as a command server/filter for other TReK systems. Database - databases are used to store telemetry and command definition information. Application Programming Interface (API) - ANSI C interface compatible with commercial products such as Visual C++, Visual Basic, LabVIEW, Borland C++, etc. The TReK API provides a bridge for users to develop software to access and extend TReK services. Environments - development, test, simulations, training, and flight. Includes standalone training simulators.

Wade, Gina↗

Telescience Resource Kit Software Capabilities and Future Enhancements

The Telescience Resource Kit (TReK) is a suite of PC-based software applications that can be used to monitor and control a payload on board the International Space Station (ISS). This software provides a way for payload users to operate their payloads from their home sites. It can be used by an individual or a team of people. TReK provides both local ground support system services and an interface to utilize remote services provided by the Payload Operations Integration Center (POIC). by the POIC and to perform local data functions such as processing the data, storing it in local files, and forwarding it to other computer systems. TReK can also be used to build, send, and track payload commands. In addition to these features, work is in progress to add a new command management capability. This capability will provide a way to manage a multi- platform command environment that can include geographically distributed computers. This is intended to help those teams that need to manage a shared on-board resource such as a facility class payload. The environment can be configured such that one individual can manage all the command activities associated with that payload. This paper will provide a summary of existing TReK capabilities and a description of the new command management capability. For example, 7'ReK can be used to receive payload data distributed

Schneider, Michelle↗

Lunar In-situ Resource Utilization Concept to Reality

ISRU is a capability involving multiple elements to achieve final products (mobility, product storage and delivery, power, crew and/or robotic maintenance, etc.) ‘ISRU’ does not exist on its own. By definition, it must connect and tie to users/customers of ISRU products and services Living Off the Land: ISRU involves any hardware or operation that harnesses and utilizes ‘in-situ’ (local) resources to create products and services for robotic and human exploration. Resource Examples •Water •Oxygen •Hydrogen •Carbon •Metals •Silicon •Nitrogen •Regolith/Rock •Discarded materials Product Examples •Propellant •Life Support Consumables •Feed stock for •Additive manufacturing •Construction •Agriculture substrate and/or fertilizer

lunar↗

NASA Plans for In Situ Resource Utilization (ISRU) Development, Demonstration, and Implementation

The United States (US) National Aeronautics and Space Administration’s (NASA) Artemis Moon to Mars program has four major goals: (1) Returning Americans to the Moon: 1st Woman & 1st Person of Color, (2) Learning to live and work on the Moon, (3) Translating lessons learned so that the United States has capabilities and operational experience for a mission to Mars, and (4) Inspires the next generation of explorers, researchers, scientists, and engineers worldwide. Overarching all of this, the NASA Artemis program also continues to follow Space Policy Directive One (SPD-1) which directs the US to lead an innovative and sustainable exploration program with commercial and international partners. A major objective to achieve the Artemis program goals and SPD-1 is to understand and characterize the resources that exist at these destinations, and to learn how to utilize these resources for sustained human exploration and the commercialization of space. This ability, commonly known as In Situ Resource Utilization (ISRU), involves any hardware or operation that harnesses and utilizes local resources to create products and services for robotic and human explo-ration. The NASA ISRU program is focused on the production of mission consumables and com-modities to enable sustained human exploration, such as rocket propellants, life support consuma-bles, fuel cell reactants, feedstock for manufacturing and construction, and nutrients for food and plant growth. In particular, propellants make up a significant fraction of the mass launched from Earth, are critical to mission success, and can reduce the cost for reusable transportation. Important for enabling long term surface stays, greater independence from Earth, and growing lunar infra-structure are the abilities to perform construction and manufacturing from in situ-derived metals and materials to create and expand on the infrastructure and reduce the logistical resupply needed for sustained surface and space operations. To achieve these ISRU capabilities, NASA, in partner-ship with industry, academia, and international partners has initiated a multi-faceted program which involves (i) Determining Customer Needs (Type and Quantity of Commodities), (ii) supporting ground Development of Hardware and Systems until Ready for Lunar Flight, (iii) utilize Commer-cial Lunar Payload Services (CLPS) flights to fly resource assessment missions with the Science Mission Directorate (SMD), and public-private partnership (PPP) ISRU demonstrations of critical technologies and processes, and (iv) performing commercial-led end-to-end ‘Pilot’ Plant production of commodities and demonstration of usage at a scale and duration that minimizes or eliminates risk for full implementation of ISRU-derived commodities in mission critical applications. This paper will discuss the technologies, mission studies, and accomplishments achieved to date for the ISRU multi-faceted program, and plans for continued ground development and flight missions to reduce the risk of full ISRU implementation.

In situ resource utilization↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Experience in using commercial clouds in CMS

Historically high energy physics computing has been performed on large purpose-built computing systems. In the beginning there were single site computing facilities, which evolved into the Worldwide LHC Computing Grid (WLCG) used today. The vast majority of the WLCG resources are used for LHC computing and the resources are scheduled to be continuously used throughout the year. In the last several years there has been an explosion in capacity and capability of commercial and academic computing clouds. Cloud resources are highly virtualized and intended to be able to be flexibly deployed for a variety of computing tasks. There is a growing interest amongst the cloud providers to demonstrate the capability to perform large scale scientific computing. In this presentation we will discuss results from the CMS experiment using the Fermilab HEPCloud Facility, which utilized both local Fermilab resources and Amazon Web Services (AWS). The goal was to work with AWS through a matching grant to demonstrate a sustained scale approximately equal to half of the worldwide processing resources available to CMS. We will discuss the planning and technical challenges involved in organizing the most IO intensive CMS workflows on a large-scale set of virtualized resource provisioned by the Fermilab HEPCloud. We will describe the data handling and data management challenges. Also, we will discuss the economic issues and cost and operational efficiency comparison to our dedicated resources. At the end we will consider the changes in the working model of HEP computing in a domain with the availability of large scale resources scheduled at peak times.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Energetic Potential for Demand Response in Detached Single Family Homes in Austin, TX

This study builds a generalized tool to quantify the maximum peak load reduction achievable with residential demand response and distributed energy resources (DERs). The tool is demonstrated by using empirical energy usage data from detached single family households within the service territory of Austin Energy - the local municipal utility in Austin, TX. The demand response optimization algorithm shifts energy usage of four controllable, high-consumption residential devices to off-peak hours: HVAC (heating, ventilation, and air conditioning) systems, electric water heaters, electric vehicles, and pool pumps. In addition, rooftop solar generation on individual residences is considered to reduce net load to the utility, and an energy storage system optimization model performing energy arbitrage further reduces peak demand. Results from the aggregate demand response and battery optimization study indicate that peak demand for the 2017 summer peak in Austin Energy could have been reduced by 26 MW or 2.9%. Here, by considering the combined effect of controllable consumer loads, solar generation, and energy storage systems, this study highlights the potential of strategic demand response and energy arbitrage to reduce peak demand at the distribution level.

14 SOLAR ENERGY↗

Piloting the Use of Energy Policy Data to Drive Market Action

Information is only useful when put to use. Across the U.S., an ever-growing number of state and local jurisdictions are implementing building performance reporting laws regarding building energy and water use in the commercial and multifamily sectors. This wealth of performance information is not yet being deployed to its full potential to drive smarter business decisions and increase energy savings. Recognizing that this information can help advance energy efficiency in cities, in 2015 the Institute for Market Transformation (IMT) partnered with New York City and the District of Columbia and local groups, NYCEEC and the District of Columbia Sustainable Energy Utility, on a three-year project to understand and document how, exactly, this data can and should be integrated to reap an array of benefits for cities, energy efficiency service providers, utilities, and building owners. This paper examines how local governments, utilities, and program implementers can replicate the success of DC and NYC. It gathers the findings from the Cities’ and their partners’ efforts to fully understand the datasets, overcome integration challenges, and apply the data to visual engagement, strategic outreach, evidence-based policymaking, and retrofit project identification and deployment. The paper goes beyond theoretical discussion by outlining practical application of data using specific examples from NYC and DC, summarizing challenges and findings, and highlighting next steps for other jurisdictions to learn from and build off the work done in those jurisdictions.

Cities↗

Resilient, Rural, and Revolutionary: Salisbury Square's Direct-Current Affordable Microgrid Community: Preprint

The technology to interconnect buildings with a dedicated direct-current (DC) power distribution network is in place today; what is missing is a turnkey approach to designing a DC microgrid - and the business models allowing such systems to be deployed, owned, and operated at scale. To close this gap, the Salisbury Square Development Team, comprising clean-energy experts, has engineered a resilient community DC microgrid for an affordable housing community in Randolph, Vermont. Ten single-family, occupant-owned residences and 12 multifamily rental units will share locally generated and stored solar energy via a DC power distribution bus capable of operating during extended grid outages. With a DC power distribution network in place, each home will be equipped with high-efficiency DC lighting and appliances, operating alongside alternating current (AC) appliances, even during an islanded mode of operation. To obtain a comprehensive understanding of what is possible and achievable, the Team collaborated with the local utility, regulatory agencies, a national laboratory, energy-as-service providers, and vendors. The collaborators evaluated microgrid typologies, business models, and energy modeling, and analyzed electrification and resilience. Further, the Team applied the URBANoptTM (Urban Renewable Building and Neighborhood optimization, NREL 2022) software development kit (SDK) to Salisbury Square's single-family and multifamily buildings to validate workflows and identify needs for advanced capability. This paper addresses the barriers to entry, scalability, and impact on residents and system ownership. It also examines the analysis that informed the design and engineering of the DC microgrid and the opportunities to streamline the process.

DER↗

Architecting the Grid Edge: Ensuring Reliability and Resilience

Changes in technology, customer expectations, and business and regulatory environments are rapidly evolving causing fundamental changes in the nation’s electrical infrastructure. Nowhere is this more apparent that at the “grid edge”, where there is an increasing number of new devices and systems, as well as complex new interactions between them. This is leading to the traditional relationship between the end-use customers and their utilities being expanded by an increasing number of stakeholders, each with their own operational and financial objectives, governed by regulatory policy. While there are concerns about the rapidly increasing complexity negatively impacting reliable and resilience of the electrical infrastructure, these changes are also bringing new resources and opportunities that hold great potential if they can be properly coordinated. This white paper outlines the considerations for the coordination of multi-stakeholder objectives with electric utility requirements using the concept of grid services. Describing a framework that enables new stakeholders to achieve their local technical and economic objectives, while simultaneously delivering operational benefits to the electrical infrastructure. The concepts of grid architecture are presented as a tool to evaluate how stakeholders might participate in, and benefit from, services, and how utilities can make decision on the reliance on services to ensure reliability and resilience, translating abstract concepts into actionable information for utilities and grid edge stakeholders. The end result of proper coordination, informed by grid architecture, will be a range of new devices and systems, operated by new stakeholders, achieving their local objectives while also increasing the reliability, resilience, security, and affordability of the nation’s critical electrical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗