Search NASASearch

SEARCH · Search NASA

Results for “local utility service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Framework for Identifying Building Energy Models of Localized Utility Service Areas Using Smart Meter Data

Bottom-up load modeling of buildings offers a versatile approach to simulating baseline demand and scenarios of future technology evolution and adoption at the individual building level. This capability is essential to understanding how future load shapes may change with the adoption of electric equipment and vehicles, particularly as it relates to grid planning and infrastructure investments. Traditionally, grid planning techniques have used historical load data to predict future load and infrastructure needs. However, with the anticipated rise in adoption of electrification technologies such as heat pumps and electric vehicles, historical data become less reliable predictors of the future. By employing ResStock, a high-fidelity building stock modeling tool, we can fine-tune electrification scenarios and aggregate models to represent varying geographic resolutions of the grid system, while considering the underlying features of homes. This may enable a more accurate and responsive approach to anticipate and plan for the evolving landscape of energy demands. We present a new framework that leverages building stock energy modeling to identify building models that align with the load shapes and housing attributes of buildings with AMI data. This approach applies two model layers: (1) a classification step that identifies the presence of air conditioning, electric heating, and electric water heating, and (2) an optimization routine that identifies building energy models aligning with load profile data from advanced metering infrastructure meters. This report demonstrates one approach to deploying this framework, and presents results for three test cases that use both modeled and AMI data to assess performance. For a test case using AMI data in Fort Collins, Colorado, we observed a median monthly electricity load CV-RMSE of 16.6%, and a top ten daily heating and cooling median absolute percent error of 7.7% and 8.3%, respectively. For each AMI meter, we identify a set of potential energy models so that downstream use-cases can account for uncertainty driven by variability of baseline technologies and occupant behavior, which impact the response to electrification and energy efficiency scenarios. Our results indicate that ResStock has potential as a scalable solution for modeling residential energy demand at local grid resolutions. Its performance depends on location-specific factors, underlying building characteristics, and the level of aggregation, offering a path towards more precise and adaptive distribution grid planning for the evolving energy landscape.

24 POWER TRANSMISSION AND DISTRIBUTION

Austin Solar Guide (Flyer)

This flyer was developed to guide homeowners on their solar journey and expand the benefits of solar to local residents. The guide is an overview of various energy and solar programs and services through the Austin Energy utility with tips for spotting scams, a summary of common terms when designing a solar system, and considerations when searching for a solar contractor.

14 SOLAR ENERGY

Safely Exploring Solar: A Guide for Austin Energy Customers

It's easy to get overwhelmed as you start to explore your solar options. There is a wealth of information available out there, particularly online, and it can be hard to know who to trust. This informational guide has been adapted from Austin Energy's Solar Education Course and other national best practice resources, as of May 1, 2023. It will help you understand some of the key concepts and resources available to help you on your solar journey if you have a home in Austin Energy's service territory and are considering installing solar. This document includes: (1) Austin Energy Programs and Services Related to Solar; (2) Tips for Spotting a Solar Scam; (3) Things to Know When Designing Your System; (4) Key Considerations When Shopping for a Solar Contractor; and (5) Final Takeaways.

14 SOLAR ENERGY

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS

Architecting the Grid Edge: Ensuring Reliability and Resilience

Changes in technology, customer expectations, and business and regulatory environments are rapidly evolving causing fundamental changes in the nation’s electrical infrastructure. Nowhere is this more apparent that at the “grid edge”, where there is an increasing number of new devices and systems, as well as complex new interactions between them. This is leading to the traditional relationship between the end-use customers and their utilities being expanded by an increasing number of stakeholders, each with their own operational and financial objectives, governed by regulatory policy. While there are concerns about the rapidly increasing complexity negatively impacting reliable and resilience of the electrical infrastructure, these changes are also bringing new resources and opportunities that hold great potential if they can be properly coordinated. This white paper outlines the considerations for the coordination of multi-stakeholder objectives with electric utility requirements using the concept of grid services. Describing a framework that enables new stakeholders to achieve their local technical and economic objectives, while simultaneously delivering operational benefits to the electrical infrastructure. The concepts of grid architecture are presented as a tool to evaluate how stakeholders might participate in, and benefit from, services, and how utilities can make decision on the reliance on services to ensure reliability and resilience, translating abstract concepts into actionable information for utilities and grid edge stakeholders. The end result of proper coordination, informed by grid architecture, will be a range of new devices and systems, operated by new stakeholders, achieving their local objectives while also increasing the reliability, resilience, security, and affordability of the nation’s critical electrical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION

Architecting the Grid Edge: Ensuring Reliability and Resilience

Changes in technology, customer expectations, and business and regulatory environments are rapidly evolving causing fundamental changes in the nation’s electrical infrastructure. Nowhere is this more apparent that at the “grid edge”, where there is an increasing number of new devices and systems, as well as complex new interactions between them. This is leading to the traditional relationship between the end-use customers and their utilities being expanded by an increasing number of stakeholders, each with their own operational and financial objectives, governed by regulatory policy. While there are concerns about the rapidly increasing complexity negatively impacting reliable and resilience of the electrical infrastructure, these changes are also bringing new resources and opportunities that hold great potential if they can be properly coordinated. This white paper outlines the considerations for the coordination of multi-stakeholder objectives with electric utility requirements using the concept of grid services. Describing a framework that enables new stakeholders to achieve their local technical and economic objectives, while simultaneously delivering operational benefits to the electrical infrastructure. The concepts of grid architecture are presented as a tool to evaluate how stakeholders might participate in, and benefit from, services, and how utilities can make decision on the reliance on services to ensure reliability and resilience, translating abstract concepts into actionable information for utilities and grid edge stakeholders. The end result of proper coordination, informed by grid architecture, will be a range of new devices and systems, operated by new stakeholders, achieving their local objectives while also increasing the reliability, resilience, security, and affordability of the nation’s critical electrical infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION

Containers on Switches: A Cluster School Experience

Network switches, such as those from Arista and Mellanox, often have underutilized computational resources in the form of built-in processors and memory. By leveraging these untapped resources, we can optimize functionality and efficiency of computational cluster networks. Our research focuses on deploying containers directly onto these switches to execute various auxiliary tasks ranging from metric logging to system-wide management via post-boot configuration. By doing so, we can significantly enchance the capabilities of the cluster without the need for additional dedicated hardware. Our research involved five distinct scenarios where switch utilization could have a profound impact on HPC Clusters: run cloud-init services via link-local connection; configuring a Telegraf container to export metrics; deploying a caching proxy; creating a reconfigurable IPv6 DHCP/DNS provider for VLAN; and implementing a client detection with Magellan discovery. These scenarios were containerized with podman and docker, and tested both physically on the switch virtually on a QEMU VM both running SONiC OS. Testing and findings indicate that network switches can indeed be used for these scenarios. They offer a wide range of possibilities beyond these applications. They run as expected as containers on the switches, and although there were some minor issues, work-arounds were implemented. Overall, this is a positive result that can be further explored with more scenarios.

97 MATHEMATICS AND COMPUTING

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)

Electrolyte and Cutoff Potential Effects on Cycle Life of Li4Ti5O12/LiNi0.9Mn0.1O2 Batteries for Behind-the-Meter Storage Applications

Behind-the-Meter Storage (BTMS) is a stationary battery energy storage system that is connected to the electrical distribution system on the customer's side of the utility's service meter. BTMS systems are used to store electrical energy from the grid as well as inconstant, renewable energy, such as local solar and wind generation. A successful BTMS system will allow the customer to pair their energy generation and storage to optimize electrical consumption from the grid, improving reliability and minimizing cost. For BTMS applications, batteries must be designed and optimized with different set of criteria from other leading segments of the Li-ion battery market, like transportation, due the system being stationary and proximal to the residential or commercial building it's benefitting. BTMS applications prioritize safety, cost (low/no-critical materials), reliability (20-year calendar life), and durability (10,000 cycle life), while having the ability to (minimally) compromise energy density and rate capability. Lithium titanate (Li4Ti5O12-, LTO) is a promising anode candidate for BTMS applications due to its high safety and capacity retention, while maintaining a reasonable 160 mAhg-1 reversable capacity and composition of relatively abundant materials. (1) Specifically, LTO has a high working voltage which helps to prevent Li dendrite formation, improving safety. Furthermore, LTO also has negligible lithiation-based volume change, leading to less mechanical pulverization, or loss of active material, upon cycling. For the cathode, materials with little or no Co are of high interest due to the high cost and low abundance of Co. LiMn2O4 (LMO) has been paired with LTO for BTMS applications in the past due to its safety, low cost (abundancy), and reasonably high operating voltage. (2-4) However, the low capacity of LMO limits energy density and specific energy. While not the highest priority for BTMS applications, increasing energy density will enable deployment in space constrained BTMS applications and decrease total cost. LiNi0.9Mn0.1O2 (LN-MO) is a recently developed material with promise due to its high operating voltage and relatively low price. (5) However, Ni-rich layered oxides, including LNMO, tend to struggle with capacity retention during high-voltage cycling due to mechanical pulverization, irreversible phase transitions, and unstable solid-electrolyte interphase. The study presented here focuses on building an understanding of how electrolyte solvent and varied cutoff potentials will impact the cycle life of LTO/LN-MO cells. Specifically, a comparison is provided between ethylene carbonate (EC), ethyl methyl carbonate (EMC), fluoroethylene carbonate (FEC), and Gen2 electrolyte solvents with 1M Lithium hexafluorophosphate (LiPF6) salt, cycling to two upper termination potentials, 2.6V and 2.7V. Electrochemical testing and diagnostics (e.g., differential capacity analysis, area specific impedance, constant voltage hold, and rate capability) and post-mortem characterization will be used to understand the aging behavior and failure mechanisms of the 8 cell combinations (four electrolytes and two voltage cutoffs). Cells with FEC electrolyte showed a lower initial capacity compared to cells with Gen2, EMC, and EC cycling at both voltages; however, the cells with FEC showed consistent trends in capacity retention with 2.6V and 2.7V termination potentials, while the cells with the other electrolytes showed much higher rates of capacity loss when cycling to the higher voltage. These results indicate that FEC may play a role in improving durability of high-voltage, Ni-rich electrode systems for use in high-cycle applications, such as BTMS.

electrolyte

BIL GRID-READY WIND: Reliable and Economical Grid Services Design, Implementation, and Demonstration at the Great Pathfinder Wind Power Plant

The GRID-READY WIND project aimed to demonstrate the ability of utility-scale wind power plants (WPPs) to deliver traditional and emerging grid services (GSs) in both grid-following (GFL) and grid-forming (GFM) modes through a centralized control framework, supplemented by local control adjustments at the wind turbine generator as needed. Throughout the project, the team offered recommendations on how the grid services demonstrated with WPPs could be applied to other inverter-based resources (IBRs), such as photovoltaic (PV) systems and battery energy storage systems (BESS), while considering the unique dynamics of these resources arising from their energy generation characteristics. The project sought to enhance the confidence of system operators (SOs) and planners in utilizing WPPs, alongside other IBRs such as PV plants and BESS, to provide essential grid services over extended periods under diverse operating conditions, thereby supporting their integration into the bulk power system.

17 WIND ENERGY

An Engineering Approach for Weld Creep Lifetime Assessment Based on Local Property Measurement

The localized creep failure in the heat-affected zone (HAZ) of Grade 91 steel weldments has been identified as one of the most important factors causing significantly shortened service lifetime and structural integrity issues of welded components in advanced fossil and nuclear power plants. To conduct a reliable creep lifetime assessment, a new engineering assessment approach has been developed by incorporating the experimentally determined local properties of the heterogeneous HAZ. By creep testing a purposely simulated HAZ specimen with in situ digital image correlation (DIC) technique, the highly gradient creep properties across the HAZ of Grade 91 steel was quantitatively measured. A physical creep cavitation constitutive model was proposed to investigate the local creep deformation and damage accumulation within the heterogeneous HAZ, which takes into account the nucleation of creep cavities and their growth by both grain boundary diffusion and creep deformation. The relationship among the local material property, creep strain accumulation, and evolution characteristic of creep cavities was established. The approach was then utilized to investigate the creep response and subsequent life for an ex-service 9% Cr steel weldment by incorporating the effects of pre-existing damages which developed and accumulated during long-term services. The predicted results exhibited quantitative agreement with the DIC measurement in terms of both nominal/local creep deformation as well as the subsequent life under the test conditions at 650 and 80 MPa.

Zhang, Wei

Utility Finder (U-Finder) Tool

U-Finder allows users to search for and identify local utility partners and electric vehicle charger incentives by state or ZIP code. U-Finder pulls from the Homeland Infrastructure Foundation-Level Database of Electric Retail Service Territories to identify utility service territories. Utility incentive listings are provided by utility associations, and state government incentive listings are pulled from the Alternative Fuels Data Center Laws and Incentives website. ![U Finder landing page](ufinder-landing.png)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Cloud-Based Demonstration of the Eastern Interconnection Situational Awareness Monitoring System (ESAMS)

This report describes a cloud-based implementation and field demonstration of the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS). ESAMS was developed to support the detection and source localization of forced oscillations using synchrophasor measurements from tie-lines connecting areas served by different reliability coordinators (RCs), so that RCs could better coordinate their response to wide-area events. A previous effort had identified deployment barriers associated with hosting shared situational awareness tools at a single RC. To address these barriers, ESAMS was migrated to Amazon Web Services and evaluated in a six-month field demonstration. ISO New England (ISO-NE) and PJM streamed data to the platform using AWS Direct Connect and a site-to-site VPN, respectively. The resulting multi-utility measurement footprint enabled regional source localization across major portions of the U.S. Eastern Interconnection and supported routine identification of oscillation events. During the final three months of the trial, 24 events above 2 MW/MVAR were detected. The largest detected oscillation approached a 25 MW peak-to-peak amplitude, and the longest persisted intermittently for more than 11 hours. The demonstration also assessed operational considerations—including data transfer volumes, end-to-end latency, and cloud computing costs—and found that network and compute requirements were modest relative to typical cloud capabilities while providing performance comparable to prior on-premises deployments. Overall, the results indicate that cloud hosting can provide a practical path to shared interconnection-wide oscillation monitoring. The cloud ESAMS demonstration establishes a foundation for broader utility participation and for building future wide-area analytics that leverage measurements across organizational boundaries.

Follum, James D.

Charging Hub Scenario Sheet Screenshot

The Excel-based CHECT tool estimates the LCOC ($/kWh) by charger type (Level 1, Level 2, and DC fast charging) for a given charging hub scenario. CHECT requires users to input certain charging hub scenario parameters, including the number of chargers, daily utilization, and charger replacement frequency by charger type. Additional inputs such as the charging schedule, local utility rates, capital/operational costs, and financial inputs can be customized by the user, or the tool can generate results using appropriate default values from literature for the charging hub scenario and service location(s). Using the above inputs, CHECT performs a robust techno-economic analysis to generate the LCOC by charger type, broken down by cost category (e.g., capital, operational, utility, taxes) for various combinations of charging hub types (multiunit dwelling or public) and ownership models (residential, utility, or private company). It also outputs the annual discounted cash flows and determines the most sensitive input variables. In addition, the tool allows users to easily compare the LCOC across various ownership models or across different states.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Track reconstruction as a service for collider physics

Optimizing charged-particle track reconstruction algorithms is crucial for efficient event reconstruction in Large Hadron Collider (LHC) experiments due to their significant computational demands. Existing track reconstruction algorithms have been adapted to run on massively parallel coprocessors, such as graphics processing units (GPUs), to reduce processing time. Nevertheless, challenges remain in fully harnessing the computational capacity of coprocessors in a scalable and non-disruptive manner. This paper proposes an inference-as-a-service approach for particle tracking in high energy physics experiments. To evaluate the efficacy of this approach, two distinct tracking algorithms are tested: Patatrack, a rule-based algorithm, and Exa.TrkX, a machine learning-based algorithm. The as-a-service implementations show enhanced GPU utilization and can process requests from multiple CPU cores concurrently without increasing per-request latency. The impact of data transfer is minimal and insignificant compared to running on local coprocessors. This approach greatly improves the computational efficiency of charged particle tracking, providing a solution to the computing challenges anticipated in the High-Luminosity LHC era.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND

The Building Business Network (B-Biz): Addressing Gaps in the High-Performance Building Technology Market, Especially for Underserved Customers

Increased market intelligence and business model innovation is needed to build contractor confidence in high-performance building technologies in order to increase the speed and scale of adoption to meet the U.S. Department of Energy's building stock decarbonization goals. Although there have been important innovations in energy efficiency, affordability, and decarbonization of building technologies, consumers are not purchasing these technologies at the necessary speed and scale partially due to a gap in institutional understanding around barriers contractors face in providing and servicing these technologies. Small businesses in this market must mitigate risk around high-performance building technologies, limiting their opportunities in the market and impacting the rate of adoption. The Building Business Network (B-Biz) aims to provide high-performance building technology solutions to underserved customers by collaborating with local small businesses that provide and service high-performance building technologies in communities with the lowest rates of adoption. This research explores the current market, the importance of business models, and the opportunity to utilize small businesses to address market gaps in underserved communities.

B-Biz

Joint Optimization of Multimodal Transit Frequency and Shared Autonomous Vehicle Fleet Size with Hybrid Metaheuristic and Nonlinear Programming

Shared autonomous vehicles (SAVs) bring competition to traditional transit services but redesigning multimodal transit network can utilize SAVs as feeders to enhance service efficiency and coverage. This paper presents an optimization framework for the joint multimodal transit frequency and SAV fleet size problem, a variant of the transit network frequency setting problem. The objective is to maximize total transit ridership (including SAV-fed trips and subtracting boarding rejections) across multiple time periods under budget constraints, considering endogenous mode choice (transit, point-to-point SAVs, driving) and route selection, while allowing for strategic route removal by setting frequencies to zero. Due to the problem’s non-linear, non-convex nature and the computational challenges of large-scale networks, we develop a hybrid solution approach that combines a metaheuristic approach (particle swarm optimization) with nonlinear programming for local solution refinement. To ensure computational tractability, the framework integrates analytical approximation models for SAV waiting times based on fleet utilization, multimodal network assignment for route choice, and multinomial logit mode choice behavior, bypassing the need for computationally intensive simulations within the main optimization loop. Applied to the Chicago metropolitan area’s multimodal network, our method illustrates a 33.3% increase in transit ridership through optimized transit route frequencies and SAV integration, particularly enhancing off-peak service accessibility and strategically reallocating resources.

Ng, Max